CN204295871U - Pre-tensioned rail plate synchronous tension puts a control system - Google Patents

Pre-tensioned rail plate synchronous tension puts a control system Download PDF

Info

Publication number
CN204295871U
CN204295871U CN201420659218.3U CN201420659218U CN204295871U CN 204295871 U CN204295871 U CN 204295871U CN 201420659218 U CN201420659218 U CN 201420659218U CN 204295871 U CN204295871 U CN 204295871U
Authority
CN
China
Prior art keywords
longitudinal
transverse
track plates
rail plate
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420659218.3U
Other languages
Chinese (zh)
Inventor
谢铁桥
张玉光
张新
田桂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hejian Silver Dragon track Co., Ltd.
Original Assignee
Tianjin Silvery Dragon Prestressed Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Silvery Dragon Prestressed Materials Co Ltd filed Critical Tianjin Silvery Dragon Prestressed Materials Co Ltd
Priority to CN201420659218.3U priority Critical patent/CN204295871U/en
Application granted granted Critical
Publication of CN204295871U publication Critical patent/CN204295871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model provides pre-tensioned rail plate synchronous tension to put a control system, comprise pedestal, multiple mould, transverse stretching crossbeam, longitudinal stretch-drawing beam and hydraulic operation device being placed with track plates, hydraulic operation device is positioned on the tunnel body of wall inwall outside pedestal, transverse stretching crossbeam and longitudinal stretch-drawing beam are connected with corresponding hydraulic operation device respectively, pedestal is provided with some moulds arranged in length and breadth, makes pedestal to be formed multiple equally distributed longitudinal mold row and transverse mold row.Pre-tensioned rail plate synchronous tension puts a control system, solve existing track plates can not synchronous tension, to put and the problem that control accuracy is low, production efficiency is low, yield rate is low.The utility model can meet a present track plates Production requirement that synchronous or independent stretch-draw is put to transverse direction, longitudinal prestressing reinforcing bar, the accurate control of a process implementation is put to synchronous tension, its pre-stretch-draw tension force control accuracy can reach ± and 1%, substantially increase productivity ratio and track plates product qualified rate.

