CN204282138U - Three gauge cover lines become rail device - Google Patents

Three gauge cover lines become rail device Download PDF

Info

Publication number
CN204282138U
CN204282138U CN201420736389.1U CN201420736389U CN204282138U CN 204282138 U CN204282138 U CN 204282138U CN 201420736389 U CN201420736389 U CN 201420736389U CN 204282138 U CN204282138 U CN 204282138U
Authority
CN
China
Prior art keywords
rail
tongue
narrow
gauge
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420736389.1U
Other languages
Chinese (zh)
Inventor
龙运生
刘语冰
卢泽坤
徐鸾玉
夏智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ZHONGCHUANG RAILWAY ENGINEERING EQUIPMENT Co Ltd
Original Assignee
HUNAN ZHONGCHUANG RAILWAY ENGINEERING EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ZHONGCHUANG RAILWAY ENGINEERING EQUIPMENT Co Ltd filed Critical HUNAN ZHONGCHUANG RAILWAY ENGINEERING EQUIPMENT Co Ltd
Priority to CN201420736389.1U priority Critical patent/CN204282138U/en
Application granted granted Critical
Publication of CN204282138U publication Critical patent/CN204282138U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model discloses a kind of three gauge cover lines and become rail device, comprise two mark rail stock rails, 1065 narrow gauges, 1000 narrow gauge, A tongue, B tongue, C tongue, D tongue, two connecting rails and two guard rails; Described two mark rail stock rail through change rail devices; Described 1065 narrow gauges, 1000 narrow gauges, A tongue and B tongue are placed in inside two, the front portion mark rail stock rail of change rail device; Described C tongue, D tongue, two connecting rails and two guard rails are placed in inside two, the rear portion mark rail stock rail of change rail device; Described 1065 narrow gauges and 1000 narrow gauges comprise straightway and broken line; Described C tongue and D heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts connect with 1065 narrow gauges, 1000 narrow gauge ends respectively; Described two connecting rails comprise straightway and broken line.

Description

Three gauge cover lines become rail device
Technical field
The utility model relates to a kind of railroad track linkage, particularly relates to a kind ofly to become rail devices by three gauges cover lines of 1435,1067,1,000 three kinds of different gauge locomotive simultaneously.
Background technology
At present, China railways is almost single standard gauge 1435 circuit, only Kunming, Yunnan in more border port river mouth retains total length 468 kilometers of gauges is the narrow gauge of 1000.Country in Southeast Asia, comprises Vietnam, Cambodia, Thailand, Burma and Malaysia based on 1000 rail railways, and Japan, Australia and African most countries all adopt 1067 gauges.Along with the develop rapidly of world commerce, adopt three gauges to overlap line simultaneously and run the cover line circuit run to adapt to multiple locomotive and become requirement to railway.
But, when three gauge cover lines run, because gauge is different, share rail different, two kinds of narrow gauge track center lines and standard gauge track centerline are unsymmetrical arrangement, therefore, when two kinds of arrow gauge locomotives need enter factory or the debugging of maintenance workshop, field or keep in repair, rail device must be become by a kind of, two kinds of narrow gauge gauge locomotive all be become and overlaps with workshop debug lines track centerline.If do not have such change rail device, then inconvenience maintenance, really can not realize three gauge circuit cover lines and run simultaneously.
Applicant is studying for a long period of time and is finding in testing, and makes three gauges cover lines and becomes rail devices and need to solve a series of technical barrier, as: different gauge locomotive needs forward, reverse both direction enters and becomes rail device; How narrow gage locomotive ensures traffic safety etc. after entering and becoming rail device.
Utility model content
The technical problems to be solved in the utility model is to provide and a kind ofly can becomes rail devices by three gauges cover lines of 1435,1067,1,000 three kinds of different gauge locomotive simultaneously.
In order to solve the problems of the technologies described above, three gauge cover lines of the present utility model become rail device and comprise two mark rail stock rails, 1065 narrow gauges, 1000 narrow gauge, A tongue, B tongue, C tongue, D tongue, two connecting rails and two guard rails; The front portion becoming rail device is used for junctor garage cabling, rear portion for connecting locomotive maintenance field; Described two mark rail stock rail through change rail devices; Described 1065 narrow gauges, 1000 narrow gauges, A tongue and B tongue are placed in inside two, the front portion mark rail stock rail of change rail device; Described C tongue, D tongue, two connecting rails and two guard rails are placed in inside two, the rear portion mark rail stock rail of change rail device; Described 1065 narrow gauges and 1000 narrow gauges comprise straightway and broken line, straightway is positioned at the anterior entrance that becomes rail device and parallelly with mark rail stock rail walk rail for connecting narrow gage locomotive, and broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate; Described C tongue and D heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts connect with 1065 narrow gauges, 1000 narrow gauge ends respectively; Described two connecting rails comprise straightway and broken line, straightway is positioned at the rear entry that becomes rail device and parallelly with mark rail stock rail walks rail for connecting narrow gage locomotive, broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate, and its end fixed connection point lays respectively at the outside of C tongue and D heel of switch rail tie point; Described two connecting rail broken lines are equal with the angle of mark rail stock rail with the narrow gauge broken line of opposite side respectively with the angle of mark rail stock rail; Described A tongue and B heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts with two connecting rail ends respectively and connects; Described two guard rails to be placed in inside two connecting rail straightways and parallel with connecting rail straightway; The length of described A tongue and B tongue is that its tip is respectively to straightway and the broken line turning point of homonymy narrow gauge; The length of described C tongue and D tongue is that its tip is respectively to straightway and the broken line turning point of homonymy connecting rail.
Described two guard rails are fixedly connected on the straightway of connecting rail by guard rail fagging.
Described guard rail fagging is bolted to and is connected to the connecting rail web of the rail.
Also comprise front point switch and rear point switch for controlling the folding of tongue respectively, front point switch connects A tongue and B tongue, and rear point switch connects C tongue and D tongue.
Described front point switch is provided with three gears, and three corresponding three kinds of gauge locomotive turnover of gear positions difference become the switch position of rail devices.
Also comprise linkage controller, described front point switch is connected linkage controller to realize coordinated signals with rear point switch.
Rail brace is equipped with outside described mark rail stock rail and connecting rail.
Described heel of switch rail is movably connected on respectively by the mode that both sides respectively establish two interval iron to be connected with four studs the rut become in the middle part of rail device and follows on switch base plate.
Adopt structure of the present utility model, owing to being provided with 1065 narrow gauges, 1000 narrow gauge, A tongue, B tongue, C tongue, D tongue, two connecting rails and two guard rails, narrow gauge comprises straightway and broken line, connecting rail also comprises straightway and broken line, A tongue, B tongue coordinate with narrow gauge, C tongue, D tongue coordinate with connecting rail, thus achieve change rail, make three not co-orbital center lines be transformed into a center line.1065 narrow gauges and 1000 narrow gage locomotives enter from front portion and become rail device, and guided by tongue and realize becoming rail, when going out to become rail device, tongue is close in side, and opposite side pastes connecting rail, are then rolled away from by connecting rail and become rail device.Like this, the locomotive of three kinds of different gauges is facilitated on the track of same center line, to enter factory floor debugging and safeguard.Adopt change rail device of the present utility model, really can realize three gauge circuits and run simultaneously, fully can excavate the potential of field, existing station, circuit, improve field, circuit station service efficiency to greatest extent, save a large amount of construction funds and field, station land used.
Accompanying drawing explanation
Fig. 1 is that change rail device of the present utility model uses schematic diagram;
Fig. 2 is that the utility model becomes rail device structural representation;
Fig. 3 is that the utility model becomes rail device by point rail position schematic diagram during mark gage locomotive;
Fig. 4 is that the utility model becomes rail device by point rail position schematic diagram during 1065 locomotive;
Fig. 5 is that the utility model becomes rail device by point rail position schematic diagram during 1000 locomotive.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail:
As shown in Figure 1 and Figure 2, three gauge cover lines change rail devices of the present utility model comprise two 1435 mark rail stock rail 1,1065 narrow gauge, 2,1000 narrow gauge 3, A tongue 4, B tongue 5, C tongue 6, D tongue 7, two connecting rails 8 and two guard rails 9.The front portion becoming rail device is used for junctor garage cabling, rear portion for connecting locomotive maintenance field.Two mark rail stock rail through change rail devices.1065 narrow gauges, 1000 narrow gauges, A tongue and B tongue are placed in inside two, the front portion mark rail stock rail of change rail device.C tongue, D tongue, two connecting rails and two guard rails are placed in inside two, the rear portion mark rail stock rail of change rail device.1065 narrow gauges and 1000 narrow gauges comprise straightway and broken line, straightway is positioned at the anterior entrance that becomes rail device and parallelly with mark rail stock rail walk rail for connecting narrow gage locomotive, and broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate.C tongue and D heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts connect with 1065 narrow gauges, 1000 narrow gauge ends respectively.Two connecting rails comprise straightway and broken line, straightway is positioned at the rear entry that becomes rail device and parallelly with mark rail stock rail walks rail for connecting narrow gage locomotive, broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate, and its end fixed connection point lays respectively at the outside of C tongue and D heel of switch rail tie point.Two connecting rail broken lines are equal with the angle of mark rail stock rail with the narrow gauge broken line of opposite side respectively with the angle of mark rail stock rail.A tongue and B heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts with two connecting rail ends respectively and connects.1065 and 1000 narrow gage locomotives share connecting rail straightway after becoming rail.Two guard rails to be placed in inside two connecting rail straightways and parallel with connecting rail straightway, and guard rail coordinates the traffic safety ensureing that 1000 gauge locomotive are walked when two connecting rail straightways with connecting rail.The length of A tongue and B tongue is that its tip is respectively to straightway and the broken line turning point of homonymy narrow gauge.The length of C tongue and D tongue is that its tip is respectively to straightway and the broken line turning point of homonymy connecting rail.Rut is prior art with switch base plate.
As further improvement, two guard rails are fixedly connected on the straightway of connecting rail by guard rail fagging.Guard rail fagging is bolted to and is connected to the connecting rail web of the rail.Like this, the side impacting force of wheel to guard rail is born by rail the upper jaw and the lower jaw, avoid bolt and bear shearing force, force wheel to be walked between stock rail and guard rail, guard rail coordinates the traffic safety ensureing that 1000 gauge locomotive are walked when two connecting rail straightways with connecting rail.
Rail brace is equipped with outside mark rail stock rail and connecting rail.Like this, both can prevent stock rail from turning up, accurately can control gauge again.
As further improvement, heel of switch rail is movably connected on respectively by the mode that both sides respectively establish two interval iron to be connected with four studs the rut become in the middle part of rail device and follows on switch base plate.Like this, the connection of tongue is more firm, and rotate more flexible, efficiency is higher.Certainly, the conventional connected mode of other prior aries can also be adopted.
Convenient in order to become rail, front point switch and rear point switch can be set for controlling the folding of tongue respectively.Front point switch connects A tongue and B tongue.Rear point switch connects C tongue and D tongue.Front point switch can be provided with three gears, and three corresponding three kinds of gauge locomotive turnover of gear positions difference become the switch position of rail devices.
In order to realize point switch interlock cooperation, also comprise linkage controller, front point switch is connected linkage controller to realize coordinated signals with rear point switch.The structure of point switch and linkage controller is prior art.
When different gauge locomotive is by becoming rail device, the folding being controlled four tip of a root rails by front point switch and rear point switch realizes becoming rail.
As shown in Figure 3, during by 1435 standard gauge locomotive, front point switch is intervening gears, and A tongue 4 and B tongue 5 are all opened, and rear point switch not plate moves, and C tongue 6 and D tongue 7 can be at an arbitrary position.
As shown in Figure 4, during by 1065 gauge locomotive, front point switch is right side gear, and rear point switch is left side gear, and A tongue 4 and D tongue 7 are opened, and B tongue 5 and C tongue 6 close.
As shown in Figure 5, during by 1000 gauge locomotive, front point switch is left side gear, and rear point switch is right side gear, and A tongue 4 and D tongue 7 close, and B tongue 5 and C tongue 6 are opened.

Claims (8)

1. three gauge cover lines become a rail device, it is characterized in that: comprise two mark rail stock rails (1), 1065 narrow gauge (2), 1000 narrow gauge (3), A tongue (4), B tongue (5), C tongue (6), D tongue (7), two connecting rails (8) and two guard rails (9); The front portion becoming rail device is used for junctor garage cabling, rear portion for connecting locomotive maintenance field; Described two mark rail stock rail through change rail devices; Described 1065 narrow gauges, 1000 narrow gauges, A tongue and B tongue are placed in inside two, the front portion mark rail stock rail of change rail device; Described C tongue, D tongue, two connecting rails and two guard rails are placed in inside two, the rear portion mark rail stock rail of change rail device; Described 1065 narrow gauges and 1000 narrow gauges comprise straightway and broken line, straightway is positioned at the anterior entrance that becomes rail device and parallelly with mark rail stock rail walk rail for connecting narrow gage locomotive, and broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate; Described C tongue and D heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts connect with 1065 narrow gauges, 1000 narrow gauge ends respectively; Described two connecting rails comprise straightway and broken line, straightway is positioned at the rear entry that becomes rail device and parallelly with mark rail stock rail walks rail for connecting narrow gage locomotive, broken line stretches laterally and becomes angle with mark rail stock rail and its end is fixed on the rut become in the middle part of rail device follows on switch base plate, and its end fixed connection point lays respectively at the outside of C tongue and D heel of switch rail tie point; Described two connecting rail broken lines are equal with the angle of mark rail stock rail with the narrow gauge broken line of opposite side respectively with the angle of mark rail stock rail; Described A tongue and B heel of switch rail are movably connected on the rut become in the middle part of rail device and follow on switch base plate, and its heel end contacts with two connecting rail ends respectively and connects; Described two guard rails to be placed in inside two connecting rail straightways and parallel with connecting rail straightway; The length of described A tongue and B tongue is that its tip is respectively to straightway and the broken line turning point of homonymy narrow gauge; The length of described C tongue and D tongue is that its tip is respectively to straightway and the broken line turning point of homonymy connecting rail.
2. three gauge cover lines become rail device according to claim 1, it is characterized in that: described two guard rails are fixedly connected on the straightway of connecting rail by guard rail fagging.
3. three gauge cover lines become rail device according to claim 2, it is characterized in that: described guard rail fagging is bolted to and is connected to the connecting rail web of the rail.
4. three gauges cover lines become rail devices according to claim 1, it is characterized in that: also comprise front point switch and rear point switch for controlling the folding of tongue respectively, front point switch connects A tongue and B tongue, and rear point switch connects C tongue and D tongue.
5. three gauge cover lines according to claim 4 become rail device, it is characterized in that: described front point switch is provided with three gears, and three corresponding three kinds of gauge locomotive turnover of gear positions difference become the switch position of rail device.
6. three gauge cover lines become rail device according to claim 4, and it is characterized in that: also comprise linkage controller, described front point switch is connected linkage controller to realize coordinated signals with rear point switch.
7. three gauge cover lines become rail device according to claim 1, it is characterized in that: be equipped with rail brace outside described mark rail stock rail and connecting rail.
8. three gauge cover lines become rail device according to claim 1, it is characterized in that: described heel of switch rail is movably connected on respectively by the mode that both sides respectively establish two interval iron to be connected with four studs the rut become in the middle part of rail device and follows on switch base plate.
CN201420736389.1U 2014-12-01 2014-12-01 Three gauge cover lines become rail device Withdrawn - After Issue CN204282138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420736389.1U CN204282138U (en) 2014-12-01 2014-12-01 Three gauge cover lines become rail device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420736389.1U CN204282138U (en) 2014-12-01 2014-12-01 Three gauge cover lines become rail device

Publications (1)

Publication Number Publication Date
CN204282138U true CN204282138U (en) 2015-04-22

Family

ID=52865318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420736389.1U Withdrawn - After Issue CN204282138U (en) 2014-12-01 2014-12-01 Three gauge cover lines become rail device

Country Status (1)

Country Link
CN (1) CN204282138U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452493A (en) * 2014-12-01 2015-03-25 湖南中创轨道工程装备有限公司 Three-gauge mantle line rail changer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452493A (en) * 2014-12-01 2015-03-25 湖南中创轨道工程装备有限公司 Three-gauge mantle line rail changer
CN104452493B (en) * 2014-12-01 2016-03-30 湖南中创轨道工程装备有限公司 Three gauge cover lines become rail device

Similar Documents

Publication Publication Date Title
CN104452487B (en) Three gauge mixed gage turnouts
CN103823155A (en) AT traction network short circuit fault distance measurement method
CN103938501B (en) A kind of rail of marking is nested with the combining device of meter-gage and transition method of transferring
CN204282138U (en) Three gauge cover lines become rail device
CN104452493B (en) Three gauge cover lines become rail device
CN205132945U (en) Automatic anchoring device of hoist walking
CN204282132U (en) Three gauge mixed gage turnouts
CN203360951U (en) Double-track-gauge orbital-transfer universal combined turnout for mine car
CN203782499U (en) Turnout passing device for car pusher
CN102304882B (en) Line rail symmetric turnout No 4.5 in urban rail transit engineering
CN206219978U (en) A kind of bridge expanssion joint survey tool
CN202257165U (en) Travelling measurement control device for movable stacking equipment
CN202081355U (en) Rail collection flatcar with lifting device
CN103144552B (en) Movable production device for railway contact system
CN202622631U (en) Grounding wire hardware fitting bolt fastening wrench
CN203157761U (en) Movable protective device for rail contact net
CN205973474U (en) Cross automatic rail device of crossing of rail hoist
CN204022295U (en) Transfer crane intersection intercommunication rail joint
CN203573166U (en) Adjustable vehicle aligning mark
CN205573953U (en) Device of turning on one's side is prevented in mine car deslagging
CN203578756U (en) Slide water gap sand filling device
CN104370217B (en) Portal crane for paving bridge decks
CN204003760U (en) Novel vehicle for welding railroad support oil cylinder
CN207106521U (en) A kind of small-sized track-laying machine stop buffer
CN203310503U (en) Mechanical anti-creeping device used for rail weighbridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150422

Effective date of abandoning: 20160330

C25 Abandonment of patent right or utility model to avoid double patenting