CN204283448U CN201420732505.2U CN201420732505U CN204283448U CN 204283448 U CN204283448 U CN 204283448U CN 201420732505 U CN201420732505 U CN 201420732505U CN 204283448 U CN204283448 U CN 204283448U
Authority
CN
China
Prior art keywords
template
clinch
groove
concrete
elastomeric element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420732505.2U
Other languages
Chinese (zh)
Inventor
贺均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420732505.2U priority Critical patent/CN204283448U/en
Application granted granted Critical
Publication of CN204283448U publication Critical patent/CN204283448U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of concrete lining template and tunnel lining trolley, wherein said concrete lining template surface is the face of building, the end of described template have one for on the clinch that overlaps of a board concrete, towards the direction in the face of building, there is a groove at described clinch, elastomeric element is provided with in groove, described elastomeric element is fixedly connected on clinch, and described groove and elastomeric element form elasticity clinch.Described chassis uses above-mentioned template.The utility model, effectively can prevent and treat the concrete conquassation of tunnel double-lining lap-joint, spillage phenomenon, ensures concrete pouring quality.Efficiency of construction is high, easy to operate, saving is a large amount of artificial.

Description

Concrete lining template and tunnel lining trolley
Technical field
The utility model belongs to engineering equipment field, relates to concrete lining cutting equipment, particularly relates to concrete lining template, and use the tunnel lining trolley of above-mentioned template.
Background technology
In constructing tunnel engineering, secondary lining often uses tunnel lining trolley (being called for short chassis in present specification) to construct, as shown in Figure 1, 2, existing known concrete lining trolley all has template 1, template 1 is controlled (in order to simplify accompanying drawing by the jack on chassis, other parts of chassis are not drawn out) in figure, the top of template 1 is the face of building 2, has a clinch 3 in one end of template 1.During construction, the clinch 3 of template 1 and a upper board concrete 4 (namely concreting) need to carry out follow-up one end of building overlap a part of (i.e. concrete clinch 5), and the jack top pressuring template 1 on logical chassis, the soffit of clinch 3 upper surface and concrete clinch 5 is fitted, next board concrete is cast on the face of building 2 of template 1, and making two board concretes solidify connection is an entirety.
But, adopt the tunnel lining trolley of said structure, in work progress, Surface Quality of Concrete is difficult to control, and especially every plate lining concrete seam crossing has the bad phenomenon such as spillage, voids and pits, concrete cracking, finds that more than 80% exists above problem in examination.As shown in Figure 2, the reason of above-mentioned bad existing picture is caused to be, in work progress, because the template 1 of existing tunnel lining trolley is due to the impact of the factors such as and form of fracture smoother by the surface of concreting, the template 1 of chassis is in order to concreting (particularly concrete clinch 5) surface is closely connected, the template 1 of chassis pushes up the concrete surface of pressure concrete clinch 5, easily cause the concrete rupture of concrete clinch 5, template 1 overvoltage as shown in upper broken line in Fig. 2 is concreting (a upper board concrete 4), and cause the concrete rupture of concrete clinch 5, if top pressure (template 1 as shown in lower broken line in Fig. 2) not in place, can cause again forming gap between template and a upper board concrete 4, cause the construction concrete slurry in process that vibrates therefrom to spill.
In order to solve the problem, existing general processing mode is:
(1) before chassis is in place, a upper board concrete clinch of having built and trolley formwork clinch surface (i.e. faying surface) are thoroughly cleaned out, chassis and concrete surface are close to (but in fact due to the existence of the factors such as construction error, cannot accomplish to be close to completely) as far as possible.
(2) gap of template and concrete surface uses timber wedge (bar) to squeeze into compacted, play mortar leakage prevention (due to template 1 with on gap above a board concrete 4 use timber wedge (bar) to squeeze into jam-packed, but still may there is space in construction, still slurries are had therefrom to spill in process of vibrating of constructing, artificial leak stopping waste man-hour and material).
(3) check cross dimensions foozle before and after chassis, eliminate in time (due to the absolute being of error, effectively cannot eliminate its impact).
(4) accurately control center line, make chassis center line and tunnel center line same straight line (but be difficult in work progress ensure absolute conllinear, affect construction quality).
But above-mentioned means still cannot effectively solve the problem, therefore need to provide a kind of effective equipment or method to overcome above-mentioned defect, to improve efficiency of construction and construction quality.