Description

Pre-tensioned rail plate synchronous tension puts a control system
Technical field
The invention belongs to tensioning system field, especially relates to a kind of pre-tensioned rail plate synchronous tension and puts a control system.
Background technology
Prestressing stretching technique in track plates batch production process is the core of track plates quality control, and the key of pre-stress integral stretch-draw and stretch-draw quality will depend on that the safety of tensioning system is with accurate.Existing track plates field all adopts the one dimension tension technology of Germany or Japan, this tensioning system is mainly in order to CRTS I type, CRTS II type track plates before coordinating only arrange the demand of one-dimensional square to deformed bar, its control procedure is the stretching process of simultaneous tension before and after adopting to deformed bar the one-dimensional square of track plates, its control accuracy is low, deformed bar spoilage is high, track plates disqualification rate is high, drastically increases production cost, reduces production efficiency simultaneously.Simultaneously, due to the CRTS III type track plates of China's independent research, its deformed bar adopts crisscross two-dimensional structure, and current existing tension technology carries out stretch-draw to CRTS III type track plates, and to put an operation be adopt longitudinally, the stretching process of the first post-stretching of transverse prestressed reinforcing steel bar, this process is not only to the bad control of its control accuracy, and product qualified rate is lower, in addition, the stretching process of first post-stretching requires the relevant device adding a lot of corresponding mould conversion direction in production line, not only increase production cost, and significantly reduce production efficiency.
Summary of the invention
The invention to solve existing track plates can not synchronous tension, to put and the problem that control accuracy is low, production efficiency is low, yield rate is low, provide a kind of pre-tensioned rail plate synchronous tension to put a control system.
For solving the problems of the technologies described above, the technical scheme that the invention adopts is: pre-tensioned rail plate synchronous tension puts a control system, comprise pedestal, multiple mould, transverse stretching crossbeam, longitudinal stretch-drawing beam and hydraulic operation device being placed with track plates, described hydraulic operation device is positioned on the tunnel body of wall inwall outside described pedestal, described transverse stretching crossbeam is connected with corresponding hydraulic operation device respectively with described longitudinal stretch-drawing beam
Described pedestal is provided with some described moulds arranged in length and breadth, make described pedestal to be formed multiple equally distributed longitudinal mold row and transverse mold row, the longitudinal prestressing reinforcing bar being positioned at the track plates that the described mould on each longitudinal mold row is placed all is interconnected by connector, the longitudinal prestressing reinforcing bar being positioned at the track plates that the described mould of described longitudinal mold row head end is placed is connected by the tunnel body of wall inwall outside connector and described pedestal, the longitudinal prestressing reinforcing bar being positioned at the track plates that the described mould of described longitudinal mold row tail end is placed is connected with described longitudinal stretch-drawing beam by connector, the transverse prestressed reinforcing steel bar being positioned at the track plates that the described mould on each transverse mold row is placed all is interconnected by connector, the transverse prestressed reinforcing steel bar being positioned at the track plates that the described mould of described transverse mold row head end is placed is connected by the tunnel body of wall inwall outside connector and described pedestal, the transverse prestressed reinforcing steel bar being positioned at the track plates that the described mould of described transverse mold row tail end is placed is connected with described transverse stretching crossbeam by connector.
Further, also comprise control device, described control device comprises the industrial computer, controller, Hydraulic Station, ball valve, oil filter and the servo valve that are connected successively, also comprise displacement transducer and pressure sensor, described servo valve, displacement transducer and pressure sensor are all positioned on described hydraulic operation device, and institute's displacement sensors is connected with described controller respectively with pressure sensor.
Further, described longitudinal mold is classified as four row, every two row described longitudinal mold row connections described longitudinal stretch-drawing beam.
Further, described transverse mold is classified as two row, often arranges the described transverse stretching crossbeam of described transverse mold row connection one.
Further, the two ends of each described longitudinal stretch-drawing beam respectively connect a described hydraulic operation device.
Further, the two ends of each described transverse stretching crossbeam respectively connect a described hydraulic operation device.
Further, be also provided with display, described display is connected with described controller.
