CN204401073U - Insulation pit annealing furnace - Google Patents

Insulation pit annealing furnace Download PDF

Info

Publication number
CN204401073U
CN204401073U CN201520052468.5U CN201520052468U CN204401073U CN 204401073 U CN204401073 U CN 204401073U CN 201520052468 U CN201520052468 U CN 201520052468U CN 204401073 U CN204401073 U CN 204401073U
Authority
CN
China
Prior art keywords
heater
bell
heating tube
insulation
temperature flame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520052468.5U
Other languages
Chinese (zh)
Inventor
安凤占
王传利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI XINGSHUO SAW CO Ltd
Original Assignee
HEBEI XINGSHUO SAW CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI XINGSHUO SAW CO Ltd filed Critical HEBEI XINGSHUO SAW CO Ltd
Priority to CN201520052468.5U priority Critical patent/CN204401073U/en
Application granted granted Critical
Publication of CN204401073U publication Critical patent/CN204401073U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

The utility model relates to steel ingot demoulding annealing kiln, specifically a kind of insulation pit annealing furnace.Comprise body of heater, bell, heating tube, below described body of heater embed wholly earth's surface, in depression hole structure, outer body of heater is made up of high-temperature flame-proof cement furnace wall, high-temperature flame-proof cement furnace wall medial surface adds adiabator layer, internal layer body of heater is formed by being incubated brick wall, and heating tube is placed between described adiabator layer and described insulation brick wall; Bell is made up of the lagging material of filling in the shell of Plate Welding and shell, and it is suitable for reading that bell is placed in body of heater, bell and body of heater suitable for reading between be provided with stainless steel packing ring.The utility model significantly can improve the quality of steel ingot tempering, the generation of the quality problems such as greatly reduce lobe in annealing process and burst, alleviate the labour intensity of worker simultaneously, improve the security of work, and serve the effect of certain save energy.

Description

Insulation pit annealing furnace
Technical field
The utility model relates to steel ingot demoulding annealing kiln, specifically a kind of insulation pit annealing furnace.
Background technology
For a long time, the high-carbon high-alloy steel grade being representative with W6Mo5Cr4V2, Cr12MoV, CrWMn etc., because its steel ingot internal stress is large, hardness is high, crystallographic texture is complicated, therefore ingot quality control difficulty is large, particularly surface of steel ingot lobe such as to burst at the problem, is the main Quality of special steel steel-making always.
The method that the steel-making of most of special steel adopts is 800 DEG C ± 10 DEG C time after the steel billet demoulding, directly load to be heated to >=annealing furnace of 700 DEG C in, after steel billet reaches shove charge quantity by the time, performs intensification, insulation, annealing process of lowering the temperature, this is attire annealing process.Or after steel billet 800 DEG C ± 10 DEG C demouldings, loading the holding pit built with coke, char combustion heat-dissipating ensures holding pit temperature-stable, then reach after some amount until steel ingot, load in annealing furnace together, perform the annealing process of intensification, insulation, cooling, this is hot charging annealing process again.General ingot mold and the weight ratio of steel ingot are greater than 1.5:1, cause the process for processing cycle long, and steel billet attire is annealed or hot charging annealing steel billet enters furnace operating difficulty, and labour intensity is large; And once steel billet process not in time, between 700 DEG C-800 DEG C, chilling can cause steel billet lobe or the quality problems such as seriously burst.
Utility model content
The utility model is intended to solve above-mentioned steel ingot demoulding annealing Problems existing, and a kind of insulation pit annealing furnace integrating holding pit and annealing furnace function is provided, steel ingot is incubated, annealing two procedures is combined into a procedure, with the quality problems such as effectively solve rapid tool steel, the cold and hot lobe caused in the demoulding, insulation, annealing process without magnetic die steel and alloy tool steel bursts.
The technical scheme that the utility model solves the employing of described problem is:
A kind of insulation pit annealing furnace, comprise body of heater, bell, heating tube, below described body of heater embed wholly earth's surface, in depression hole structure, outer body of heater is made up of high-temperature flame-proof cement furnace wall, high-temperature flame-proof cement furnace wall medial surface adds adiabator layer, and internal layer body of heater is formed by being incubated brick wall, and heating tube is placed between described adiabator layer and described insulation brick wall; Bell is made up of the lagging material of filling in the shell of Plate Welding and shell, and it is suitable for reading that bell is placed in body of heater, bell and body of heater suitable for reading between be provided with stainless steel packing ring.
Adopt the utility model of technique scheme, compared with prior art, its beneficial effect is:
Significantly can improve the quality of steel ingot tempering, greatly reduce lobe and the generation of quality problems such as bursting in annealing process, alleviate the labour intensity of worker simultaneously, improve the security of work, and serve the effect of certain save energy.
As preferably, the further technical scheme of the utility model is:
Described adiabator layer is installed at the high-temperature flame-proof cement furnace wall medial surface forming body of heater annular wall portions.
Described heating tube is the multiple resistance heating tubes be connected with the thermopair of watch-dog.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment;
In figure: high-temperature flame-proof cement furnace wall 1, resistance heating tube 2, bell shell 3, lagging material 4, insulation brick wall 5, stainless steel packing ring 6, adiabator layer 7.
Embodiment
The embodiment provided below in conjunction with accompanying drawing is further elaborated the utility model, but embodiment does not form any restriction to the utility model.
See Fig. 1, the insulation pit annealing furnace that the present embodiment provides, be made up of body of heater, bell, heating tube three part, below body of heater embed wholly earth's surface, in depression hole structure, outer body of heater is made up of high-temperature flame-proof cement furnace wall 1, high-temperature flame-proof cement furnace wall 1 medial surface of body of heater annular wall portions adds adiabator layer 7, internal layer body of heater is formed by being incubated brick wall 5, heating tube is placed between adiabator layer 7 and insulation brick wall 5, and heating tube is the multiple resistance heating tubes 2 be connected with the thermopair of watch-dog; Bell is made up of the lagging material 4 of filling in the bell shell 3 of Plate Welding and shell, and it is suitable for reading that bell is placed in body of heater, bell and body of heater suitable for reading between be provided with stainless steel packing ring 6.
The quantity of resistance heating tube 2 and the concrete position of each resistance heating tube 2 are determined according to the steel ingot quantity of placing in stove.During ingot annealing, in advance stove is heated up, then will the steel ingot of anneal be needed directly to hang in stove, cover bell, utilize heating tube to heat in stove, anneal according to ingot annealing technique, only complete steel ingot insulation, annealing two procedures with a procedure thus.
The foregoing is only the better feasible embodiment of the utility model, not thereby interest field of the present utility model is limited to, the equivalent structure change that all utilization the utility model specification sheetss and accompanying drawing content are done, is all contained within interest field of the present utility model.

