CN204252123U - Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism - Google Patents

Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism Download PDF

Info

Publication number
CN204252123U
CN204252123U CN201420695062.4U CN201420695062U CN204252123U CN 204252123 U CN204252123 U CN 204252123U CN 201420695062 U CN201420695062 U CN 201420695062U CN 204252123 U CN204252123 U CN 204252123U
Authority
CN
China
Prior art keywords
stopper
handle
gear
reinforcement rod
rod handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420695062.4U
Other languages
Chinese (zh)
Inventor
王政
强化
朱雪峰
王祥
王夏洋
梁峰
王小培
冯平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Priority to CN201420695062.4U priority Critical patent/CN204252123U/en
Application granted granted Critical
Publication of CN204252123U publication Critical patent/CN204252123U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism, relate to technical field of building construction, comprise pile tube, fill in stopper in the upper end of pile tube, stopper is separated with pile tube by stopper tool for uprooting; Stopper tool for uprooting comprises handle, reinforcement rod handle, helical form spear, gear installation base, a pair gear, a pair handle, handle is welded on the upper end of reinforcement rod handle, helical form spear is welded on the lower end of reinforcement rod handle, gear installation base is nested with on reinforcement rod handle, a pair gear is supported on gear installation base, and reinforcement rod handle is arranged between a pair gear, and every handles is fixedly connected with corresponding gear respectively.In construction to pile follower operation, send workman to fill in pile tube by cork, by Pile feeder, stake is depressed into design elevation.After soil excavation, stopper cleanout tool is used to be pulled out by stopper.Check discovery after being removed by on-the-spot stopper, stopper stops that stake core falls native success rate up to 99%, has substantially stopped stake core and to have fallen the phenomenon of soil.

Description

Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism
Technical field
The utility model relates to technical field of building construction.
Background technology
During piling, because soil property is silt matter soil, piling terminates will have a large amount of mud existence in rear pile tube, and according to code requirement in follow-up work, the stake core that will clean out distance pile crown absolute altitude 1.5m falls soil, this just also exists very large work, all perplex the difficult problem executed all the time, if can effective measures be formulated, while not affecting workmanship, reduce even elimination mud and fall into pile tube.A workload for core soil cleaning will be greatly reduced.Better saving is artificial, shorten the duration.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of prestressed reinforced concrete pipe pile prevent Zhuan Xintu mechanism, can avoid core fall soil phenomenon.
The purpose of this utility model is achieved in that prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism, and comprise pile tube, fill in stopper in the upper end of described pile tube, stopper is separated with pile tube by stopper tool for uprooting; Described stopper tool for uprooting comprises handle, reinforcement rod handle, helical form spear, gear installation base, a pair gear, a pair handle, handle is welded on the upper end of reinforcement rod handle, helical form spear is welded on the lower end of reinforcement rod handle, gear installation base is nested with on reinforcement rod handle, a pair gear is supported on gear installation base, and reinforcement rod handle is arranged between a pair gear, and every handles is fixedly connected with corresponding gear respectively.
In construction to pile follower operation, send workman to fill in pile tube by cork, by Pile feeder, stake is depressed into design elevation.After soil excavation, stopper cleanout tool is used to be pulled out by stopper.Check discovery after being removed by on-the-spot stopper, stopper stops that stake core falls native success rate up to 99%, has substantially stopped stake core and to have fallen the phenomenon of soil.
Adopt cork method to stop stake core soil, operative is fast simple and convenient, can clear up with soil excavation simultaneously, without stagnating in operation, takes full advantage of the time of soil excavation, and according to on-site actual situations, stake cleaning and protection work in soil excavation and carry out simultaneously.
In sum by using the scheme of cork method prevention stake core soil to be feasible, construction effect can well be ensured, and saved cost economically, progress shortens the duration, operation is connected closely, reduce the labour intensity of workman, improve production efficiency, sprawl work plane fast.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model.
Detailed description of the invention
As shown in Figure 1, prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism comprises pile tube 1, and fill in stopper 2 in the upper end of pile tube 1, stopper 2 is separated with pile tube 1 by stopper tool for uprooting 3.Stopper tool for uprooting 3 comprises handle 3-1, reinforcement rod handle 3-2, helical form spear 3-6, gear installation base 3-3, a pair gear 3-4, a pair handle 3-5, handle 3-1 is welded on the upper end of reinforcement rod handle 3-2, helical form spear 3-6 is welded on the lower end of reinforcement rod handle 3-2, gear installation base 3-3 is nested with on reinforcement rod handle 3-2, a pair gear 3-4 is supported on gear installation base 3-3, and reinforcement rod handle 3-2 is arranged between a pair gear 3-4, and every handles 3-5 is fixedly connected with corresponding gear 3-4 respectively.
In construction to pile follower operation, send workman to be filled in pile tube 1 by cork 2, by Pile feeder, stake is depressed into design elevation.After soil excavation, stopper cleanout tool 3 is used to be pulled out by cork 2.By in helical form spear 3-6 precession cork 2, rotated by the up and down driven gear 3-4 of handle 3-5, thus drive reinforcement rod handle 3-2 to move up, cork 2 is extracted in pile tube 1.