The advantage that the invention has and good effect are: pre-tensioned rail plate synchronous tension puts a control system, solve existing track plates can not synchronous tension, to put and the problem that control accuracy is low, production efficiency is low, yield rate is low.Pre-tensioned rail plate synchronous tension disclosed in the invention puts a control system, a present track plates Production requirement that synchronous or independent stretch-draw is put to transverse direction, longitudinal prestressing reinforcing bar can be met, being set using by control device, the accurate control of a process implementation is put to synchronous tension, its pre-stretch-draw tension force control accuracy can reach ± and 1%, accurately the controlling of control device, on the basis boosted productivity, also substantially increases product qualified rate.
Accompanying drawing explanation
Fig. 1 is tensioning equipment structural representation;
Fig. 2 is Figure 1A place enlarged drawing;
Fig. 3 is control device functional block diagram.
In figure: 1, pedestal; 2, mould; 3, transverse stretching crossbeam; 4, longitudinal stretch-drawing beam; 5, hydraulic operation device; 6, track plates; 7, servo valve; 8, displacement transducer; 9, pressure sensor.
Detailed description of the invention
Elaborate below in conjunction with the specific embodiment of accompanying drawing to the invention.
As Fig. 1, preferred forms shown in 2, pre-tensioned rail plate synchronous tension puts a control system, comprise pedestal 1, multiple mould 2 being placed with track plates, transverse stretching crossbeam 3, longitudinal stretch-drawing beam 4 and hydraulic operation device 5, described hydraulic operation device 5 is positioned on the tunnel body of wall inwall outside described pedestal 1, described transverse stretching crossbeam 3 is connected with corresponding hydraulic operation device 5 respectively with described longitudinal stretch-drawing beam 4, described pedestal 1 is provided with some described moulds 2 arranged in length and breadth, make described pedestal 1 to be formed multiple equally distributed longitudinal mold row and transverse mold row, the longitudinal prestressing reinforcing bar being positioned at the track plates 6 that the described mould 2 on each longitudinal mold row is placed all is interconnected by connector, the longitudinal prestressing reinforcing bar being positioned at the track plates 6 that the described mould 2 of described longitudinal mold row head end is placed is connected by the tunnel body of wall inwall outside connector and described pedestal 1, the longitudinal prestressing reinforcing bar being positioned at the track plates 6 that the described mould 2 of described longitudinal mold row tail end is placed is connected with described longitudinal stretch-drawing beam 4 by connector, the transverse prestressed reinforcing steel bar being positioned at the track plates 6 that the described mould 2 on each transverse mold row is placed all is interconnected by connector, the transverse prestressed reinforcing steel bar being positioned at the track plates 6 that the described mould 2 of described transverse mold row head end is placed is connected by the tunnel body of wall inwall outside connector and described pedestal 1, the transverse prestressed reinforcing steel bar being positioned at the track plates 6 that the described mould 2 of described transverse mold row tail end is placed is connected with described transverse stretching crossbeam 3 by connector.Also comprise control device, described control device comprises industrial computer, controller, Hydraulic Station, ball valve, oil filter and the servo valve 7 be connected successively, also comprise displacement transducer 8 and pressure sensor 9, described servo valve 7, displacement transducer 8 and pressure sensor 9 are all positioned on described hydraulic operation device 5, and institute's displacement sensors 8 is connected with described controller respectively with pressure sensor 9.As shown in Figure 3.
Described longitudinal mold is classified as four row, every two row described longitudinal mold row connections described longitudinal stretch-drawing beam 4.Described transverse mold is classified as two row, often arranges the described transverse stretching crossbeam 3 of described transverse mold row connection one.The two ends of each described longitudinal stretch-drawing beam 4 respectively connect a described hydraulic operation device 5.The two ends of each described transverse stretching crossbeam 3 respectively connect a described hydraulic operation device 5.Also be provided with display and printer, described display is connected with described industrial computer respectively with described printer.
In preferred forms, SIEMENS PLC 300 selected by controller, it is chief component in control device, can require to carry out parameter designing according to user, can store therein actuating logic computing, sequential control, regularly, counting and the operational order such as arithmetic operator, and by input and output, production control process.Industrial computer adopts Siemens industrial computer, and it has stronger anti-harsh working environment ability, can in industrial environment 24 hours reliability services incessantly, Information Security highly makes system downtime minimize, and adds system availability.Hydraulic operation device 5 adopts hydraulic cylinder, is mainly to perform original paper.Hydraulic energy is changed into mechanical energy, does the hydraulic actuator of straight reciprocating motion by hydraulic cylinder.Servo valve 7 adoption rate servo valve, its valve port can open any one aperture as required, controls the size by flow thus.The reciprocal speed action control of hydraulic cylinder is carried out by the aperture size of controller control ratio servo valve.Hydraulic Station is hydraulic system chief component.Hydraulic Station rotates the hydraulic power source device be made up of hydraulic pump, drive motor, fuel tank, overflow valve etc. or the hydraulic means driven by motor oil pump comprising control valve, pump is bought oil after oil suction from fuel tank, be the pressure energy of hydraulic oil by changes mechanical energy, in the oil cylinder being transferred to hydraulic machinery through external pipeline after hydraulic oil is achieved direction, pressure, Flow-rate adjustment by integrated package (or valve combination) by hydraulic valve or oil motor, thus control the speed of the conversion in hydraulic cylinder direction, the size of strength and speed, promote the acting of various hydraulic machinery.Pressure is converted to the sensor that the signal of telecommunication exports by pressure sensor 9.It highly sensitive, precision good, can measure the accuracy of 0.1%.Displacement transducer 8 can monitor hydraulic cylinder misalignment in real time.Displacement transducer 8 have easily realize digitlization, precision is high, antijamming capability is strong, do not have artificial error in reading, easy for installation, use the advantages such as reliable.Oil filter adopts high-pressure filter, and the protection of high-pressure filter, can filter the oil circuit of whole hydraulic system, is that cylinder body and proportional servo valve better work.If high-pressure filter blocks, have instruction of reporting to the police.
The control procedure that pre-tensioned rail plate synchronous tension puts a control system mainly comprises: zero point alignment, track plates 6 add, put a front prestretching, track plates 6 is put.
1. a zero point alignment (add before pre-stretch-draw) of crossbeam:
In order to prevent prestressing force silk from deviating from when stretch-draw, pressing plate is manually put into stretch-drawing beam fixed position after installing and all completing by prestressing force silk; After installation prestressing force silk after initial tensioning 20%, stretch-draw computer must be operated by technical staff; After stretch-draw completes 20%, whether hand inspection has stripped thread, fracture or loosening phenomenon, if find necessary reporting techniques person, after handling it, can carry out lower to operation.Zero point alignment is controlled by computer, shows stretching force and the displacement of each jack above display screen.Jack ejects according to the displacement set in advance, locks with collar nut.
As requested crossbeam position is adjusted, with coordinating of controller, hydraulic cylinder is located by industrial computer accurately, reach accurate location.The zero point alignment of crossbeam carries out artificial setting when only needing first time to use, and directly access history data can carry out zero point alignment when reusing.
2. track plates adds:
After crossbeam zero point alignment, according to the setting parameter request of rail plate tension being carried out to setting to rail plate tension numerical value, only need to click at target value place and to carry out input digital.Stretch-draw 100%, is operated by professional and technical personnel, notes the change of compressor wire in stretching process, and whether hand inspection has stripped thread, fracture or loosening phenomenon, if find necessary reporting techniques person, after handling it, can carry out lower to operation.
3. add a process and be divided into two processes:
(1) synchronous shift stretch-draw: front 80 percent of the whole process of stretch-draw is displacement synchronous, and ensures that the displacement difference of two hydraulic cylinders is lower than two millimeters.
(2) with power stretch-draw: rear 20 percent of the whole process of stretch-draw is same power stretch-draw, should not exceed limit value with the numerical difference of two hydraulic cylinders in power stretching process.
Add Zhang Qianke according to field requirement carry out synchronous shift displacement step size settings, with the setting of power step-length and the setting of time.Can carry out after set-up procedure completes adding and open.Single-beam stretch-draw can be carried out during stretch-draw and also can carry out four beams with drawing.
4. put a front prestretching:
Because the duration in maintenance processes is longer, in order to better ensure the pulling force of steel wire, adopt physics locked.A prestretching before putting is exactly convenient unblock, for putting of next step provides better working environment.Putting a prestretching will keep pulling force steadily not occur concussion situation, can arrive appointment numerical value accurately, can unlock easily.When putting prestretching, hydraulic cylinder change in displacement is less.Because displacement is less when the characteristic of putting a prestretching puts prestretching, so relative skill requires higher, must guarantee to reach accurately and rapidly when putting prestretching and put a pre-pull-up values.Guarantee to put prestretching stability, an accuracy.
5. put a process:
Putting a process is the whole showdown stage re-packed in process, is also the highest stage of technical requirement.In this process, arbitrarily can adjust the step-length of putting and opening and put a time.Four of side hydraulic cylinders can be made to carry out Synchronous Radio when to put to open, also can ensure that eight hydraulic cylinders carry out Synchronous Radio and open simultaneously.Put in a process can reach steadily, arrive accurately put completely complete.
Above an embodiment of the invention has been described in detail, but described content being only the preferred embodiment of the invention, the practical range for limiting the invention can not being considered to.All equalization changes done according to the invention application range with improve, within the patent covering scope that still all should belong to the invention.

Claims (7)

1. pre-tensioned rail plate synchronous tension puts a control system, it is characterized in that: comprise pedestal (1), multiple mould (2), transverse stretching crossbeam (3), longitudinal stretch-drawing beam (4) and hydraulic operation device (5) being placed with track plates, described hydraulic operation device (5) is positioned on described pedestal (1) tunnel body of wall inwall outward, described transverse stretching crossbeam (3) is connected with corresponding hydraulic operation device (5) respectively with described longitudinal stretch-drawing beam (4)
Described pedestal (1) is provided with some described moulds (2) arranged in length and breadth, make the multiple equally distributed longitudinal mold row of the upper formation of described pedestal (1) and transverse mold row, the longitudinal prestressing reinforcing bar being positioned at the upper track plates (6) placed of described mould (2) on each longitudinal mold row is all interconnected by connector, the longitudinal prestressing reinforcing bar being positioned at the upper track plates (6) placed of described mould (2) of described longitudinal mold row head end is connected by connector and described pedestal (1) tunnel body of wall inwall outward, the longitudinal prestressing reinforcing bar being positioned at the upper track plates (6) placed of described mould (2) of described longitudinal mold row tail end is connected with described longitudinal stretch-drawing beam (4) by connector, the transverse prestressed reinforcing steel bar being positioned at the upper track plates (6) placed of described mould (2) on each transverse mold row is all interconnected by connector, the transverse prestressed reinforcing steel bar being positioned at the upper track plates (6) placed of described mould (2) of described transverse mold row head end is connected by connector and described pedestal (1) tunnel body of wall inwall outward, the transverse prestressed reinforcing steel bar being positioned at the upper track plates (6) placed of described mould (2) of described transverse mold row tail end is connected with described transverse stretching crossbeam (3) by connector.
2. pre-tensioned rail plate synchronous tension according to claim 1 puts a control system, it is characterized in that: also comprise control device, described control device comprises the industrial computer be connected successively, controller, Hydraulic Station, ball valve, oil filter and servo valve (7), also comprise displacement transducer (8) and pressure sensor (9), described servo valve (7), displacement transducer (8) and pressure sensor (9) are all positioned on described hydraulic operation device (5), institute's displacement sensors (8) is connected with described controller respectively with pressure sensor (9).
3. pre-tensioned rail plate synchronous tension according to claim 1 puts a control system, it is characterized in that: described longitudinal mold is classified as four row, every two row described longitudinal mold row connections described longitudinal stretch-drawing beam (4).
4. pre-tensioned rail plate synchronous tension according to claim 1 puts a control system, it is characterized in that: described transverse mold is classified as two row, often arranges the described transverse stretching crossbeam (3) of described transverse mold row connection one.
5. pre-tensioned rail plate synchronous tension according to claim 3 puts a control system, it is characterized in that: the two ends of each described longitudinal stretch-drawing beam (4) respectively connect a described hydraulic operation device (5).
6. pre-tensioned rail plate synchronous tension according to claim 4 puts a control system, it is characterized in that: the two ends of each described transverse stretching crossbeam (3) respectively connect a described hydraulic operation device (5).
7. pre-tensioned rail plate synchronous tension according to claim 2 puts a control system, it is characterized in that: be also provided with display and printer, and described display is connected with described controller respectively with described printer.
CN201420659218.3U 2014-11-05 2014-11-05 Pre-tensioned rail plate synchronous tension puts a control system Active CN204295871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420659218.3U CN204295871U (en) 2014-11-05 2014-11-05 Pre-tensioned rail plate synchronous tension puts a control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420659218.3U CN204295871U (en) 2014-11-05 2014-11-05 Pre-tensioned rail plate synchronous tension puts a control system

Publications (1)

Publication Number Publication Date
CN204295871U true CN204295871U (en) 2015-04-29

Family

ID=53101449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420659218.3U Active CN204295871U (en) 2014-11-05 2014-11-05 Pre-tensioned rail plate synchronous tension puts a control system

Country Status (1)

Country Link
CN (1) CN204295871U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105619600A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Synchronous tensioning and releasing control system for pre-tensioned track boards
CN105643792A (en) * 2016-02-04 2016-06-08 秦皇岛老虎重工有限公司 Two-direction pre-tensioned prestressing ballastless track slab movable tensioning equipment
CN106671268A (en) * 2016-06-16 2017-05-17 山西高行液压股份有限公司 Pre-tensioning track plate rebar stretch-draw and extending device
CN106808581A (en) * 2017-01-23 2017-06-09 山西高行液压股份有限公司 High-speed railway track plate pre-tensioning system flowing water unit production line puts an equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105619600A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Synchronous tensioning and releasing control system for pre-tensioned track boards
CN105643792A (en) * 2016-02-04 2016-06-08 秦皇岛老虎重工有限公司 Two-direction pre-tensioned prestressing ballastless track slab movable tensioning equipment
CN105643792B (en) * 2016-02-04 2017-12-05 秦皇岛老虎重工有限公司 Bidirectional pre-tensioned prestressing force fragment-free track slab movable type tensioning equipment
CN106671268A (en) * 2016-06-16 2017-05-17 山西高行液压股份有限公司 Pre-tensioning track plate rebar stretch-draw and extending device
CN106808581A (en) * 2017-01-23 2017-06-09 山西高行液压股份有限公司 High-speed railway track plate pre-tensioning system flowing water unit production line puts an equipment

Similar Documents

Publication Publication Date Title
CN105619600A (en) Synchronous tensioning and releasing control system for pre-tensioned track boards
CN204295871U (en) Pre-tensioned rail plate synchronous tension puts a control system
CN103526948A (en) Control method of intelligent tension system and intelligent tension system
CN106041064A (en) Intelligent control system for forming magnetic product and control method
CN102536935A (en) Hydraulic synchronous control device and method
CN106623511A (en) Hydraulic straightening equipment and system
CN102126252A (en) Automatic synchronous extension control equipment for precast beam
CN104898576A (en) Torsion synchronous intelligent numerical control bender numerical control system
CN104742079A (en) Automatic hydraulic valve rod assembly device of butterfly valve assembly machine and assembly method thereof
CN105840212A (en) Tunnel construction arch center formwork correcting method
CN104675782B (en) Prestressing force intelligent tensioning electro-hydraulic servo equipment and control method thereof
CN106227138B (en) Fan blade mould tilting device synchronous control system and method
CN104111670B (en) Prestressed tension control system and control method
CN205954388U (en) Defibrator mill clearance hydraulic pressure servo control system
CN106321117A (en) Multipoint intelligent cement paste grouting system
CN202833448U (en) Tilting gear overturn and reversing mechanism
CN104963514A (en) Control system with a plurality of prestress intelligent tensioning devices
CN106623501A (en) Hydraulic straightening method and system
CN203076561U (en) Intelligent control system for unlocking mold of cold chamber machine
CN103774850B (en) A kind of intelligent wireless force application system
CN205766796U (en) A kind of sleeper prestressing force machine drawing
CN204044640U (en) Strain-pull controlling of prestress system
CN202070732U (en) Extruding device
CN105946278A (en) Internal high pressure forming hydraulic machine based on cloud data processing
CN202519581U (en) Automatic prestress intelligent stretching device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200219

Address after: 062450 Xing Cun Xiang Guo Zhao Zhuang Cun, Hejian City, Cangzhou City, Hebei Province

Patentee after: Hejian Silver Dragon track Co., Ltd.

Address before: 300400 Tianjin City, Beichen economic and Technological Development Zone Industrial Park Road No. 62 dual Shuangjiang

Patentee before: Tianjin Silvery Dragon Prestressed Materials Co., Ltd.