Claims (3)

1. an insulation pit annealing furnace, comprise body of heater, bell, heating tube, it is characterized in that, below described body of heater embed wholly earth's surface, in depression hole structure, outer body of heater is made up of high-temperature flame-proof cement furnace wall, and high-temperature flame-proof cement furnace wall medial surface adds adiabator layer, internal layer body of heater is formed by being incubated brick wall, and heating tube is placed between described adiabator layer and described insulation brick wall; Bell is made up of the lagging material of filling in the shell of Plate Welding and shell, and it is suitable for reading that bell is placed in body of heater, bell and body of heater suitable for reading between be provided with stainless steel packing ring.
2. insulation pit annealing furnace according to claim 1, is characterized in that, described adiabator layer is installed at the high-temperature flame-proof cement furnace wall medial surface forming body of heater annular wall portions.
3. insulation pit annealing furnace according to claim 1, is characterized in that, described heating tube is the multiple resistance heating tubes be connected with the thermopair of watch-dog.
CN201520052468.5U 2015-01-26 2015-01-26 Insulation pit annealing furnace Active CN204401073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520052468.5U CN204401073U (en) 2015-01-26 2015-01-26 Insulation pit annealing furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520052468.5U CN204401073U (en) 2015-01-26 2015-01-26 Insulation pit annealing furnace

Publications (1)

Publication Number Publication Date
CN204401073U true CN204401073U (en) 2015-06-17

Family

ID=53424951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520052468.5U Active CN204401073U (en) 2015-01-26 2015-01-26 Insulation pit annealing furnace

Country Status (1)

Country Link
CN (1) CN204401073U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104498675A (en) * 2015-01-26 2015-04-08 河北星烁锯业股份有限公司 Insulating pit type annealing furnace and annealing treatment process
CN106247798A (en) * 2016-08-16 2016-12-21 四川伊索新型节能材料有限公司 It is incubated brickkiln down
CN107907571A (en) * 2017-11-13 2018-04-13 山西大学 One kind is used to characterize concrete explosive spalling degree test stove and test method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104498675A (en) * 2015-01-26 2015-04-08 河北星烁锯业股份有限公司 Insulating pit type annealing furnace and annealing treatment process
CN106247798A (en) * 2016-08-16 2016-12-21 四川伊索新型节能材料有限公司 It is incubated brickkiln down
CN107907571A (en) * 2017-11-13 2018-04-13 山西大学 One kind is used to characterize concrete explosive spalling degree test stove and test method

Similar Documents

Publication Publication Date Title
CN106077379B (en) A kind of forging technology of 0Cr23Ni13 heat-resistance stainless steel
CN204401073U (en) Insulation pit annealing furnace
CN106378456B (en) A kind of method for rapidly densifying for powder metallurgy superalloy component
CN109402340A (en) Horizontal vacuum atmosphere protection annealing furnace
CN103436758A (en) Preparation method of magnesium-aluminum-zinc-yttrium magnesium alloy semisolid slurry
CN104646419B (en) TiAl alloy is improved jacket and applies it and carry out the method that aximal deformation value rolls plate
CN103331417A (en) Cold mold module casting method
CN102795620B (en) A kind of hot pressure sintering stove for producing high purity graphite
CN104498675A (en) Insulating pit type annealing furnace and annealing treatment process
CN106623916A (en) Low-temperature sintering method for preparing neodymium-iron-boron magnet
CN201163099Y (en) Oil immersion type electromagnetic pipeline heater
CN103074573B (en) Horizontal non-muffle-tank gas nitriding furnace
CN103331446B (en) Low-temperature hot air circulation heat treatment furnace for magnetic core and application method of heat treatment furnace
CN206794979U (en) A kind of high-frequency gas protects soldering oven
CN101914671B (en) Steel ingot heating energy-saving method
CN203320110U (en) Nitriding furnace temperature measuring device
CN204329599U (en) A kind of insulation of the height for the production of metal-powder intermediate frequency furnace
CN209243105U (en) Horizontal vacuum atmosphere protection annealing furnace
CN106925858A (en) A kind of high-frequency gas protect soldering oven and its method of work
CN203728861U (en) Brick distribution structure with thermal conductivity gradient of hearth refractory
CN207891239U (en) A kind of medical glass all-electric melting furnace pedestal
CN206974175U (en) A kind of energy saving temperature controlling industrial furnace
CN201793815U (en) Temperature thermocouple sleeve evacuating device of photovoltaic polycrystalline silicon ingot furnace
CN204824184U (en) Produce high purity graphite's burning furnace that bakes over a slow fire
CN201762104U (en) Silicon nitride firing furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180904

Granted publication date: 20150617

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20210904

Granted publication date: 20150617

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210904

Granted publication date: 20150617