Utility model content
For above-mentioned deficiency, technical problem to be solved in the utility model is to provide one Control architecture and a upper board concrete to overlap well, and guarantees the concrete lining template of construction quality, and uses the tunnel lining trolley of this template.
Wherein, concrete lining template surface is the face of building, the end of described template have one for on the clinch that overlaps of a board concrete, towards the direction in the face of building, there is a groove at described clinch, elastomeric element is provided with in groove, described elastomeric element is fixedly connected on clinch, and described groove and elastomeric element form elasticity clinch.
Preferably, described groove runs through whole clinch.
Preferably, described groove side flushes with template edge, makes described template form step at described groove.
Preferably, at least one limit of described elastomeric element exceed described in build face.
Preferably, described elastomeric element is positioned at the edge of clinch far-end higher than the edge being positioned at clinch near-end.
Preferably, the cross section of described elastomeric element is one trapezoidal, bottom side length be positioned at clinch far-end, short limit, base is positioned at clinch near-end, described bond length and depth of groove equal and opposite in direction.
Preferably, described elastomeric element is made up of one deck polyfluortetraethylene plate compound bonding on polyurethane elastomeric material, and described polyfluortetraethylene plate is positioned at upper surface; The anchoring of described elastomeric element rivet in a groove, fills whole groove.
Preferably, described groove surface builds the low 2cm in face than template, and recess width is 10cm, polytetrafluoroethylene (PTFE) thickness of slab 3mm bonding on polyurethane elastomeric material.
And a kind of tunnel lining trolley, comprise a template, described template is above-mentioned concrete lining template.
Preferably, described template is arc, and described elasticity clinch is arranged along the arc-shaped side edge of described template.
Adopt the utility model, effectively can prevent and treat the concrete conquassation of tunnel double-lining lap-joint, spillage phenomenon, ensure concrete pouring quality.Efficiency of construction is high, easy to operate, saving is a large amount of artificial.
Accompanying drawing explanation
In order to more clearly describe the related art scheme involved by the utility model, the accompanying drawing related to below gives simple declaration, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The Construction Principle figure of Fig. 1 existing tunnel lining trolley;
The schematic diagram affecting concrete pouring quality of Fig. 2 existing tunnel lining trolley template;
The operating diagram of Fig. 3 the utility model tunnel lining trolley;
The cross-sectional structure schematic diagram of Fig. 4 the utility model tunnel lining trolley template;
The end face structure schematic diagram of Fig. 5 the utility model tunnel lining trolley template;
Fig. 6 the utility model tunnel lining trolley template ideal construction schematic diagram;
Construction schematic diagram when Fig. 7 the utility model tunnel lining trolley template lap length is not enough;
Construction schematic diagram when Fig. 8 the utility model tunnel lining trolley template top pressure is not in place;
The construction schematic diagram of Fig. 9 the utility model tunnel lining trolley template top degree of pressing through.
Description of reference numerals:
1. template, 2. builds face, 3. clinch, 31. grooves, 32. elastomeric elements, 321. elastomeric materials, and 322 panels 4. go up a board concrete, 5. bond end, 6. next board concrete.Its further groove 31 forms elasticity clinch jointly with elastomeric element 32.
Detailed description of the invention
For the ease of those skilled in the art to further understanding of the present utility model, and the technical scheme be clearly familiar with described in the application, complete, correlation technique content of the present utility model is disclosed fully, below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in detail, apparently, described detailed description of the invention only gives a part of embodiment of the present utility model to enumerate mode, understands the utility model and core concept thereof for helping.
Basic technology scheme of the present utility model is as follows:
The utility model provides concrete lining template, and above-mentioned concrete lining template is used for known tunnel lining trolley to replace the novel tunnel lining trolley of its template.Specifically, shown in composition graphs 3-9:
