CN202519581U - Automatic prestress intelligent stretching device - Google Patents

Automatic prestress intelligent stretching device Download PDF

Info

Publication number
CN202519581U
CN202519581U CN2011205094721U CN201120509472U CN202519581U CN 202519581 U CN202519581 U CN 202519581U CN 2011205094721 U CN2011205094721 U CN 2011205094721U CN 201120509472 U CN201120509472 U CN 201120509472U CN 202519581 U CN202519581 U CN 202519581U
Authority
CN
China
Prior art keywords
intelligent
draw
stretch
stretching
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205094721U
Other languages
Chinese (zh)
Inventor
郁明亮
张涛
金君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nicetek Hydraulic Machinery Shanghai Co ltd
Original Assignee
Nicetek Hydraulic Machinery Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nicetek Hydraulic Machinery Shanghai Co ltd filed Critical Nicetek Hydraulic Machinery Shanghai Co ltd
Priority to CN2011205094721U priority Critical patent/CN202519581U/en
Application granted granted Critical
Publication of CN202519581U publication Critical patent/CN202519581U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

An automatic prestress intelligent stretching device is characterized by comprising an intelligent stretching main pump station, an intelligent stretching auxiliary pump station and an intelligent stretching oil cylinder, which are mutually connected with one another through a cable; the intelligent stretching main pump station adopts an integrated design and integrates a stretching control console and a stretching pump station, and the automatic prestress intelligent stretching device also comprises a printer; the intelligent stretching main pump station and the intelligent stretching auxiliary pump station adopt a wheel-type structure and can be convenient and free to move and suitable for the on-site stretching; the intelligent stretching oil cylinder integrates a pressure sensor and a displacement sensor, can receive an instruction to carry out the stretching, can feed back the stretching data and integrates a dynamometric unit which is independent from the oil cylinder, so that the intelligent stretching oil cylinder becomes a loading tool rather than a measuring tool, and precise tension can be obtained. The automatic prestress intelligent stretching device has characteristics of high tension and stretching displacement measurement precision, precision in control, convenience in manipulation and management and the like, can realize the controllability of a stretching step of a prestress rib, and can realize the automatic and precise measurement of load and elongation of the prestress rib and the actualization of the stretching data.

Description

Prestressing force fully-automatic intelligent tensioning equipment
Technical field
The utility model relates to the stretch-draw application of the presstressed reinforcing steel of concrete components such as bridge construction, particularly a kind of prestressing force fully-automatic intelligent tensioning equipment.
Background technology
At present, at aspects such as bridge constructions, the prestressed stretch-draw of relevant concrete component is used very extensive, and this technology can not only effectively reduce concrete consumption, and can also cut down the consumption of energy and pollute.Yet this type of prestress tensioning equipment of each manufacturer production is all less than realizing through PLC control stretching force and displacement at present; Stretching force and displacement numerical value all need rely on artificial reading and manual record data, and its data accuracy lacks guarantee, in case the quality that error will influence prestressed girder occurs.
In sum, traditional tensioning equipment mainly is the method that adopts the Artificial Control oil pump, a series of problems below it exists:
1, it is bigger influenced by the stretch-draw peopleware.
2, the tensioning equipment precision is not high, and stretching force is out of control easily.
3, stretch-draw oil pump poor synchronization, the oil pressure deviation is bigger.
4, stretching extension amount error is bigger, has fakement phenomena.
5, hold the lotus deficiency of time, it is untimely to hold the ftercompction of lotus sections.
The utility model content
The purpose of the utility model is to propose the tension of prestressed tendon quality problems that a kind of intelligent numerical control tensioning equipment brings to solve manually-operated in the past.
The utility model solves the technical scheme that its technical problem adopted: propose a kind of prestressing force fully-automatic intelligent tensioning equipment, its characteristic comprises: intelligent stretch-draw main pumping station, intelligent stretch-draw is from pumping plant and intelligent stretch-draw oil cylinder, and interconnects through cable;
Said intelligent stretch-draw main pumping station has adopted the integral type design, and integrated stretch-draw console and stretch-draw pumping plant also comprise: printer;
Said stretch-draw console adopts 10 inches touch-screens, and the technical grade computer also disposes WINDOWS system and interface, but operation readiness;
Said intelligent stretch-draw main pumping station and said intelligent stretch-draw are 70MPa from the pumping plant operating pressure of pumping plant;
Said intelligent stretch-draw main pumping station and said intelligent stretch-draw are adopted wheeled construction from pumping plant, can be convenient free movable, be applicable to on-the-spot stretch-draw;
Said intelligent stretch-draw oil cylinder, operating pressure is 70MPa, and the stretching force scope is 28~900 tons, and tentioning stroke is 200mm;
Said intelligent stretch-draw oil cylinder, integrated pressure and displacement transducer can be accepted instruction and implement stretch-draw, and feedback stretch-draw data;
Said intelligent stretch-draw oil cylinder, the integrated dynamometry unit that is independent of oil cylinder make oil cylinder become a loading tool, but not survey tool can obtain stretching force accurately through the dynamometry unit.
The beneficial effect of the utility model is: adopt the utility model to possess following advantage:
1, based on stable industrial computer, high-precision loading and measureing equipment.
2, customizable design prestressed stretch-draw software, data base administration and security permission administrative skill.
3, accurate control can be realized, accurate measurement can be realized pre-stress rib stretching force and elongation to intelligent stretch-draw oil cylinder.
4, can realize controlledization of prestressed stretch-draw operation, can realize that presstressed reinforcing steel loads, elongation is measured automation, precision, data actualization.
Description of drawings
Fig. 1 is a prestressing force fully-automatic intelligent tensioning equipment structural representation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further specified.
A kind of prestressing force fully-automatic intelligent tensioning equipment, its characteristic comprises: intelligent stretch-draw main pumping station, intelligent stretch-draw is from pumping plant and intelligent stretch-draw oil cylinder, and interconnects through cable; Said intelligent stretch-draw main pumping station has adopted the integral type design, and integrated stretch-draw console and stretch-draw pumping plant also comprise: printer, said stretch-draw console adopt 10 inches touch-screens, and the technical grade computer also disposes WINDOWS system and interface, but operation readiness; Said intelligent stretch-draw main pumping station and said intelligent stretch-draw are 70MPa from the pumping plant operating pressure of pumping plant; Said intelligent stretch-draw main pumping station and said intelligent stretch-draw are adopted wheeled construction from pumping plant, can be convenient free movable, be applicable to on-the-spot stretch-draw; Said intelligent stretch-draw oil cylinder, operating pressure is 70MPa, and the stretching force scope is 28~900 tons, and tentioning stroke is 200mm; Said intelligent stretch-draw oil cylinder, integrated pressure and displacement transducer can be accepted instruction and implement stretch-draw, and feedback stretch-draw data; Said intelligent stretch-draw oil cylinder, the integrated dynamometry unit that is independent of oil cylinder makes oil cylinder become a loading tool, but not survey tool can obtain stretching force accurately through the dynamometry unit.
On-the-spot syndeton is as shown in Figure 1: beam 1, integrated form intelligence stretch-draw main pumping station 5 comprises: stretch-draw console 2, printer 3 and stretch-draw pumping plant 4, intelligent stretch-draw be from pumping plant 6, stretch-draw oil cylinder 7 and steel strand 8, more than each parts be connected through cable.

Claims (7)

