CN103498525A - Floor slab with preinstalled pipelines - Google Patents

Floor slab with preinstalled pipelines Download PDF

Info

Publication number
CN103498525A
CN103498525A CN201310439481.1A CN201310439481A CN103498525A CN 103498525 A CN103498525 A CN 103498525A CN 201310439481 A CN201310439481 A CN 201310439481A CN 103498525 A CN103498525 A CN 103498525A
Authority
CN
China
Prior art keywords
floor
pipe
layer
enclosing cover
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310439481.1A
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310439481.1A priority Critical patent/CN103498525A/en
Publication of CN103498525A publication Critical patent/CN103498525A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The invention relates to a floor slab with preinstalled pipelines. The floor slab comprises a steel structure frame plate, a floor and a ceiling. The floor is arranged on the steel structure frame plate and composed of a concrete layer, a waterproof mortar layer and a floor tile layer. The floor slab is prefabricated and massively produced in a factory and is high in productivity, reliable in quality, uniform in size, good in waterproof effect of pipeline connectors, firm in sealing, and long in service life.

Description

Be preinstalled with the floor of pipeline
Technical field
The present invention relates to building field, be specifically related to a kind of floor that is preinstalled with pipeline.
Background technology
In modern architecture, steel work becomes the main development direction gradually, but because steel building has batch production production, speed of application is fast, building waste is few, constructional materials can reuse, anti-seismic performance is good, be easy to transformation in using, the advantage such as flexible.In the steel building building course, floor will be used Connection Block with girder steel, floor with often being connected of body of wall with steel column, floor.
Existing Connection Block is fixed Connection Block, adopts welding, riveted joint or bolted mode to be fixed on building unit.Existing Connection Block is generally all given prominence to and is arranged on floor, when floor is connected with other building units, can cause the problem that has gap while connecting, and this fixed exist flexibility not, be not easy to adjust, install the shortcomings such as inconvenient, especially do not need to use Connection Block in some place, the fixed connecting base of making in advance on floor takes up space, hinders assembling on the contrary.
Summary of the invention
The objective of the invention is in order to overcome the deficiencies in the prior art, but provide that a kind of production efficiency is high, the floor that is preinstalled with pipeline of the fast factory normalization production of speed of application, modular.
The present invention is achieved by the following technical programs:
Be preinstalled with the floor of pipeline, comprise the steel work deckle board, floor and ceiling, be provided with floor above described steel work deckle board, be provided with ceiling below described steel work deckle board, described steel work deckle board is between described floor and described ceiling, it is characterized in that: described floor is by layer of concrete, the waterproofing mortar layer, the wood floor bolck layer forms, described layer of concrete casts on the steel work deckle board, the layer of concrete top is provided with the waterproofing mortar layer, described waterproofing mortar layer top laying floor brick layer, be provided with a plurality of supplying drainages on floor, ajutage, exhaust duct, power distribution pipe, the pipeline interface of garbage pipe, be prefabricated with supplying drainage in described steel work deckle board, ajutage, exhaust duct, garbage pipe and distribution pipeline, pipe joint is equipped with in described steel work deckle board side.
Preferably, described pipeline interface comprises built-in pipe, enclosing cover, inner seat, extension tube attached, and described built-in pipe is cylindric, in floor, adopts anti-cement sealing between described built-in pipe and waterproofing mortar layer, layer of concrete in advance; The top of described built-in pipe is provided with enclosing cover and inner seat, in the middle of described enclosing cover, has circular hole, and surrounding is established downward edge; Described inner seat is hollow peviform structure, and between enclosing cover and built-in pipe, its underpart and built-in pipe join, and its upper end is connected with enclosing cover by encapsulant; Described extension tube attached is arranged in the circular hole in the middle of enclosing cover, and is tightly connected by fluid sealant and enclosing cover, and described enclosing cover is positioned on floor.
Technique effect of the present invention is as follows:
(1) the present invention adopts the mode that factory's internal standardization is produced, according to unified design, unified technique pipeline systems such as prefabricated plumbing, air-supply, air draft, rubbish, distribution in floor, carry out strict quality examination in factory, guarantee that dimensional standard, reliable in quality, interchangeability are good.In addition, unified size blanking, or carry out in advance the manufacture craft design, and can guarantee reasonable materials, accomplish clout, minimal waste, save material.
(2) the present invention is prefabricated with the pipeline systems such as plumbing, air-supply, air draft, distribution in floor, floor top, below be provided with pipeline interface, the joint of pipeline is housed in side, after floor is installed at the construction field (site), needn't carry out again the installation of the pipelines such as water power, reduce the workload of site operation, improved the efficiency of site operation, significantly improved building speed.Due to pipeline system prefabricated batch production in factory, the workman operates that work situation is good, labour intensity is low, productivity ratio is high, reliable in quality, size are unified.
(3) pipeline interface of the present invention comprises built-in pipe, enclosing cover, inner seat, extension tube attached, adopt anti-cement sealing between built-in pipe and waterproofing mortar layer, layer of concrete, inner seat is hollow peviform structure, between enclosing cover and built-in pipe, its underpart and built-in pipe join, its upper end is connected with enclosing cover by encapsulant, extension tube attached is tightly connected by fluid sealant and enclosing cover, this pipeline interface structure has good water-proof effect, sealing firmly, can effectively prevent run, drip, leak, long service life, safe, maintenance is few.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is steel work deckle board internal pipeline system layout.
The structural representation that Fig. 3 is pipeline interface.
In accompanying drawing: 1-ceiling, 2-steel work deckle board, 3-floor, 31-layer of concrete, 32-waterproofing mortar layer, 33-wood floor bolck layer, 4-pipe joint, 5-pipeline interface, 51-extension tube attached, 52-enclosing cover, 53-anti-cement, 54-built-in pipe, 55-encapsulant, 56-inner seat, 6-pipeline system.
The specific embodiment
As shown in Figure 1, be preinstalled with the floor of pipeline, comprise ceiling 1, floor 3 and ceiling 1, above described ceiling 1, be provided with floor 3, below be provided with ceiling 1, described ceiling 1 is between floor 3 and ceiling 1.As shown in Figure 2, be prefabricated with the pipeline systems 6 such as supplying drainage, ajutage, exhaust duct, garbage pipe and power distribution pipe in described ceiling 1.
As shown in Figure 1, Figure 3, described floor 3 consists of layer of concrete 31, waterproofing mortar layer 32, wood floor bolck layer 33, described layer of concrete 31 casts on ceiling 1, layer of concrete 31 tops are provided with waterproofing mortar layer 32, described waterproofing mortar layer 32 top laying floor brick layer 33 are provided with the pipeline interface 5 of a plurality of supplying drainages, ajutage, exhaust duct, power distribution pipe, garbage pipe on floor 3.Pipe joint 4 is equipped with in ceiling 1 side.
As shown in Figure 3, described pipeline interface 5 comprises built-in pipe 54, enclosing cover 52, inner seat 56, extension tube attached 51, and described built-in pipe 54 is cylindric, in floor 3, adopts anti-cement 53 sealings between described built-in pipe 54 and waterproofing mortar layer 32, layer of concrete 31 in advance; The top of described built-in pipe 54 is provided with enclosing cover 52 and inner seat 56, in the middle of described enclosing cover 52, has circular hole, and surrounding is established downward edge; Described inner seat 56 is hollow peviform structure, and between enclosing cover 52 and built-in pipe 54, its underpart and built-in pipe 54 join, and its upper end is connected with enclosing cover 52 by encapsulant 55; Described extension tube attached 51 is arranged in the circular hole in the middle of enclosing cover 52, and is tightly connected by fluid sealant and enclosing cover 52, and described enclosing cover 52 is positioned on floor 3.
Above embodiment is explanation of the invention, and non-limiting, and more than just part is given an example.Should be noted that, concerning the technician of the industry, simple transformation and the improvement according to basic principle of the present invention and structure, carried out, the combination of carrying out according to above embodiment, include within protection scope of the present invention.

Claims (2)

1. be preinstalled with the floor of pipeline, comprise the steel work deckle board, floor and ceiling, be provided with floor above described steel work deckle board, be provided with ceiling below described steel work deckle board, described steel work deckle board is between described floor and described ceiling, it is characterized in that: described floor is by layer of concrete, the waterproofing mortar layer, the wood floor bolck layer forms, described layer of concrete casts on the steel work deckle board, the layer of concrete top is provided with the waterproofing mortar layer, described waterproofing mortar layer top laying floor brick layer, be provided with a plurality of supplying drainages on floor, ajutage, exhaust duct, power distribution pipe, the pipeline interface of garbage pipe, be prefabricated with supplying drainage in described steel work deckle board, ajutage, exhaust duct, garbage pipe and distribution pipeline, pipe joint is equipped with in described steel work deckle board side.
2. the floor that is preinstalled with pipeline according to claim 1, it is characterized in that: described pipeline interface comprises built-in pipe, enclosing cover, inner seat, extension tube attached, described built-in pipe is cylindric, in floor, adopts anti-cement sealing between described built-in pipe and waterproofing mortar layer, layer of concrete in advance; The top of described built-in pipe is provided with enclosing cover and inner seat, in the middle of described enclosing cover, has circular hole, and surrounding is established downward edge; Described inner seat is hollow peviform structure, and between enclosing cover and built-in pipe, its underpart and built-in pipe join, and its upper end is connected with enclosing cover by encapsulant; Described extension tube attached is arranged in the circular hole in the middle of enclosing cover, and is tightly connected by fluid sealant and enclosing cover, and described enclosing cover is positioned on floor.
CN201310439481.1A 2013-09-25 2013-09-25 Floor slab with preinstalled pipelines Pending CN103498525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310439481.1A CN103498525A (en) 2013-09-25 2013-09-25 Floor slab with preinstalled pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310439481.1A CN103498525A (en) 2013-09-25 2013-09-25 Floor slab with preinstalled pipelines

Publications (1)

Publication Number Publication Date
CN103498525A true CN103498525A (en) 2014-01-08

Family

ID=49863775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310439481.1A Pending CN103498525A (en) 2013-09-25 2013-09-25 Floor slab with preinstalled pipelines

Country Status (1)

Country Link
CN (1) CN103498525A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015043310A1 (en) * 2013-09-25 2015-04-02 张跃 Floorslab system
CN110821022A (en) * 2019-11-28 2020-02-21 怀化远大建筑工业有限公司 Full-prefabricated high-strength PC floor in steel construction that can install fast

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6536168B1 (en) * 2000-06-15 2003-03-25 San Donato Llc Apparatus and methods for moldable and customizable structures
CN101225910A (en) * 2008-02-01 2008-07-23 杨选金 Building pipe built-in joint
CN201512887U (en) * 2009-09-18 2010-06-23 张跃 Building floor slab
CN202430814U (en) * 2011-12-13 2012-09-12 蒋干注 Embedded pipe joint
CN202706297U (en) * 2012-05-30 2013-01-30 远大可建科技有限公司 Floorslab with prefabricated water and electricity components
CN102900189A (en) * 2012-09-28 2013-01-30 山东鲁帆集团有限公司 Modularized floor slab for buildings
CN203010028U (en) * 2012-11-28 2013-06-19 深圳市鹏城建筑集团有限公司 Sleeve for embedding floorslab penetrating pipeline in floorslab

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6536168B1 (en) * 2000-06-15 2003-03-25 San Donato Llc Apparatus and methods for moldable and customizable structures
CN101225910A (en) * 2008-02-01 2008-07-23 杨选金 Building pipe built-in joint
CN201512887U (en) * 2009-09-18 2010-06-23 张跃 Building floor slab
CN202430814U (en) * 2011-12-13 2012-09-12 蒋干注 Embedded pipe joint
CN202706297U (en) * 2012-05-30 2013-01-30 远大可建科技有限公司 Floorslab with prefabricated water and electricity components
CN102900189A (en) * 2012-09-28 2013-01-30 山东鲁帆集团有限公司 Modularized floor slab for buildings
CN203010028U (en) * 2012-11-28 2013-06-19 深圳市鹏城建筑集团有限公司 Sleeve for embedding floorslab penetrating pipeline in floorslab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015043310A1 (en) * 2013-09-25 2015-04-02 张跃 Floorslab system
CN110821022A (en) * 2019-11-28 2020-02-21 怀化远大建筑工业有限公司 Full-prefabricated high-strength PC floor in steel construction that can install fast

Similar Documents

Publication Publication Date Title
CN103498523B (en) Floor system
CN205444458U (en) Integrated assembled steel construction building
CN205530344U (en) Utility tunnel is pour to split type no mould
CN105780808A (en) Assembly type precast comprehensive pipe gallery
CN105369978A (en) Modularized inner partition board
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN204492042U (en) A kind of low noise steel structure stairway
CN109667376B (en) Novel superposed floor system suitable for H-shaped steel beam of steel structure and construction method thereof
CN103498525A (en) Floor slab with preinstalled pipelines
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN210423992U (en) Building pipe for building water supply and drainage pipeline
CN211037598U (en) Roofing photovoltaic support
CN104455757A (en) Downcomer assembly and installation method thereof
CN206429790U (en) A kind of buried gas pipeline branch box
CN206123542U (en) Erection equipment is connected to socket joint pipeline
CN201099930Y (en) Collapsible type purifying partition wall
CN204420338U (en) Laboratory universal pipes through-flooring pre-embedded device
CN204356962U (en) A kind of prefabricated bathroom floor
CN210288621U (en) Sewage pipeline plugging device
KR200473612Y1 (en) deck plate with channel connection part
CN203213319U (en) Water stopping steel plate fixing device in building construction
CN203145122U (en) Drain pipe pre-embedding base
CN207160361U (en) Steel bar truss floor support plate and combination floor support plate
CN110593362A (en) Assembly type building pipeline embedded part
CN203429878U (en) Steel-structure floor board prefabricated in factory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140108