Wherein, described concrete lining template surface is the face of building 2, the end of template 1 have one for on the clinch 3 that overlaps of a board concrete, described clinch 3 is elasticity clinch.Particularly, described clinch 3 has one to run through whole clinch 3 groove 31 towards the direction in the face of building 2, in groove 31, be provided with elastomeric element 32, described elastomeric element 32 is fixedly connected in groove 31, and with the face of building 2 in the same way.Overcome existing template 1 entirety by technique scheme and adopt the stronger material of rigidity (being generally the steel form that steel make); and the face of building 2 of the surface (faying surface) that clinch 3 and upper board concrete 4 bond end 5 overlaps and template 1 is coplanar, causes and easily to cause the concrete conquassation of upper board concrete 4 bond end 5 during construction or occur that gap etc. affects construction quality.Be further advanced by described in being exceeded at least one limit of described elastomeric element and build face, the edge that especially described elastomeric element is positioned at clinch far-end better improves above-mentioned deficiency higher than the edge being positioned at clinch near-end, lifting construction quality better.
The tunnel lining trolley that the utility model provides, comprises a template 1, and described template 1 structure adopts the structure of above-mentioned concrete lining template.In order to the described template 1 of the needs meeting constructing tunnel adopts arc-shaped curved surface structure (with the mating shapes of tunnel wall), build the upper surface that face 2 is template 1, also be its convex surface, described clinch 3 is positioned at one end of template 1, and the groove 31 on it and upper surface are in the same way.One end that described groove 31 and flexible clinch 32 are positioned at template 1 is arranged in described template 1 along described arc is elongated, realizes the through whole clinch of groove 31.
Provide the certain embodiments of the utility model specific implementation and application below by way of example:
Improvement of the present utility model is the template 1 of tunnel lining trolley, especially the clinch 3 of template 1, and the shape of template 1 still adopts known arc, and other structures of tunnel lining trolley all adopt prior art.
As in Figure 3-5, the template 1 of tunnel lining trolley arranges the through described clinch 3 of an elongated groove 31 for carrying out with concreting (a upper board concrete 4) bond end 5 the clinch 3 that overlaps along clinch 3 arc of template 1 end, groove 31 side is positioned at the distal edge edge of template 1, also be the few wall of groove 31, the cross section along chassis center line of whole template 1 is made to be step-like, the groove face of groove 31 is than trolley formwork plane (building face 2) low 2cm (i.e. the degree of depth of groove 31), recess width 10cm, on groove 31, (i.e. groove face) lays elastomeric material 321, elastomeric material 321 is provided with panel 322, described to plate 322 smooth surface, described elastomeric material 321, panel 322 forms elastomeric element 32.Described elastomeric element 322 comprises one deck by polyurethane elastomeric material particularly, and on polyurethane elastomeric material, bonding thick layer 3mm polyfluortetraethylene plate is as panel, thus forms composite material formation elastomeric element 32; The thickness of described elastomeric element 32 is more than or equal to the degree of depth of groove 31; Preferably described elastomeric element is trapezoidal (as shown in Figure 4) along the cross section in chassis center line direction, wherein being arranged in clinch 3 near-end (right side of Fig. 4) base is 2cm (identical with groove 31 degree of depth), be arranged in clinch 3 far-end (left end of Fig. 4) for 3cm (exceeding the face of building 2), its width is identical with groove 31 width, be anchored in groove 31 with rivet, fill whole groove 31.
Wherein, it is good that polyurethane has chemical resistance, non-corrosive; There is good self-extinguishment and anti-flammability; The features such as resistance to ag(e)ing is good, and the life-span is long.Described polyurethane elastomeric material can select polyurethane flexible foams or polyurethane hard foam as required.Polyfluortetraethylene plate (is also tetrafluoro plate, Teflon plate, Teflon plate) there is very superior combination property: high-low temperature resistant (-192 DEG C ~ 260 DEG C), corrosion-resistant (strong acid, highly basic, chloroazotic acid etc.), weather, high insulation, highly to lubricate, do not adhere to, the good characteristic such as nonhazardous.Therefore, when concrete construction, its smooth surface, is convenient to process, improves construction quality.
During use, after tunnel lining trolley is in place, make tunnel lining trolley center line and tunnel center line in same plane, then pass through adjustment side hydraulic oil cylinder, side direction leading screw is very heavy and upper very heavy, make it reach lining cutting working size, then screw very heavy very heavy with side direction.Because the elasticity clinch of tunnel lining trolley template 1 and bond end 5 soffit of a upper board concrete 4 overlap, owing to employing the elasticity clinch 32 that elastomeric material is formed, after tunnel lining trolley reaches working size, automatically ensure with a upper board concrete 4 closely connected by flexibility overlap joint, and board concrete 4 bond end 5 can not be damaged, also can not cause congratulations, save the time of artificial filling chink.