1. prestressing force fully-automatic intelligent tensioning equipment, its characteristic comprises: intelligent stretch-draw main pumping station, intelligent stretch-draw is from pumping plant and intelligent stretch-draw oil cylinder, and interconnects through cable.
2. prestressing force fully-automatic intelligent tensioning equipment according to claim 1 is characterized in that, said intelligent stretch-draw main pumping station has adopted the integral type design, and integrated stretch-draw console and stretch-draw pumping plant also comprise: printer.
3. prestressing force fully-automatic intelligent tensioning equipment according to claim 2 is characterized in that, said stretch-draw console adopts 10 inches touch-screens, and the technical grade computer also disposes WINDOWS system and interface, but operation readiness.
4. prestressing force fully-automatic intelligent tensioning equipment according to claim 1 is characterized in that, said intelligent stretch-draw main pumping station and intelligent stretch-draw are 70MPa from the pumping plant operating pressure of pumping plant.
5. prestressing force fully-automatic intelligent tensioning equipment according to claim 1 is characterized in that, said intelligent stretch-draw main pumping station and intelligent stretch-draw are adopted wheeled construction from pumping plant, can be convenient free movable, be applicable to on-the-spot stretch-draw.
6. prestressing force fully-automatic intelligent tensioning equipment according to claim 1 is characterized in that, said intelligent stretch-draw oil cylinder, and operating pressure is 70MPa, and the stretching force scope is 28~900 tons, and tentioning stroke is 200mm.
7. prestressing force fully-automatic intelligent tensioning equipment according to claim 1 is characterized in that, said intelligent stretch-draw oil cylinder; The integrated dynamometry unit that is independent of oil cylinder; Make oil cylinder become a loading tool, but not survey tool can obtain stretching force accurately through the dynamometry unit.
CN2011205094721U 2011-12-08 2011-12-08 Automatic prestress intelligent stretching device Expired - Fee Related CN202519581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205094721U CN202519581U (en) 2011-12-08 2011-12-08 Automatic prestress intelligent stretching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205094721U CN202519581U (en) 2011-12-08 2011-12-08 Automatic prestress intelligent stretching device

Publications (1)

Publication Number Publication Date
CN202519581U true CN202519581U (en) 2012-11-07

Family

ID=47102536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205094721U Expired - Fee Related CN202519581U (en) 2011-12-08 2011-12-08 Automatic prestress intelligent stretching device

Country Status (1)

Country Link
CN (1) CN202519581U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147399A (en) * 2013-02-07 2013-06-12 柳州市邱姆预应力机械有限公司 Intelligent prestressing force stretching system
CN103161317A (en) * 2011-12-08 2013-06-19 上海耐斯特液压设备有限公司 Pre-stress full automatic intelligent tensioning device and operation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161317A (en) * 2011-12-08 2013-06-19 上海耐斯特液压设备有限公司 Pre-stress full automatic intelligent tensioning device and operation method thereof
CN103147399A (en) * 2013-02-07 2013-06-12 柳州市邱姆预应力机械有限公司 Intelligent prestressing force stretching system

Similar Documents

Publication Publication Date Title
CN103526948B (en) The control method of intelligent tensioning system and intelligent tensioning system
CN101279483A (en) Integral tension, relaxation system and technique for pre-tensioned prestressing tension technique
CN204101361U (en) A kind of PCslab girder large deflection failure test device
CN102922601A (en) Bridge prestress tensioning control and feedback method
CN103628422B (en) A kind of anti-force type dragging suspension basket prepressing device and implementation method thereof
CN109577200B (en) Support counter force control device and method for multi-leg support system
CN202519581U (en) Automatic prestress intelligent stretching device
CN103046767B (en) Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body
CN103161317A (en) Pre-stress full automatic intelligent tensioning device and operation method thereof
CN202467213U (en) Automatic control device of pre-stress tensioning device
CN113268094A (en) Bridge prestress tension construction monitoring cloud management device and method
CN108894114A (en) A kind of pylon based on ultrasonic displacement sensor adjusts cable system automatically
CN201819724U (en) Battery injection weighing system
CN201199213Y (en) Microcomputer-controlled still-loading anchoring tester
CN103091182A (en) Biaxial-creep-instrument-based acquisition and measurement system
CN212375727U (en) System for regulating and controlling positions of truss nodes of steel-concrete composite truss bridge
CN210500703U (en) Synchronous jacking system of prefabricated box girder template
CN204869215U (en) Prestressed concrete sleeper reinforcing bar tensioning equipment
CN205654123U (en) Building system of underpining
CN211846965U (en) Wireless portable screw rod jacking system
CN104881000A (en) High-precision full-automatic servo control system of roadway support test stand
CN210122826U (en) Jacking formula carbon cloth reinforced structure
CN209468793U (en) A kind of static test settlement observer for exempting from datum line beam
Shi et al. Research on application of intelligent prestressed construction technology based on computer software analysis
CN102706681A (en) Bailey sheet detecting device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20191208