CN204265168U - Shipbuilding building hoist specialized standard saves - Google Patents

Shipbuilding building hoist specialized standard saves Download PDF

Info

Publication number
CN204265168U
CN204265168U CN201420604456.4U CN201420604456U CN204265168U CN 204265168 U CN204265168 U CN 204265168U CN 201420604456 U CN201420604456 U CN 201420604456U CN 204265168 U CN204265168 U CN 204265168U
Authority
CN
China
Prior art keywords
scaffold
wall part
shipbuilding
building hoist
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420604456.4U
Other languages
Chinese (zh)
Inventor
陈健
袁建新
艾小宁
沈小玲
沈鸿波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG DONGZHIJIE ELECTRIC CO Ltd
Original Assignee
NANTONG DONGZHIJIE ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG DONGZHIJIE ELECTRIC CO Ltd filed Critical NANTONG DONGZHIJIE ELECTRIC CO Ltd
Priority to CN201420604456.4U priority Critical patent/CN204265168U/en
Application granted granted Critical
Publication of CN204265168U publication Critical patent/CN204265168U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of shipbuilding building hoist specialized standard joint, comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.The utility model is rational in infrastructure, does not need prefabricated foundation, only directly need be fixed on shipbuilding scaffold by special wall-attached frame by standard knot; And not affecting in product design situation, reduce standard knot oad to greatest extent, be convenient to reduce labour intensity, save cost.

Description

Shipbuilding building hoist specialized standard saves
Technical field
The utility model relates to a kind of building hoist standard knot.
Background technology
The employing of traditional building hoist square or triangular standard joint framework, prefabricated construction lifter foundation, and connect standard knot with wall-attached frame, realize the guide rail structure of stable building hoist.Meanwhile, shipbuilding building hoist equipment still belongs to vacancy.
Summary of the invention
The purpose of this utility model is to provide a kind of rational in infrastructure, and use safety, easily shipbuilding building hoist specialized standard saves.
Technical solution of the present utility model is:
A kind of shipbuilding building hoist specialized standard saves, it is characterized in that: comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.
Described attached wall part comprises the mobile jib be connected with scaffold, and mobile jib is fixedly mounted with the left and right pipe link be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
The utility model is rational in infrastructure, does not need prefabricated foundation, only directly need be fixed on shipbuilding scaffold (steel framed structure) by special wall-attached frame by standard knot; And not affecting in product design situation, reduce standard knot oad to greatest extent, be convenient to reduce labour intensity, save cost.
The utility model, when not affecting the structural strength of shipbuilding building hoist guide rail, can save and prefabricatedly build basis, thus the time that the equipment of saving is installed; Only use two main chords, reduce the space that standard knot takies to greatest extent, reduce the material used, reduce the labour intensity of installing/dismounting; Adopt Bolt Connection form, be convenient to the installation and removal of standard knot.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the structural representation of attached wall part.
Fig. 4 is the birds-eye view of Fig. 3.
Fig. 5 is the structural representation that scaffold hooks plate.
Fig. 6 is using state schematic diagram of the present utility model.
Fig. 7 is using state birds-eye view.
Detailed description of the invention
A kind of shipbuilding building hoist specialized standard saves, in detachable one chip, comprise left and right two main chords be parallel to each other 1,2, left and right main chord is connected by three, upper, middle and lower cross bar 4,5,6, connected by diagonal web member 7 between adjacent two cross bars, a tooth bar 8 parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold 9 by bolt, arranges scaffold and hook plate 10 between attached wall part and scaffold.
Described attached wall part comprises the mobile jib 11 be connected with scaffold, and mobile jib is fixedly mounted with the left and right pipe link 12,13 be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
The utility model is only with the one chip shipbuilding building hoist specialized standard joint that two main chords are welded; By the form of non-solder, shipbuilding building hoist standard knot is attached on scaffold or other forms of steel framed structure.

Claims (2)

1. a shipbuilding building hoist specialized standard saves, it is characterized in that: comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.
2. shipbuilding building hoist specialized standard joint according to claim 1, it is characterized in that: described attached wall part comprises the mobile jib be connected with scaffold, mobile jib is fixedly mounted with the left and right pipe link be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
CN201420604456.4U 2014-10-20 2014-10-20 Shipbuilding building hoist specialized standard saves Expired - Fee Related CN204265168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420604456.4U CN204265168U (en) 2014-10-20 2014-10-20 Shipbuilding building hoist specialized standard saves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420604456.4U CN204265168U (en) 2014-10-20 2014-10-20 Shipbuilding building hoist specialized standard saves

Publications (1)

Publication Number Publication Date
CN204265168U true CN204265168U (en) 2015-04-15

Family

ID=52800047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420604456.4U Expired - Fee Related CN204265168U (en) 2014-10-20 2014-10-20 Shipbuilding building hoist specialized standard saves

Country Status (1)

Country Link
CN (1) CN204265168U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110000518A (en) * 2019-04-08 2019-07-12 湖北江汉建筑工程机械有限公司 A kind of the postwelding processing technology and processing unit (plant) of elevator standard knot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110000518A (en) * 2019-04-08 2019-07-12 湖北江汉建筑工程机械有限公司 A kind of the postwelding processing technology and processing unit (plant) of elevator standard knot
CN110000518B (en) * 2019-04-08 2020-11-24 湖北江汉建筑工程机械有限公司 Post-welding machining process and device for standard sections of elevators

Similar Documents

Publication Publication Date Title
CN201512345U (en) Multifunctional integrated lifting frame
CN203499229U (en) Operating platform for construction of elevator shaft
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN203113793U (en) Large formwork installation system of oblique structure
CN204265168U (en) Shipbuilding building hoist specialized standard saves
CN204299157U (en) The mounted lifting device in attached lifting scaffold side
CN201433588Y (en) Silo roof steel beam slip-form falling back device
CN203624808U (en) Detachable steel structure hanger
CN205590111U (en) Construction elevator attaches wall structure
CN205034948U (en) Rack formula hanging beam device
CN201722937U (en) Sliding platform for installation of net rack
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN209177844U (en) A kind of template lift up rapidly device
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN202575684U (en) Prefabricated-slab hoisting tool
CN209723570U (en) Steel column docking installation operation platform
CN202324586U (en) Integral attached device attached with lifting scaffold
CN201714048U (en) Chrysanthemum clip connection type scaffold
CN205953375U (en) Can dismantle and tower crane attachment jacking platform of independent assortment
CN205134923U (en) Adjustable distance of encorbelmenting hang mechanism
CN203639006U (en) Construction device of large-span special net rack roof
CN203113340U (en) Dam body lifting pouring construction safety platform capable of being assembled
CN204751876U (en) Simple gate is erected heavy -duty machine swift current tail and is taken off row integration special lifting device
CN203667822U (en) Pipe truss for hoisting
CN204212069U (en) Hanging basket for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20191020

CF01 Termination of patent right due to non-payment of annual fee