CN204402035U - 剪力墙模板支撑结构 - Google Patents
剪力墙模板支撑结构 Download PDFInfo
- Publication number
- CN204402035U CN204402035U CN201420862007.XU CN201420862007U CN204402035U CN 204402035 U CN204402035 U CN 204402035U CN 201420862007 U CN201420862007 U CN 201420862007U CN 204402035 U CN204402035 U CN 204402035U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- fitting
- fastener
- built
- wall form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型公开了一种剪力墙模板支撑结构,包括预埋件、顶丝、套装在顶丝上的钢管、固定安装在钢管中部的调整扣件、固定安装在钢管顶端的上部扣件和借助于调整扣件安装在钢管外侧的倾角调整机构,所述预埋件为埋设在下部楼板混凝土内的马鞍形钢件,所述调整机构包括扣设在调整扣件上的山形件、穿过山形件设置的拉杆和与拉杆上端配合的螺母,所述拉杆与钢管平行设置、且其下端与预埋件连接;其优点在于:通过在支设好的墙体模板支撑的两侧配套安装底部借助于顶丝顶在预埋件上的钢管加固墙体模板,然后使用墙体模板和墙体模板支撑来支撑顶模的重量,缩短支模时间,便于控制顶模与墙体模板之间的位置,不易发生相对位移。
Description
技术领域
本实用新型涉及剪力墙施工过程中的模板支撑技术领域,尤其涉及一种剪力墙模板支撑结构。
背景技术
在传统剪力墙施工过程中,墙体模板和顶模支设是关键环节,一般是先在预浇筑墙体两侧支设模板支撑,然后在模板支撑内侧使用穿墙螺栓支设墙体模板,同时支设顶模,最后用模板支撑将墙体模板和顶模固定成一体结构,顶模的支设需要使用大量支架,虽然使用模板支撑将墙体模板和顶模固定成一体结构,但是墙体模板和顶模的支撑是独立的,两者之间无支撑关系,结构复杂,支模时间长,影响工期,在混凝土浇筑过程中容易发生相对位移,影响工程质量。
实用新型内容
本实用新型所要解决的技术问题是提供一种剪力墙模板支撑结构,通过在支设好的墙体模板支撑的两侧配套安装底部借助于顶丝顶在预埋件上的钢管加固墙体模板,然后使用墙体模板和墙体模板支撑来支撑顶模的重量,只需在顶模中部分散支设少量支架即可满足要求,一方面简化模板支撑体系,缩短支模时间,另外一方面,使用墙体模板支撑顶模的方式,便于控制顶模与墙体模板之间的位置,不易发生相对位移。
为解决上述技术问题,本实用新型所采取的技术方案是:一种剪力墙模板支撑结构,包括预埋件、顶丝、套装在顶丝上的钢管、固定安装在钢管中部的调整扣件、固定安装在钢管顶端的上部扣件和借助于调整扣件安装在钢管外侧的倾角调整机构,所述预埋件为埋设在下部楼板混凝土内的马鞍形钢件,所述调整机构包括扣设在调整扣件上的山形件、穿过山形件设置的拉杆和与拉杆上端配合的螺母,所述拉杆与钢管平行设置、且其下端与预埋件连接。
所述上部扣件和调整扣件均为十字扣件,上部扣件一侧与钢管固定连接,另外一侧在使用时用于和墙体模板加固钢管连接。
采用上述技术方案所产生的有益效果在于:通过在支设好的墙体模板支撑的两侧配套安装底部借助于顶丝顶在预埋件上的钢管加固墙体模板,然后使用墙体模板和墙体模板支撑来支撑顶模的重量,只需在顶模中部分散支设少量支架即可满足要求,一方面简化模板支撑体系,缩短支模时间,另外一方面,使用墙体模板支撑顶模的方式,便于控制顶模与墙体模板之间的位置,不易发生相对位移。
附图说明
图1是本实用新型结构示意图;
图2是顶丝结构示意图;
在附图中:1、楼板;2、钢管;3、调整扣件;4、上部扣件;5、山形件;6、拉杆;7、预埋件;8、顶丝;8-1、底板;8-2、调整螺母;8-3、丝杆。
具体实施方式
下面结合附图和具体实施方式对本实用新型作进一步详细的说明;
为了解决现有剪力墙模板支撑体系中墙体模板和顶模之间无支撑关系,支撑结构复杂,容易移位的问题,本实用新型提供了一种如图1所示的剪力墙模板支撑结构,包括预埋件7、顶丝8(参见附图2)、套装在顶丝8上的钢管2、固定安装在钢管2中部的调整扣件3、固定安装在钢管2顶端的上部扣件4和借助于调整扣件3安装在钢管2外侧的倾角调整机构,所述预埋件7为埋设在下部楼板1混凝土内的马鞍形钢件,所述调整机构包括扣设在调整扣件3上的山形件5、穿过山形件5设置的拉杆6和与拉杆6上端配合的螺母,所述拉杆6与钢管2平行设置、且其下端与预埋件7连接;所述上部扣件4和调整扣件3均为十字扣件,上部扣件4一侧与钢管2固定连接,另外一侧在使用时用于和墙体模板加固钢管连接.
在具体应用过程中,首先在下部楼板1的混凝土浇筑过程中埋设预埋件,预埋件的位置和数量根据上部墙体周长确定,待下部楼板的强度达到能够支设上部墙体模板和顶模时,先支设墙体模板支撑,然后在墙体模板支撑内侧支设墙体模板,并使用本实用新型所公开的装置连接预埋件和墙体模板支撑钢管,在连接过程中,底板8-1顶住预埋件,拉杆下端钩住预埋件,通过调整顶丝上的调整螺母8-2调整整体长度,而且能够粗调墙体模板支撑的角度,拉杆的作用在于调整钢管的倾角,完成墙体模板支撑后,开始支设顶模,顶模可以直接支撑在墙体模板支撑上,中部简单设置少量支架即可达到支撑要求,使顶模和墙体模板形成一体结构,有效防止混凝土浇筑过程中发生位移,改善浇筑质量。
总之,本实用新型通过在支设好的墙体模板支撑的两侧配套安装底部借助于顶丝顶在预埋件上的钢管加固墙体模板,然后使用墙体模板和墙体模板支撑来支撑顶模的重量,只需在顶模中部分散支设少量支架即可满足要求,一方面简化模板支撑体系,缩短支模时间,另外一方面,使用墙体模板支撑顶模的方式,便于控制顶模与墙体模板之间的位置,不易发生相对位移。
Claims (2)
1.一种剪力墙模板支撑结构,其特征在于:包括预埋件(7)、顶丝(8)、套装在顶丝(8)上的钢管(2)、固定安装在钢管(2)中部的调整扣件(3)、固定安装在钢管(2)顶端的上部扣件(4)和借助于调整扣件(3)安装在钢管(2)外侧的倾角调整机构,所述预埋件(7)为埋设在下部楼板(1)混凝土内的马鞍形钢件,所述调整机构包括扣设在调整扣件(3)上的山形件(5)、穿过山形件(5)设置的拉杆(6)和与拉杆(6)上端配合的螺母,所述拉杆(6)与钢管(2)平行设置、且其下端与预埋件(7)连接。
2.根据权利要求1所述的剪力墙模板支撑结构,其特征在于:所述上部扣件(4)和调整扣件(3)均为十字扣件,上部扣件(4)一侧与钢管(2)固定连接,另外一侧在使用时用于和墙体模板加固钢管连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420862007.XU CN204402035U (zh) | 2014-12-31 | 2014-12-31 | 剪力墙模板支撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420862007.XU CN204402035U (zh) | 2014-12-31 | 2014-12-31 | 剪力墙模板支撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204402035U true CN204402035U (zh) | 2015-06-17 |
Family
ID=53425908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420862007.XU Expired - Fee Related CN204402035U (zh) | 2014-12-31 | 2014-12-31 | 剪力墙模板支撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204402035U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296199A (zh) * | 2018-10-12 | 2019-02-01 | 上海宝冶集团有限公司 | 一种加固组件 |
-
2014
- 2014-12-31 CN CN201420862007.XU patent/CN204402035U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296199A (zh) * | 2018-10-12 | 2019-02-01 | 上海宝冶集团有限公司 | 一种加固组件 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103850352B (zh) | 一种预制板的连接方法 | |
CN106639336A (zh) | 预制混凝土墙板安装就位导向调整装置及其施工方法 | |
CN102383593B (zh) | 厨卫间翻边混凝土一次成型支模装置及施工方法 | |
CN106193566A (zh) | 一种装配整体式剪力墙结构可调式外挂架 | |
CN207177102U (zh) | 预制转换层预留套筒插筋精准定位装置 | |
CN102080384B (zh) | 地下车库顶板上安装升降机施工方法 | |
CN105155830A (zh) | 组合式固定整体提升电梯井定型化操作平台的施工方法 | |
CN202990391U (zh) | 一种多功能模板支撑架 | |
CN209686857U (zh) | 深基坑地下室外墙型钢支架斜撑单侧支模体系 | |
CN204402035U (zh) | 剪力墙模板支撑结构 | |
CN207499451U (zh) | 地下室外墙单面支模装置 | |
CN204212447U (zh) | 门窗混凝土拱形过梁加固施工装置 | |
CN203889454U (zh) | 一种涵洞墙体施工模板整体移动装置 | |
CN203891468U (zh) | 浇筑建筑管线预埋件用的固定装置 | |
CN204715764U (zh) | 一种构造柱与主体结构同时施工的结构 | |
CN202248865U (zh) | 厨卫间翻边混凝土一次成型支模装置及施工方法 | |
CN106567538B (zh) | 一种卫生间混凝土翻边的定位模具 | |
CN102653947B (zh) | 地下预埋钢构件限位调直施工方法 | |
CN204510688U (zh) | 一种预制外墙板的临时固定结构 | |
CN103321405A (zh) | 剪力墙、筒体混凝土结构大模板提升式施工方法 | |
CN203878756U (zh) | 预埋连接装置 | |
CN104878926A (zh) | 一种悬挂模板体系施工方法及可周转支托 | |
CN105317191A (zh) | 一种预制外墙板的临时固定方法及结构 | |
CN202164555U (zh) | 砼箱涵模板支架立柱底支撑 | |
CN205063336U (zh) | 一种卫生间混凝土翻边的定位模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 Termination date: 20181231 |
|
CF01 | Termination of patent right due to non-payment of annual fee |