As shown in Figure 6, when template 1 and the lap length of a upper board concrete 4 just equal the width of clinch 3, and when overlap joint laminating is accurate, due to the existence of elastomeric element 32, make gapless between template 1 and a upper board concrete 4, after having built next board concrete 6, two board concretes have combined closely, and construction quality obtains effective guarantee.
As shown in Figure 7, when template 1 and the lap length just little width equaling clinch 3 of a upper board concrete 4, but when overlap joint laminating is accurate, due to the existence of elastomeric element 32, to make between template 1 and a upper board concrete 4 still gapless, after having built next board concrete 6, two board concretes have combined closely, and construction quality obtains effective guarantee.
As shown in Figure 8, when template 1 and a upper board concrete 4 can not overlap fit accurate time, namely because the impact of upper board concrete 4 construction error or the alignment error of chassis center line tunnel center line, cause the face of building 2 of template 1 can not coplanar with the soffit of a upper board concrete 4 (lower than its soffit), elongated surfaces now in the face of building 2 and on a board concrete 4 soffit between there is gap, but due to the existence of elastomeric element 32, make the gap between template 1 and a upper board concrete 4 make up by elastomeric element 32, to make between template 1 end and a upper board concrete 4 still gapless, after having built next board concrete 6, two board concretes combine closely, there will not be the existing pictures such as spillage, construction quality obtains effective guarantee.
As shown in Figure 9, when template 1 and a upper board concrete 4 can not overlap fit accurate time, namely because the impact of upper board concrete 4 construction error or the alignment error of chassis center line tunnel center line, cause the face of building 2 of template 1 can not coplanar with the soffit of a upper board concrete 4 (higher than its soffit), elongated surfaces now in the face of building 2 higher than on the soffit of a board concrete 4, namely the clinch 3 of template 1 crosses the bond end 5 pressing a board concrete 4, but due to the existence of elastomeric element 32, both can not conquassation bond end 5 concrete, also can not template 1 end and on form gapless between a board concrete 4, after having built next board concrete 6, two board concretes combine closely, there will not be the existing pictures such as spillage, construction quality obtains effective guarantee.
Due to polyfluortetraethylene plate and concrete surface closely connected, can smooth movement be ensured, eliminate the overlap joint undue influence construction quality of trolley formwork 1 and a upper board concrete in conjunction with flexible overlap joint.Because polyfluortetraethylene plate is from height lubriation material characteristic, lap-joint, without the need to brushing release agent, can not cause drawing crack phenomenon to coagulation.
Therefore, effectively can prevent and treat the concrete conquassation of tunnel double-lining lap-joint, spillage phenomenon, ensure concrete pouring quality.Efficiency of construction is high, easy to operate, saving is a large amount of artificial.
When embody rule, the template 1 on tunnel lining trolley is often spliced by multiple part, so that construction; For convenience of description, when the description of above-described embodiment, the template 1 on tunnel lining trolley is described depending on as a whole, but foregoing description does not affect essence of the present utility model.
In above-described embodiment, tunnel lining trolley of the present utility model and work progress thereof are described in detail, wherein the template 1 of tunnel lining trolley is except may be used for tunnel lining trolley, also can be used as common or special concrete lining template independently to use, or use with other coordinative composition of equipments, or use as the building block of other equipment, certainly, in different applied environments, may change to some extent the shape etc. of template, especially for the setting position of clinch in template 3, quantity, whether run through the needs such as the whole edge of template to change according to having application, but for the utility model make the improvement of the clinch 3 of improvement essence communicate, in view of having carried out sufficient elaboration to the innovative point of this template above, no longer superfluously to state at this.
Above embodiment of the present utility model is described in detail, apply specific case herein to have carried out lock to principle of the present utility model and embodiment and state, the explanation of above embodiment just understands method of the present utility model and core concept thereof for helping; Meanwhile, for one of ordinary skill in the art, according to thought of the present utility model, all will change in specific embodiments and applications, in sum, this description should not be construed as restriction of the present utility model.

