CN204212364U - Be convenient to the flue installed - Google Patents

Be convenient to the flue installed Download PDF

Info

Publication number
CN204212364U
CN204212364U CN201420574171.0U CN201420574171U CN204212364U CN 204212364 U CN204212364 U CN 204212364U CN 201420574171 U CN201420574171 U CN 201420574171U CN 204212364 U CN204212364 U CN 204212364U
Authority
CN
China
Prior art keywords
flue
pipe
convenient
flue pipe
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420574171.0U
Other languages
Chinese (zh)
Inventor
王仁林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420574171.0U priority Critical patent/CN204212364U/en
Application granted granted Critical
Publication of CN204212364U publication Critical patent/CN204212364U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a kind of flue being convenient to install, and it is docked by more piece flue pipe and forms, and the length of described flue pipe is 2/3rds of floor height and slab thickness sum.The purpose of this utility model is to provide a kind of flue being convenient to install, the impact not by story height in its installation process, and the maintenance at docking port place can not destroy skirting or floor.The utility model has the advantage of: the length of flue pipe is 2/3rds of floor height and slab thickness sum, its length is arranged on flue pipe and carries position to perpendicular impact of putting not by story height in the installation process of installation site by level; In addition, three flue pipes just in time complete the flue installation of two floors, and its flue pipe docking port has the distance of general 1-2m at a distance of upper and lower floor, and when flue pipe docking port generation smoke blowing, aftertaste, convenient for maintaining, can not destroy floor or skirting.

Description

Be convenient to the flue installed
Technical field
The utility model relates to a kind of air exhausting device field, particularly a kind of flue being convenient to install.
Background technology
Existing flue is all docked by more piece flue pipe to form, and the length often saving flue pipe is equal with floor height, very inconvenient in the installation process of flue pipe, and when flue pipe joint generation smoke blowing aftertaste, maintenance needs to destroy skirting or floor.
In addition, when existing flue pipe is installed, the joint of upper and lower two joint flue pipes is directly bonded by glue.Glue plays the effect of sealing to adjacent flue pipe junction, after long-term use, along with the degeneration of glue performance, the situation of dislocation is easily there is between adjacent flue pipe, while causing flue to leak gas, flue pipe can be caused to lack support force and impaired, even cave in.
Summary of the invention
The purpose of this utility model is to provide a kind of flue being convenient to install, the impact not by story height in its installation process, and the maintenance at docking port place can not destroy skirting or floor.
The purpose of this utility model is achieved through the following technical solutions: a kind of flue being convenient to install, and it is docked by more piece flue pipe and forms, and the length of described flue pipe is 2/3rds of floor height and slab thickness sum.
Compared to prior art, the utility model has the advantage of:
1. the length of flue pipe is 2/3rds of floor height and slab thickness sum, and its length is arranged on flue pipe and carries position to perpendicular impact of putting not by story height in the installation process of installation site by level; In addition, three flue pipes just in time complete the flue installation of two floors, and its flue pipe docking port has the distance of general 1-2m at a distance of upper and lower floor, and when flue pipe docking port generation smoke blowing, aftertaste, convenient for maintaining, can not destroy floor or skirting.
2. smoke evacuation ways inside is provided with a flue gas guide channel, and the level height of its entrance point, lower than the level height of the port of export, can effectively prevent flue gas from pouring in down a chimney; And ways of discharging fume is located on flue lateral wall, do not take discharge flue space in flue, make fume emission in flue more smooth and easy.
3. adopt pipe collar to carry out reinforcing to the junction of adjacent flue pipe to fix, pipe collar is provided with the expansion bolt be fastened on body of wall, the support of auxiliary flue pipe is fixed, and strengthens the steadiness of overall flue pipe; One slat gum band is set in addition at the inside wall of pipe collar, the sealing effectiveness of auxiliary flue pipe junction, the smoke impervious of auxiliary junction glue.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation being convenient to the flue embodiment of installing of the utility model.
Fig. 2 is the structural representation of a kind of embodiment guide member of discharging fume of the utility model.
Fig. 3 is the structure sectional view of a kind of flue pipe collar of the utility model member embodiment.
Fig. 4 be in Fig. 3 A-A to structural representation.
Fig. 5 is the scheme of installation of flue pipe.
Label declaration: 1 flue pipe, 2 pipe collars, 3 slide plates, 4 expansion bolts, 5 bodies of wall, 6 bands, 7 flue gas guide channels, 8 smoke discharging pipes, 9 floors.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the utility model content is described in detail:
Be a kind of embodiment schematic diagram of flue being convenient to install that the utility model provides as shown in Figures 1 to 5.
Be convenient to the flue installed, it is docked by more piece flue pipe 1 and forms, and the length of described flue pipe 1 is 2/3rds of floor height and floor 9 thickness sum.
As shown in Figure 5, with floor height 2.8m, floor 9 thickness 0.2m is example, often saves flue pipe 1 length and is 2m, and the flue that three joint flue pipes 1 just in time can complete two floors is installed, and namely three joint flue pipes 1 are a circulation.There is the distance of 0.2m when mounted apart from floor 9 upper surface bottom orlop flue pipe 1, it can be the greasy dirt gathering-device that a pad is located at bottom flue pipe 1, flue pipe 1 is when docking, its joint is respectively 0.2m, 2.2m and 1.2m apart from floor 9 upper level, when above-mentioned height is arranged on flue pipe 1 docking port generation smoke blowing, aftertaste, convenient for maintaining, can not destroy floor 9 or skirting because of maintenance.
Described flue pipe 1 cross section is annular, and not only exhaust air rate is large but also gas fluidity good relative to square discharge flue for the discharge flue of its circle; In addition, cirque structure uniform wall thickness, without unnecessary structural volume, takes up room little from heavy and light.
It also comprises the smoke evacuation ways be located on flue pipe 1 lateral wall, described smoke evacuation ways inside is provided with a flue gas guide channel 7, the entrance point of flue gas guide channel 7 is connected with smoke discharging pipe 8, and the port of export of flue gas guide channel 7 is connected with the discharge flue in flue pipe 1; The level height of described flue gas guide channel 7 entrance point is lower than the level height of flue gas guide channel 7 port of export.
Smoke evacuation ways is located on flue lateral wall, does not take discharge flue space in flue, makes fume emission in flue more smooth and easy.
Flue pipe 1 inside smoke is all discharge from lower to upper, and flue gas guide channel 7 entrance point, lower than the port of export, makes flue gas basipetally cannot pass flue gas guide channel 7, and then pours in down a chimney to smoke discharging pipe 8.
It also comprises flue band clamp members, described flue band clamp members comprises the pipe collar 2 being wrapped in two joints adjacent flue pipe 1 joint lateral surface, described pipe collar 2 is also provided with several fixation kits for being fixed on body of wall 5, described fixation kit comprises and is slidably located in slide plate 3 on pipe collar 2 outer wall and rotates the expansion bolt 4 be arranged on slide plate 3.Pipe collar 2 carries out rigidity to two flue pipes 1 to be fixed, and prevents the dislocation between flue pipe 1.Meanwhile, conveniently pipe collar 2 and body of wall 5 are directly fixed, described pipe collar 2 outer wall goes back slip cap and is provided with slide plate 3, described slide plate 3 rotates and is provided with an expansion bolt 4.Slide plate 3 can slide in the position of pipe collar 2, is convenient to adjust pipe collar 2 and the mounting points of body of wall 5, reduces difficulty of construction.Pipe collar 2 can handled easily personnel be arranged on body of wall 5 by expansion bolt 4, and expansion bolt directly directly screws in only need wear a bolt hole on body of wall correspondence position after by operating personnel.The number of slide plate can according to flue pipe in the position of body of wall, the weight of flue pipe self sets.
Further, in order to strengthen the sealing of adjacent flue pipe 1 junction further, after junction is with glue bonding, between pipe collar 2 and flue pipe 1 outer wall, be also provided with the band 6 be wrapped in outside flue pipe 1.Sealing can be the sealing materials such as rubber strip, polytetrafluoroethylene (PTFE), silica gel.Certainly, also can, by applying glue inside band 6, band 6 be directly bonded on flue pipe 1 outer wall, to increase the sealing of flue pipe 1 junction more further.
In addition, directly between pipe collar medial surface and flue pipe outer wall, also adhesive layer can be provided with.Adhesive layer also plays the effect of sealing while being bonded in by pipe collar on flue pipe outer wall.The material of adhesive layer has multiple can selection, such as glass cement, phenol glue, urea-formaldehyde glue etc., and preferential use is identical with the material (such as cement) of flue pipe, because flue pipe material itself has fireproof performance.

Claims (8)

1. be convenient to the flue installed, it is characterized in that: it is docked by more piece flue pipe (1) and forms, and the length of described flue pipe (1) is 2/3rds of floor height and floor (9) thickness sum; It also comprises flue band clamp members, described flue band clamp members comprises the pipe collar (2) being wrapped in two joints adjacent flue pipe (1) joint lateral surface, described pipe collar (2) is also provided with several fixation kits for being fixed on body of wall (5), described fixation kit comprises the slide plate (3) on the pipe collar that is slidably located in (2) outer wall and rotates the expansion bolt (4) be arranged on slide plate (3).
2. the flue being convenient to install according to claim 1, is characterized in that: described flue pipe (1) cross section is annular.
3. the flue being convenient to install according to claim 1, it is characterized in that: it also comprises the smoke evacuation ways be located on flue pipe (1) lateral wall, described smoke evacuation ways inside is provided with a flue gas guide channel (7), the entrance point of flue gas guide channel (7) is connected with smoke discharging pipe (8), and the port of export of flue gas guide channel (7) is connected with the discharge flue in flue pipe (1); The level height of described flue gas guide channel (7) entrance point is lower than the level height of flue gas guide channel (7) port of export.
4. the flue being convenient to install according to claim 1, is characterized in that: described pipe collar (2) medial surface is also provided with the band (6) being wrapped in flue pipe (1) outside.
5. the flue being convenient to install according to claim 4, is characterized in that: described band (6) is rubber strip.
6. the flue being convenient to install according to claim 4, is characterized in that: described band (6) is bonded on flue pipe (1) outer wall by glue.
7. the flue being convenient to install according to claim 1, is characterized in that: be also provided with adhesive layer between described pipe collar (2) medial surface and flue pipe (1) outer wall.
8. the flue being convenient to install according to claim 7, is characterized in that: the material of described adhesive layer is identical with the material of flue pipe (1).
CN201420574171.0U 2014-09-30 2014-09-30 Be convenient to the flue installed Expired - Fee Related CN204212364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420574171.0U CN204212364U (en) 2014-09-30 2014-09-30 Be convenient to the flue installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420574171.0U CN204212364U (en) 2014-09-30 2014-09-30 Be convenient to the flue installed

Publications (1)

Publication Number Publication Date
CN204212364U true CN204212364U (en) 2015-03-18

Family

ID=52981048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420574171.0U Expired - Fee Related CN204212364U (en) 2014-09-30 2014-09-30 Be convenient to the flue installed

Country Status (1)

Country Link
CN (1) CN204212364U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760893A (en) * 2017-03-08 2017-05-31 中国十九冶集团有限公司 The permanent docking facilities of flue and installation method
CN109869776A (en) * 2017-12-04 2019-06-11 江苏洪诚健康科技有限公司 The flue being easily installed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760893A (en) * 2017-03-08 2017-05-31 中国十九冶集团有限公司 The permanent docking facilities of flue and installation method
CN109869776A (en) * 2017-12-04 2019-06-11 江苏洪诚健康科技有限公司 The flue being easily installed

Similar Documents

Publication Publication Date Title
CN204212364U (en) Be convenient to the flue installed
JP5441616B2 (en) Tunnel lining formwork and lining method
CN204187651U (en) Flue band clamp members
CN208169710U (en) Novel positioning plugging water pipe steel sleeve
CN108532629B (en) Light strenghthened type concrete piping lane
JP2010222864A (en) Device for curing lining concrete
CN207664547U (en) A kind of novel PVC power cable protecting pipe
CN206018145U (en) A kind of hydraulic engineering pipeline protection cover
CN212897096U (en) Toilet is with assembled labyrinth type air supply arrangement
CN204343676U (en) A kind of concrete floor reserving hole stopend
CN204459532U (en) Building pipe link
CN209398923U (en) Segmental timbering
CN205014572U (en) Two -chamber formula noise elimination static pressure case
CN205276463U (en) Steel construction unit -installment building body and peripheral protective structure thereof
CN205954434U (en) Tunnel or for pipeline boardwalk
CN103498525A (en) Floor slab with preinstalled pipelines
CN203671018U (en) Right-angle elbow pipe full fixing joint structure
CN205806707U (en) Pipeline with prefabricated sleeve pipe
CN204460403U (en) A kind of heating wall
CN207863183U (en) A kind of greenhouse steel construction roof platform skirtboard
CN219491597U (en) Sealing anti-leakage flue installation connecting device
RU190265U1 (en) Tubular device for creating an ice coating of galvanized profiled sheet on a supporting frame honeycomb base from asbestos-cement slabs filled with insulation
CN204311549U (en) A kind of Novel drain
CN204299195U (en) A kind of network frame plate installation car
CN203791865U (en) Lower fume exhaust device for welding training workshop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318