Claims (1)

1. prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism, comprise pile tube, it is characterized in that: fill in stopper in the upper end of described pile tube, stopper is separated with pile tube by stopper tool for uprooting; Described stopper tool for uprooting comprises handle, reinforcement rod handle, helical form spear, gear installation base, a pair gear, a pair handle, handle is welded on the upper end of reinforcement rod handle, helical form spear is welded on the lower end of reinforcement rod handle, gear installation base is nested with on reinforcement rod handle, a pair gear is supported on gear installation base, and reinforcement rod handle is arranged between a pair gear, and every handles is fixedly connected with corresponding gear respectively.
CN201420695062.4U 2014-11-19 2014-11-19 Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism Active CN204252123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420695062.4U CN204252123U (en) 2014-11-19 2014-11-19 Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420695062.4U CN204252123U (en) 2014-11-19 2014-11-19 Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism

Publications (1)

Publication Number Publication Date
CN204252123U true CN204252123U (en) 2015-04-08

Family

ID=52956448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420695062.4U Active CN204252123U (en) 2014-11-19 2014-11-19 Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism

Country Status (1)

Country Link
CN (1) CN204252123U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625357A (en) * 2018-06-28 2018-10-09 唐山曹妃甸二十二冶工程技术有限公司 PHC pile piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625357A (en) * 2018-06-28 2018-10-09 唐山曹妃甸二十二冶工程技术有限公司 PHC pile piles

Similar Documents

Publication Publication Date Title
CN202969389U (en) Spiral shovel for clearing soil of pile core
CN103243713A (en) Method for planting prestressed pipe pile at one step
CN204252123U (en) Prestressed reinforced concrete pipe pile prevention Zhuan Xintu mechanism
CN204199289U (en) A kind of pipe pile core mud cleaning tool
CN204174706U (en) A kind of propelling rises cooperating type pipeline with volume and replaces prosthetic device
CN204059617U (en) Bolt hole plugging device
CN204212319U (en) A kind of screw-in greenhouse pillar
CN204356772U (en) Anti-pulling pipe piles structure
CN204080794U (en) A kind of band is from the scalable guide rod of decontamination function
CN107952509A (en) A kind of break process equipment recycled for waste construction material
CN203701089U (en) Structure for manual hole digging and pile splicing on reinforced concrete drain pipe retaining wall
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN203834475U (en) Pipe pile with pre-locating function
CN203188227U (en) Anti-floating anchor pile pool
CN206605072U (en) Portable top plate drilling device
CN205618195U (en) Safe escape device that construction can be removed by oneself in tunnel
CN204703517U (en) A kind of portable mortar pool for building
CN204570917U (en) A kind of manhole dredging tool
CN204023574U (en) Assembly type draws a core mud device
CN203947480U (en) A kind of quick provisions for grouting
CN204382457U (en) Concrete water tank automatic moulding machine
CN204185860U (en) A kind of prefabricated tubular pile stake core soil is drawn except shovel
CN204326307U (en) The module wall that a kind of building construction uses
CN204098036U (en) Mud device is got in revolution
CN204386617U (en) A kind of consolidation grouting structure of low water head diversion tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant