CN209398923U - Segmental timbering - Google Patents
Segmental timbering Download PDFInfo
- Publication number
- CN209398923U CN209398923U CN201822002356.5U CN201822002356U CN209398923U CN 209398923 U CN209398923 U CN 209398923U CN 201822002356 U CN201822002356 U CN 201822002356U CN 209398923 U CN209398923 U CN 209398923U
- Authority
- CN
- China
- Prior art keywords
- convex block
- suspension plate
- suspension
- fixed part
- backing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 claims abstract description 44
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 15
- 239000000463 material Substances 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 description 14
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000003028 elevating effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses segmental timberings, including fixed part and support frame;The fixed part is fixed on the lower surface of suspension part, and support frame as described above is movably installed in the fixed part lower part;The fixed part includes pedestal, backing plate, screw, the first convex block, mounting groove and the second convex block;The pedestal is vertically arranged at the backing plate lower surface;The fixed part is fixed on the lower surface of the suspension part by the screw through the backing plate.The utility model segmental timbering can shorten the construction period, reduce accident rate, reduce cost of labor, material cost.
Description
Technical field
The utility model relates to building implement technical fields, more particularly, to segmental timbering.
Background technique
Construction and installation refer to assembly, the placement work of the equipment such as various productions, power, lifting, transport, transmission, medical experiment
Journey, the installing engineering of the workbench being connected with equipment, ladder, railing are mounted the works such as insulation, anti-corrosion, heat preservation, the paint of equipment
Journey.Construction and installation mainly include route installation, equipment installation and Pipe installing.Route installation includes mainly to electric power in building
The installation of route, computer network route, broadcast TV line etc. is laid with;Pipe installing mainly includes water supply pipe, is lauched
The installation of pipeline, ventilating duct of central air conditioner etc. is built;Equipment installation mainly includes central air-conditioning, pure water filtering system, electricity
The installation of the equipment such as power safeguards system.
First fix bracket in traditional architecture installing engineering, then the pipelines of the various media in mounting bracket, electric bridge, logical
The installation procedure of air piping and electromechanical equipment, task difficulty is high, and installation accuracy is low, abnormally dangerous property, people for operating personnel
Power cost and material cost are high.
Utility model content
In view of this, the purpose of this utility model is in view of the deficiencies of the prior art, to provide segmental timbering, it can shorten and apply
The work duration reduces accident rate, reduces cost of labor, material cost.
In order to achieve the above objectives, the utility model uses following technical scheme: segmental timbering, including fixed part and support
Frame;The fixed part is fixed on the lower surface of suspension part, and support frame as described above is movably installed in the fixed part lower part;
The fixed part includes pedestal, backing plate, screw, the first convex block, mounting groove and the second convex block;The pedestal is set vertically
It is placed in the backing plate lower surface;The fixed part is fixed on the following table of the suspension part by the screw through the backing plate
Face;First convex block is symmetrically disposed on the side of base, and two symmetrically arranged first convex block sides are tilted in inverted trapezoidal
Setting, second convex block are set to the outside of first convex block;The bottom edge of second convex block and first convex block
Bottom edge is isometric to be flushed, and the side of second convex block is parallel with the side of first convex block;First convex block and described
Mounting groove is set between two convex blocks;
Support frame as described above includes Vertical section, horizontal profile, suspension plate and inserted sheet;The Vertical section Symmetrical vertical is fixed on described
The suspension plate is fixed on horizontal profile ends, the Vertical section top, and the suspension plate is in equilateral inverted ladder shape, and the inserted sheet is set
It is placed on the outside of the side of the suspension plate;The inserted sheet can be inserted into the mounting groove, can slide up and down in the mounting groove.
Further, the top edge of second convex block is located at below backing plate, and the side edge length of second convex block is less than
The side edge length of first convex block.
Further, the two sides of the suspension plate and the side of symmetrically arranged first convex block and the side of the second convex block
Side is parallel, and the bottom edge length of the suspension plate is equal to the spacing between symmetrically arranged two first convex block bottom edge.
Further, the vertical height of the suspension plate be less than second convex block top edge and the backing plate lower surface it
Between vertical distance.
Further, the inserted sheet outer side edges are parallel with the suspension plate side, and edge lengths are not more than on the outside of the inserted sheet
The side edge length of the suspension plate, the thickness of the inserted sheet are not more than the thickness of the suspension plate.
Further, first convex block and second convex block and the pedestal are integrally formed, the backing plate with it is described
Pedestal is integrally formed.
Further, the suspension plate and the Vertical section are to be welded to connect, and the Vertical section and the horizontal profile are weldering
It connects in succession.
The beneficial effects of the utility model are:
The segmental timbering of the utility model by promoted support frame by suspension plate move into the first convex block and the second convex block it
Between, inserted sheet is slid into mounting groove, support frame fixation is hung on into fixed part;The segmental timbering of the utility model integrally will peace
The various pipes and equipment for filling engineering carry out ground-mounted, then lift and directly hang installation to design position.The utility model
Segmental timbering can reduce the construction period, installer need to only fill in various pipelines of the ground on the bracket and equipment
Match, so as to accelerate construction progress, while ensureing assembly precision, installation accuracy is high;The segmental timbering of the utility model can
The operating frequency on scaffold face and time are reduced, accident rate is substantially reduced;The segmental timbering of the utility model can subtract
Few construction cost carries out integral installation to the equipment on bracket and bracket, to reduce the crossed construction of all kinds of professions, cooperation is not
The problem of in place, to reduce cost of labor, material cost.
Detailed description of the invention
Attached drawing 1 is that the segmental timbering of the utility model hangs schematic diagram;
Attached drawing 2 is that the segmental timbering fixed part of the utility model is fixed on suspension part schematic diagram;
Attached drawing 3 is the support frame schematic diagram of the segmental timbering of the utility model;
Attached drawing 4 is the fixed part main view of the segmental timbering of the utility model;
Attached drawing 5 is that the segmental timbering of the utility model removes the fixed part top view of backing plate and screw;
Attached drawing 6 is that the segmental timbering of the utility model removes the fixed part bottom view of backing plate and screw;
Attached drawing 7 is the fixed part left view of the segmental timbering of the utility model;
Attached drawing 8 is the support frame partial front elevation view of the segmental timbering of the utility model;
Attached drawing 9 is the support frame partial top view of the segmental timbering of the utility model.
Specific embodiment
It is specific embodiment of the utility model below, the technical solution of the utility model is further described, but
The utility model is not limited to these examples.
Embodiment 1
Segmental timbering, including fixed part 1 and support frame 2.The fixed part 1 is fixed on the lower surface of suspension part 3, described
Support frame 2 is movably installed in 1 lower part of fixed part.
The fixed part 1 includes pedestal 11, backing plate 12, screw 13, the first convex block 14, mounting groove 15 and the second convex block 16;
The pedestal 11 is vertically arranged at 12 lower surface of backing plate;The fixed part 1 runs through the backing plate 12 by the screw 13
It is fixed on the lower surface of the suspension part 3;First convex block 14 is symmetrically disposed on 11 side of pedestal, and two are symmetrical arranged
14 side of the first convex block be obliquely installed in inverted trapezoidal, second convex block 16 is set to the outside of first convex block 14, such as
Shown in Fig. 7;The bottom edge of second convex block 16 with the bottom edge of first convex block 14 is isometric flushes, the side of second convex block 16
Side is parallel with the side of first convex block 14;Mounting groove 15 is set between first convex block 14 and second convex block 16.
Support frame as described above 2 includes Vertical section 21, horizontal profile 22, suspension plate 23 and inserted sheet 24.The Vertical section 21 symmetrically hangs down
Directly be fixed on 22 both ends of horizontal profile, the suspension plate 23 is fixed on 21 top of Vertical section, the suspension plate 23 in etc.
Side inverted ladder shape, the inserted sheet 24 are set on the outside of the side of the suspension plate 23.The inserted sheet 24 can be inserted into the mounting groove
In 15, it can be slided up and down in the mounting groove 15.
Embodiment 2
The present embodiment difference from example 1 is that: the top edge of second convex block 16 is located at the lower section of backing plate 12,
The side edge length of second convex block 16 is less than 14 side edge length of the first convex block.
Embodiment 3
The present embodiment and embodiment 2 the difference is that: the two sides of the suspension plate 23 and symmetrically arranged first
14 side of convex block and 16 side of the second convex block are parallel, and it is convex that the bottom edge length of the suspension plate 23 is equal to symmetrically arranged two first
Spacing between 14 bottom edge of block.
Embodiment 4
The present embodiment and embodiment 3 the difference is that: the vertical height of the suspension plate 23 is convex less than described second
Vertical distance between 12 lower surface of 16 top edge of block and the backing plate.
Embodiment 5
The present embodiment difference from example 1 is that: 24 outer side edges of inserted sheet and 23 side of suspension plate are flat
Row, the 24 outside edge lengths of inserted sheet are not more than the side edge length of the suspension plate 23, and the thickness of the inserted sheet 24 is not more than institute
State the thickness of suspension plate 23.
Embodiment 6
The present embodiment difference from example 1 is that: first convex block 14 and second convex block 16 with it is described
Pedestal 11 is integrally formed, and the backing plate 12 is integrally formed with the pedestal 11.
Embodiment 7
The present embodiment difference from example 1 is that: the suspension plate 23 is to be welded to connect with the Vertical section 21,
The Vertical section 21 is to be welded to connect with the horizontal profile 22.
The application method of segmental timbering, includes the following steps: S1: the backing plate 12 of fixed part 1 is fixed by screw 13
In the lower surface of suspension part 3, part to be installed is assemblied on support frame 2;S2: support frame 2 is promoted to using elevating mechanism outstanding
The lower section in extension portion 3;S3: promoting suspension plate 23 and the top of 24 to the second convex block of inserted sheet 16 of support frame 2, and horizontal translation is to first convex
Between block 14 and the second convex block 16, elevating mechanism pushes support frame 2 to move down, the slide downward in mounting groove 15 of inserted sheet 24, until outstanding
Hanging plate 23 is placed in 1 bottom of fixed part, and support frame 2 is hung on fixed part 1.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, this field
Other modifications or equivalent replacement that those of ordinary skill makes the technical solution of the utility model, it is practical without departing from this
The spirit and scope of new technique scheme should all cover in the scope of the claims of the utility model.
Claims (7)
1. segmental timbering, it is characterised in that: including fixed part and support frame;The fixed part is fixed on the following table of suspension part
Face, support frame as described above are movably installed in the fixed part lower part;
The fixed part includes pedestal, backing plate, screw, the first convex block, mounting groove and the second convex block;The pedestal is vertically arranged at
The backing plate lower surface;The fixed part is fixed on the lower surface of the suspension part by the screw through the backing plate;Institute
It states the first convex block and is symmetrically disposed on the side of base, two symmetrically arranged first convex block sides are obliquely installed in inverted trapezoidal,
Second convex block is set to the outside of first convex block;The bottom edge etc. on the bottom edge of second convex block and first convex block
Length flushes, and the side of second convex block is parallel with the side of first convex block;First convex block and second convex block
Between mounting groove is set;
Support frame as described above includes Vertical section, horizontal profile, suspension plate and inserted sheet;The Vertical section Symmetrical vertical is fixed on the horizontal type
The suspension plate is fixed on material both ends, the Vertical section top, and the suspension plate is in equilateral inverted ladder shape, and the inserted sheet is set to
On the outside of the side of the suspension plate;The inserted sheet can be inserted into the mounting groove, can slide up and down in the mounting groove.
2. segmental timbering according to claim 1, it is characterised in that: the top edge of second convex block is located under backing plate
Side, the side edge length of second convex block are less than the side edge length of first convex block.
3. segmental timbering according to claim 2, it is characterised in that: the two sides of the suspension plate with it is symmetrically arranged
The side of first convex block and the side of the second convex block are parallel, and the bottom edge length of the suspension plate is equal to symmetrically arranged two first
Spacing between convex block bottom edge.
4. segmental timbering according to claim 3, it is characterised in that: the vertical height of the suspension plate is less than described the
Vertical distance between two convex block top edges and the backing plate lower surface.
5. segmental timbering according to claim 1, it is characterised in that: the inserted sheet outer side edges and the suspension plate side
In parallel, no more than the side edge length of the suspension plate, the thickness of the inserted sheet is not more than described outstanding edge lengths on the outside of the inserted sheet
The thickness of hanging plate.
6. segmental timbering according to claim 1 or 4, it is characterised in that: first convex block and second convex block
It is integrally formed with the pedestal, the backing plate and the pedestal are integrally formed.
7. segmental timbering according to claim 1 or 4, it is characterised in that: the suspension plate is weldering with the Vertical section
It connects in succession, the Vertical section and the horizontal profile are to be welded to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822002356.5U CN209398923U (en) | 2018-11-30 | 2018-11-30 | Segmental timbering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822002356.5U CN209398923U (en) | 2018-11-30 | 2018-11-30 | Segmental timbering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209398923U true CN209398923U (en) | 2019-09-17 |
Family
ID=67881392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822002356.5U Expired - Fee Related CN209398923U (en) | 2018-11-30 | 2018-11-30 | Segmental timbering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209398923U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109386656A (en) * | 2018-11-30 | 2019-02-26 | 河南建融项目管理有限公司 | Segmental timbering |
-
2018
- 2018-11-30 CN CN201822002356.5U patent/CN209398923U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109386656A (en) * | 2018-11-30 | 2019-02-26 | 河南建融项目管理有限公司 | Segmental timbering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108894372B (en) | Modeling plate curtain wall assembly structure | |
CN209398923U (en) | Segmental timbering | |
CN107338892B (en) | The removable plate of type unitized curtain wall and disassembly, installation method | |
CN204534892U (en) | A kind of Bidirectional adjustable air conditioner support | |
CN202064501U (en) | Equipment belt suspended ceiling adopting glassfibre sound panel | |
CN109186002A (en) | Portable air-conditioning mounting bracket | |
CN210482377U (en) | Assembled gallows of utility tunnel pipeline | |
CN210857774U (en) | Roof light framework plate installation device | |
CN109386656A (en) | Segmental timbering | |
CN206844552U (en) | The cladding supporting and limiting device of wall brick | |
CN215054452U (en) | Bearing type ceiling system | |
CN212435302U (en) | Dual thermal-insulated bus duct | |
CN210372341U (en) | Pipe gallery supporting and hanging frame for urban underground pipeline | |
CN210623800U (en) | Pipe gallery supporting and hanging frame | |
CN210399405U (en) | Capillary network radiation air conditioning device | |
CN206281182U (en) | A kind of novel cooling medium pipe and condensate pipe suspension and support | |
CN208778859U (en) | A kind of water pipe heat preservation bracket | |
CN106826201B (en) | A kind of hydraulic dismounting device and method being exclusively used in large size valve | |
CN220714607U (en) | Hanging type smoke blocking hanging wall mounting structure | |
CN206346352U (en) | Hangar system that stainless steel faceplate is seamless | |
CN220647002U (en) | Screw suspender comprehensive support | |
CN220605462U (en) | Double-sided socket-type bridge support | |
CN220037884U (en) | Connecting device of heat preservation pipeline conversion bracket on top surface of structure | |
CN202492948U (en) | Full-glass curtain wall system with overhung glass fins | |
CN102535705A (en) | Overhung glass rib type full-glass curtain wall system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190917 |
|
CF01 | Termination of patent right due to non-payment of annual fee |