CN204327117U - The tunnel lining trolley structure of flexible overlap joint - Google Patents

The tunnel lining trolley structure of flexible overlap joint Download PDF

Info

Publication number
CN204327117U
CN204327117U CN201420787784.2U CN201420787784U CN204327117U CN 204327117 U CN204327117 U CN 204327117U CN 201420787784 U CN201420787784 U CN 201420787784U CN 204327117 U CN204327117 U CN 204327117U
Authority
CN
China
Prior art keywords
oil cylinder
door frame
top template
overlap joint
auxiliary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420787784.2U
Other languages
Chinese (zh)
Inventor
张岩波
李毓宏
吴锦龙
文新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN ZHONGTIAN CONSTRUCTION MACHINERY CO LTD
Original Assignee
FUJIAN ZHONGTIAN CONSTRUCTION MACHINERY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN ZHONGTIAN CONSTRUCTION MACHINERY CO LTD filed Critical FUJIAN ZHONGTIAN CONSTRUCTION MACHINERY CO LTD
Priority to CN201420787784.2U priority Critical patent/CN204327117U/en
Application granted granted Critical
Publication of CN204327117U publication Critical patent/CN204327117U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of tunnel lining trolley structure of flexibility overlap joint, and comprise a door frame, a top template and both sides mould, top template is installed on door frame by a top stand; Top stand comprises the yoke crosstie that complex root parallel interval is arranged, and every described yoke crosstie is all installed on door frame by longeron on two; The middle part of top template is connected one first oil cylinder, first oil cylinder supports auxiliary beam by first and is installed on yoke crosstie, the both ends of top template are connected one second oil cylinder respectively, second oil cylinder supports auxiliary beam by second and is installed on the crossbeam of door frame, both sides mould is connected respectively and has a plurality of the 3rd symmetrical oil cylinder, 3rd oil cylinder supports auxiliary beam respectively by the 3rd and is installed on the vertical beam of door frame, and the first oil cylinder, the second oil cylinder, the 3rd oil cylinder are all connected with a Hydraulic Station.The utility model avoids the generation in gap between trolley formwork and overlap joint cement surface, thus ensure that the fineness of the complete rear surface of rear tunnel double-lining of having constructed.

Description

The tunnel lining trolley structure of flexible overlap joint
[technical field]
The utility model relates to one and belongs to constructing tunnel equipment, is specifically related to a kind of tunnel lining trolley structure of flexibility overlap joint.
[background technology]
Tunnel lining trolley is the capital equipment of Tunnel Second Lining Construction, and it for constructing to the concrete-liner of tunnel inner wall, and has the development history of nearly 20 years in China.The production technology of current tunnel lining trolley is comparatively ripe, and structure is a more and more convergent change also.
Existing conventional tunnel lining trolley (for convenience of description, hereinafter referred to as " chassis ") length specification be 9 meters, 10 meters, 12 meters, because chassis length is longer, the outline radian of chassis front/rear end is difficult to ensure uniformity, particularly in work progress, due to chassis front and back end discontinuity, cause front/rear end to be out of shape and also make a world of difference, thus after construction completes and thes cement solidifies, shaping headroom end profile shape is also probabilistic, after a certain mould constructed by chassis, chassis moves forward, and move into place rear chassis rear end and previously shaping two served as a contrast the continuity that profiled outline carries out overlapping to guarantee that tunnel double-lining is shaped, in overlap joint process, because the outer contour shape of rear Side Template was with previously shaping two to serve as a contrast profiled outline shape inconsistent, when causing overlapping, trolley formwork panel has gap with overlap joint cement surface, and the existence in gap will cause construction time cement slurry flow out from gap, so namely, add the trouble in shutoff gap in construction, can be caused again having constructed the fineness of the complete rear surface of rear tunnel double-lining.
[utility model content]
Technical problem to be solved in the utility model is the tunnel lining trolley structure providing a kind of flexibility overlap joint, avoids the generation in gap between trolley formwork (top template and cheek board) and overlap joint cement surface.
The utility model solves the problems of the technologies described above by the following technical programs: a kind of tunnel lining trolley structure of flexibility overlap joint, comprise a door frame, a top template and two is connected limit mould in top template both ends respectively, described top template is installed on door frame by a top stand, and described limit mould is installed on door frame by complex root brace summer; Described top stand comprises the yoke crosstie that complex root parallel interval is arranged, and every described yoke crosstie is all installed on door frame by longeron on two; The middle part of described top template is connected one first oil cylinder, described first oil cylinder supports auxiliary beam by one first and is installed on yoke crosstie, the both ends of described top template are connected one second oil cylinder respectively, second oil cylinder described in two supports auxiliary beam by one second and is installed on the crossbeam of door frame, limit mould described in two is connected respectively and has a plurality of the 3rd symmetrical oil cylinder, each described 3rd oil cylinder supports auxiliary beam respectively by one the 3rd and is installed on the vertical beam of door frame, and described first oil cylinder, the second oil cylinder, the 3rd oil cylinder are all connected with a Hydraulic Station.
Further, limit mould described in two is connected respectively and has two the 3rd oil cylinders, and the 3rd oil cylinder on limit mould described in two is symmetrical one by one along the crossbeam center line of door frame.
The beneficial effect of the tunnel lining trolley structure of the utility model flexibility overlap joint is: by the setting of the first oil cylinder, the second oil cylinder and the 3rd oil cylinder, top template and cheek board shaping two can be served as a contrast profiled outline and paste extremely by force with previously, namely the generation in gap between trolley formwork (top template and cheek board) and overlap joint cement surface is avoided, thus avoid the trouble in shutoff gap in construction, and ensure that the fineness of the complete rear surface of rear tunnel double-lining of having constructed.
[accompanying drawing explanation]
The utility model will be further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the schematic diagram of the tunnel lining trolley structure of the utility model flexibility overlap joint.
[detailed description of the invention]
Refer to Fig. 1, the tunnel lining trolley structure of the utility model flexibility overlap joint, comprise door frame 1, top template 2 and two and be connected limit mould 3 in top template 1 both ends respectively, described top template 2 is installed on door frame 1 by a top stand 4, and described limit mould 3 is installed on door frame 1 by complex root brace summer 5, described top stand 4 comprises the yoke crosstie 41 that complex root parallel interval is arranged, and every described yoke crosstie 41 is all installed on door frame 1 by longeron 42 on two, the middle part of described top template 2 is connected one first oil cylinder 61, described first oil cylinder 61 supports auxiliary beam 71 by one first and is installed on yoke crosstie 41, the both ends of described top template 2 are connected one second oil cylinder 62 respectively, second oil cylinder 62 described in two supports auxiliary beam 72 by one second and is installed on the crossbeam 11 of door frame 1, limit mould 3 described in two is connected respectively and has a plurality of the 3rd symmetrical oil cylinder 63, each described 3rd oil cylinder 63 supports auxiliary beam 73 respectively by one the 3rd and is installed on the vertical beam 12 of door frame 1, and described first oil cylinder 61, second oil cylinder 62, 3rd oil cylinder 63 is all connected with a Hydraulic Station (not shown), this Hydraulic Station is the first oil cylinder 61, second oil cylinder 62, 3rd oil cylinder 63 fuel feeding.
In the present embodiment, the quantity of the 3rd oil cylinder 63 be connected respectively on both sides mould 3 is two, and in order to the both sides, tunnel after having made more symmetrical consistent, the 3rd oil cylinder 63 on both sides mould 3 is along the crossbeam 11 center line symmetrical design one by one of door frame 1.
During the utility model application, after a certain mould constructed by chassis, chassis moves forward, and move into place rear chassis rear end and previously shaping two served as a contrast the continuity that profiled outline carries out overlapping to guarantee that tunnel double-lining is shaped, in overlap joint process: under the acting in conjunction of the first oil cylinder 61 and the second oil cylinder 62, top template 2 to previously shaping two served as a contrast overlap joint cement surface corresponding on section and pasted extremely, and under the effect of the 3rd oil cylinder 63, both sides mould 3 equally to previously shaping two served as a contrast overlap joint cement surface corresponding on section and pasted extremely, namely achieve whole trolley formwork extremely to design with the two previously shaping seamless subsides of overlap joint cement surface serving as a contrast section.
To sum up, the utility model is by the setting of the first oil cylinder, the second oil cylinder and the 3rd oil cylinder, top template and cheek board shaping two can be served as a contrast profiled outline and paste extremely by force with previously, namely the generation in gap between trolley formwork (top template and cheek board) and overlap joint cement surface is avoided, thus avoid the trouble in shutoff gap in construction, and ensure that the fineness of the complete rear surface of rear tunnel double-lining of having constructed.

Claims (2)

1. the tunnel lining trolley structure of a flexible overlap joint, comprise a door frame, a top template and two is connected limit mould in top template both ends respectively, described top template is installed on door frame by a top stand, and described limit mould is installed on door frame by complex root brace summer; Described top stand comprises the yoke crosstie that complex root parallel interval is arranged, and every described yoke crosstie is all installed on door frame by longeron on two; It is characterized in that: the middle part of described top template is connected one first oil cylinder, described first oil cylinder supports auxiliary beam by one first and is installed on yoke crosstie, the both ends of described top template are connected one second oil cylinder respectively, second oil cylinder described in two supports auxiliary beam by one second and is installed on the crossbeam of door frame, limit mould described in two is connected respectively and has a plurality of the 3rd symmetrical oil cylinder, each described 3rd oil cylinder supports auxiliary beam respectively by one the 3rd and is installed on the vertical beam of door frame, and described first oil cylinder, the second oil cylinder, the 3rd oil cylinder are all connected with a Hydraulic Station.
2. the tunnel lining trolley structure of flexibility overlap joint according to claim 1, is characterized in that: limit mould described in two is connected respectively two the 3rd oil cylinders, and the 3rd oil cylinder on limit mould described in two is symmetrical one by one along the crossbeam center line of door frame.
CN201420787784.2U 2014-12-12 2014-12-12 The tunnel lining trolley structure of flexible overlap joint Expired - Fee Related CN204327117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420787784.2U CN204327117U (en) 2014-12-12 2014-12-12 The tunnel lining trolley structure of flexible overlap joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420787784.2U CN204327117U (en) 2014-12-12 2014-12-12 The tunnel lining trolley structure of flexible overlap joint

Publications (1)

Publication Number Publication Date
CN204327117U true CN204327117U (en) 2015-05-13

Family

ID=53163489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420787784.2U Expired - Fee Related CN204327117U (en) 2014-12-12 2014-12-12 The tunnel lining trolley structure of flexible overlap joint

Country Status (1)

Country Link
CN (1) CN204327117U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN110273695A (en) * 2019-07-13 2019-09-24 中国三冶集团有限公司 A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN110273695A (en) * 2019-07-13 2019-09-24 中国三冶集团有限公司 A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure

Similar Documents

Publication Publication Date Title
CN203856478U (en) Lining trolley applicable to tunnel with variable fracture surface
CN103032081B (en) Cross-river large-diameter slurry shield excavation and double-lining parallel construction method
CN204899941U (en) Whole movable tunnel ditch cable duct formworking jumbo
CN205206309U (en) Template for expansion joint
CN205012286U (en) Water conservancy torrent tank
CN204327117U (en) The tunnel lining trolley structure of flexible overlap joint
CN203229965U (en) 10 kV box-type substation basic standard module
CN104533450A (en) One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN204163400U (en) Subway station variable cross section tie template
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN204867878U (en) Steel grating mould
CN204530643U (en) A kind of combined concrete gool
CN208734344U (en) Collapsible tunneled central ditch construction template
CN203344161U (en) Mould-penetrating throwing rib demoulding structure for prefabricated component manufacturing
CN204627628U (en) The adjustable top template device of fully automatic hydraulic concrete-liner steel formwork trolley
CN204492851U (en) Metro built by mining method transverse passage-way temporary support component
CN204340231U (en) A kind of cylinder segment structure composite material component global formation frock of the easy demoulding
CN203130107U (en) Hydraulic tunnel inverted arch operation trolley
CN203649748U (en) Device for aligning head ends of flange plates and webs for H-shaped section steel assembly apparatus
CN111791400A (en) Wind power blade mold segmentation compatible design method
CN204435861U (en) For building the formwork structure of circular concrete column
CN204040626U (en) A kind of H-shaped connection strap building enclosing
CN204646258U (en) A kind of integral trolley
CN204344136U (en) A kind of inverted arch short abutment wall Combined type sizing punching block and screw mandrel location reinforcement system
CN203742164U (en) Stairway floor form

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20181212