Claims (10)

1. concrete lining template, described template surface is the face of building, the end of described template have one for on the clinch that overlaps of a board concrete, it is characterized in that, towards the direction in the face of building, there is a groove at described clinch, in groove, be provided with elastomeric element, described elastomeric element is fixedly connected on clinch, and described groove and elastomeric element form elasticity clinch.
2. template as claimed in claim 1, it is characterized in that, described groove runs through whole clinch.
3. template as claimed in claim 1, it is characterized in that, described groove side flushes with template edge, makes described template form step at described groove.
4. template as claimed in claim 1, is characterized in that, build face described at least one limit of described elastomeric element exceeds.
5. template as claimed in claim 4, it is characterized in that, described elastomeric element is positioned at the edge of clinch far-end higher than the edge being positioned at clinch near-end.
6. template as claimed in claim 4, is characterized in that, the cross section of described elastomeric element is one trapezoidal, bottom side length be positioned at clinch far-end, short limit, base is positioned at clinch near-end, described bond length and depth of groove equal and opposite in direction.
7. template as claimed in claim 1, it is characterized in that, described elastomeric element is made up of one deck polyfluortetraethylene plate compound bonding on polyurethane elastomeric material, and described polyfluortetraethylene plate is positioned at upper surface; The anchoring of described elastomeric element rivet in a groove, fills whole groove.
8. template as claimed in claim 7, is characterized in that, described groove surface builds the low 2cm in face than template, and recess width is 10cm, polytetrafluoroethylene (PTFE) thickness of slab 3mm bonding on polyurethane elastomeric material.
9. a tunnel lining trolley, comprises a template, it is characterized in that, described template is the concrete lining template described in any one of claim 1-8.
10. chassis as claimed in claim 9, it is characterized in that, described template is arc, and described elasticity clinch is arranged along the arc-shaped side edge of described template.
CN201420732505.2U 2014-12-01 2014-12-01 concrete lining template and tunnel lining trolley Expired - Fee Related CN204283448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420732505.2U CN204283448U (en) 2014-12-01 2014-12-01 concrete lining template and tunnel lining trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420732505.2U CN204283448U (en) 2014-12-01 2014-12-01 concrete lining template and tunnel lining trolley

Publications (1)

Publication Number Publication Date
CN204283448U true CN204283448U (en) 2015-04-22

Family

ID=52866621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420732505.2U Expired - Fee Related CN204283448U (en) 2014-12-01 2014-12-01 concrete lining template and tunnel lining trolley

Country Status (1)

Country Link
CN (1) CN204283448U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506024A (en) * 2018-04-17 2018-09-07 蓝传雯 A kind of construction method and supporting mold of Tunnel
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN109667602A (en) * 2018-11-28 2019-04-23 中铁隧道局集团有限公司 For preventing the construction method of concrete capping at two lining circular construction joints

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506024A (en) * 2018-04-17 2018-09-07 蓝传雯 A kind of construction method and supporting mold of Tunnel
CN108952767A (en) * 2018-08-01 2018-12-07 中铁十七局集团有限公司 A kind of flexible overlap joint template component and its flexibility lapping construction method of lining trolley
CN109667602A (en) * 2018-11-28 2019-04-23 中铁隧道局集团有限公司 For preventing the construction method of concrete capping at two lining circular construction joints

Similar Documents

Publication Publication Date Title
CN102392420B (en) Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate
CN204283448U (en) concrete lining template and tunnel lining trolley
CN103669292A (en) Concrete joint water stop structure and construction method thereof
CN112252462A (en) Construction method of concrete roof layer waterproof structure
CN112942600A (en) Construction device and construction method for improving construction quality of post-cast joint concrete of prefabricated laminated slab
CN109356201A (en) A kind of the interface waterproof construction and interface method for waterproofing of new-old concrete
CN110080308A (en) A kind of novel late poured band structure and its construction method
CN105201079A (en) Floorslab and wallboard welding technique
CN207609008U (en) A kind of assembling type outer wall plate and drum steel beam connecting joint
CN209162909U (en) A kind of interface waterproof construction of new-old concrete
CN109235668A (en) Residential building curtain wall and wall crack plugging structure
CN205954968U (en) A strenghthened type concrete combined slab for green building
CN207998873U (en) Basement bottom plate rear pouring tape structure
CN207504539U (en) A kind of cable trough with cable protection external member
CN104863273A (en) Method and structure of using cement-based grouting materials to seal wall splicing seam
CN115162733A (en) Construction method for preventing slurry leakage of joints of non-dismantling formwork and beam side wood formwork for floor slab
CN101666143A (en) Construction method of polyurethane thermal insulation system by taking large-size face brick as finishing coat
CN108086552A (en) A kind of band groove arch reinforced concrete prefabricated board
CN103924694B (en) A kind of mending-leakage processing method of water proofing property concrete extension joint
CN210946495U (en) Combined bridge deck structure of steel-UHPC prefabricated slab
CN109281292A (en) A kind of reservoir concrete deep-water panel disengagement crack repairing method
CN208167997U (en) Waterproof construction at a kind of toilet threshold
CN102587685A (en) Lap joint structure for new concrete plate and old concrete plate
CN207512903U (en) A kind of connection structure of precast concrete balcony periphery sealing plate levels
CN207047912U (en) A kind of rubber watertight strip installation sizing fixture

Legal Events

Date Code Title Description
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: He Jun

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee