CN204265168U - Shipbuilding building hoist specialized standard saves - Google Patents
Shipbuilding building hoist specialized standard saves Download PDFInfo
- Publication number
- CN204265168U CN204265168U CN201420604456.4U CN201420604456U CN204265168U CN 204265168 U CN204265168 U CN 204265168U CN 201420604456 U CN201420604456 U CN 201420604456U CN 204265168 U CN204265168 U CN 204265168U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- wall part
- shipbuilding
- building hoist
- cross bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of shipbuilding building hoist specialized standard joint, comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.The utility model is rational in infrastructure, does not need prefabricated foundation, only directly need be fixed on shipbuilding scaffold by special wall-attached frame by standard knot; And not affecting in product design situation, reduce standard knot oad to greatest extent, be convenient to reduce labour intensity, save cost.
Description
Technical field
The utility model relates to a kind of building hoist standard knot.
Background technology
The employing of traditional building hoist square or triangular standard joint framework, prefabricated construction lifter foundation, and connect standard knot with wall-attached frame, realize the guide rail structure of stable building hoist.Meanwhile, shipbuilding building hoist equipment still belongs to vacancy.
Summary of the invention
The purpose of this utility model is to provide a kind of rational in infrastructure, and use safety, easily shipbuilding building hoist specialized standard saves.
Technical solution of the present utility model is:
A kind of shipbuilding building hoist specialized standard saves, it is characterized in that: comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.
Described attached wall part comprises the mobile jib be connected with scaffold, and mobile jib is fixedly mounted with the left and right pipe link be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
The utility model is rational in infrastructure, does not need prefabricated foundation, only directly need be fixed on shipbuilding scaffold (steel framed structure) by special wall-attached frame by standard knot; And not affecting in product design situation, reduce standard knot oad to greatest extent, be convenient to reduce labour intensity, save cost.
The utility model, when not affecting the structural strength of shipbuilding building hoist guide rail, can save and prefabricatedly build basis, thus the time that the equipment of saving is installed; Only use two main chords, reduce the space that standard knot takies to greatest extent, reduce the material used, reduce the labour intensity of installing/dismounting; Adopt Bolt Connection form, be convenient to the installation and removal of standard knot.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the structural representation of attached wall part.
Fig. 4 is the birds-eye view of Fig. 3.
Fig. 5 is the structural representation that scaffold hooks plate.
Fig. 6 is using state schematic diagram of the present utility model.
Fig. 7 is using state birds-eye view.
Detailed description of the invention
A kind of shipbuilding building hoist specialized standard saves, in detachable one chip, comprise left and right two main chords be parallel to each other 1,2, left and right main chord is connected by three, upper, middle and lower cross bar 4,5,6, connected by diagonal web member 7 between adjacent two cross bars, a tooth bar 8 parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold 9 by bolt, arranges scaffold and hook plate 10 between attached wall part and scaffold.
Described attached wall part comprises the mobile jib 11 be connected with scaffold, and mobile jib is fixedly mounted with the left and right pipe link 12,13 be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
The utility model is only with the one chip shipbuilding building hoist specialized standard joint that two main chords are welded; By the form of non-solder, shipbuilding building hoist standard knot is attached on scaffold or other forms of steel framed structure.
Claims (2)
1. a shipbuilding building hoist specialized standard saves, it is characterized in that: comprise left and right two main chords be parallel to each other, left and right main chord is connected by three, upper, middle and lower cross bar, connected by diagonal web member between adjacent two cross bars, a tooth bar parallel with main chord is fixed on the cross bar of three, upper, middle and lower, and described tooth bar coordinates with the transmission gear of building hoist; Middle cross bar is connected with attached wall part by bolt, and attached wall part is connected with scaffold by bolt, arranges scaffold and hook plate between attached wall part and scaffold.
2. shipbuilding building hoist specialized standard joint according to claim 1, it is characterized in that: described attached wall part comprises the mobile jib be connected with scaffold, mobile jib is fixedly mounted with the left and right pipe link be parallel to each other, left and right pipe link is connected with middle cross bar by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420604456.4U CN204265168U (en) | 2014-10-20 | 2014-10-20 | Shipbuilding building hoist specialized standard saves |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420604456.4U CN204265168U (en) | 2014-10-20 | 2014-10-20 | Shipbuilding building hoist specialized standard saves |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204265168U true CN204265168U (en) | 2015-04-15 |
Family
ID=52800047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420604456.4U Expired - Fee Related CN204265168U (en) | 2014-10-20 | 2014-10-20 | Shipbuilding building hoist specialized standard saves |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204265168U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110000518A (en) * | 2019-04-08 | 2019-07-12 | 湖北江汉建筑工程机械有限公司 | A kind of the postwelding processing technology and processing unit (plant) of elevator standard knot |
-
2014
- 2014-10-20 CN CN201420604456.4U patent/CN204265168U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110000518A (en) * | 2019-04-08 | 2019-07-12 | 湖北江汉建筑工程机械有限公司 | A kind of the postwelding processing technology and processing unit (plant) of elevator standard knot |
CN110000518B (en) * | 2019-04-08 | 2020-11-24 | 湖北江汉建筑工程机械有限公司 | Post-welding machining process and device for standard sections of elevators |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201512345U (en) | Multifunctional integrated lifting frame | |
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN204265168U (en) | Shipbuilding building hoist specialized standard saves | |
CN204299157U (en) | The mounted lifting device in attached lifting scaffold side | |
CN201433588Y (en) | Silo roof steel beam slip-form falling back device | |
CN203624808U (en) | Detachable steel structure hanger | |
CN205590111U (en) | Construction elevator attaches wall structure | |
CN205034948U (en) | Rack formula hanging beam device | |
CN201722937U (en) | Sliding platform for installation of net rack | |
CN203222981U (en) | Suspended platform for steel reinforced concrete cantilever structure construction | |
CN209177844U (en) | A kind of template lift up rapidly device | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN202575684U (en) | Prefabricated-slab hoisting tool | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN202324586U (en) | Integral attached device attached with lifting scaffold | |
CN201714048U (en) | Chrysanthemum clip connection type scaffold | |
CN205953375U (en) | Can dismantle and tower crane attachment jacking platform of independent assortment | |
CN205134923U (en) | Adjustable distance of encorbelmenting hang mechanism | |
CN203639006U (en) | Construction device of large-span special net rack roof | |
CN203113340U (en) | Dam body lifting pouring construction safety platform capable of being assembled | |
CN204751876U (en) | Simple gate is erected heavy -duty machine swift current tail and is taken off row integration special lifting device | |
CN203667822U (en) | Pipe truss for hoisting | |
CN204212069U (en) | Hanging basket for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150415 Termination date: 20191020 |
|