CN204205418U - A kind of bracing wire Rapid manufacturing device of high - Google Patents
A kind of bracing wire Rapid manufacturing device of high Download PDFInfo
- Publication number
- CN204205418U CN204205418U CN201420652095.0U CN201420652095U CN204205418U CN 204205418 U CN204205418 U CN 204205418U CN 201420652095 U CN201420652095 U CN 201420652095U CN 204205418 U CN204205418 U CN 204205418U
- Authority
- CN
- China
- Prior art keywords
- guide rails
- block
- fixed
- shaped plate
- rotating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
一种拉线快速制作装置,涉及一种拉线连接辅助工具,旋转杆(2)的下端活动连接定位块(3),在旋转杆的上端设有旋拧锁紧手柄(1),两导轨(15)上端间隔固定在定位块的下部面两侧,在两导轨中部设有活动块(6),固定块(13)固定在两导轨的下端,在活动块、固定块的一侧分别设有“F”形板(8),两锁紧螺丝(7)分别穿过“F”形板外侧设置的螺孔(14)后对应“F”形板的卡槽(9),旋转杆下端的丝杠(11)处于在两导轨之间并与活动块中部设置的螺孔活动连接;本实用新型利用固定块的卡槽夹持地埋拉线,由活动块的卡槽夹持杆上拉线,通过旋拧锁紧手柄和丝杠使安装连接花兰的地埋拉线和杆上拉线拉紧。
A fast pulling wire production device, which relates to a pulling wire connection auxiliary tool, the lower end of a rotating rod (2) is movably connected to a positioning block (3), and the upper end of the rotating rod is provided with a twisting and locking handle (1), two guide rails (15 ) upper ends are fixed on both sides of the lower surface of the positioning block at intervals, a movable block (6) is arranged in the middle of the two guide rails, a fixed block (13) is fixed at the lower end of the two guide rails, and " F”-shaped plate (8), two locking screws (7) pass through the screw holes (14) on the outside of the “F”-shaped plate respectively, and then correspond to the slots (9) of the “F”-shaped plate, and the screws at the lower end of the rotating rod The bar (11) is located between the two guide rails and is movably connected with the screw hole provided in the middle of the movable block; Twist the locking handle and the lead screw to tighten the buried stay wire and the stay wire on the pole that are installed and connected to the turnbuckle.
Description
技术领域 technical field
本实用新型涉及一种拉线连接辅助工具,尤其是涉及一种拉线快速制作装置。 The utility model relates to an auxiliary tool for pulling wire connection, in particular to a fast making device for pulling wires.
背景技术 Background technique
公知的,在电线杆上通常要设置拉线保持电线杆的稳定,拉线的主要作用是平衡荷载,避免线路受大风荷载的破坏影响出现电线杆侧歪或倒伏,因此在终端杆、转角杆、T接杆、大档距跨越杆等处使用较多,在拉线的地埋部分和电线杆拉线部分需要使用两端具有花兰螺杆的长圆杆上进行连接,以便确保拉线不会松弛,但是现有的两端具有花兰螺杆的长圆杆连接都是通过人工连接,拉线不能够拉直,尤其是杆上拉线和地埋拉线的连接端松弛问题得不到克服。 It is known that a stay wire is usually installed on the utility pole to maintain the stability of the utility pole. The main function of the stay wire is to balance the load and prevent the line from being sideways or falling due to the damage of the strong wind load. Therefore, the terminal pole, corner pole, T The extension rods, large-gap spanning rods, etc. are often used. The buried part of the cable and the cable part of the utility pole need to be connected on a long round rod with turnbuckle screws at both ends to ensure that the cable will not be loose. However, the existing The connection of the long round rods with turnbuckle screws at both ends is manually connected, and the backguy cannot be straightened, especially the loosening problem of the connection ends of the backguy on the rod and the buried backguy cannot be overcome.
发明内容 Contents of the invention
为了克服背景技术中的不足,本实用新型公开了一种拉线快速制作装置,利用固定块的卡槽夹持地埋拉线,由活动块的卡槽夹持杆上拉线,通过旋拧锁紧手柄和丝杠使安装连接花兰的地埋拉线和杆上拉线拉紧。 In order to overcome the deficiencies in the background technology, the utility model discloses a fast production device for pull wires, which uses the slot of the fixed block to clamp the buried pull wire, and pulls the wire by the clamp rod of the slot of the movable block, and locks the handle by twisting And the lead screw makes the installation and connection of the flower orchid buried stay wire and the stay wire on the rod tensioned.
为实现上述实用新型目的,本实用新型采用如下技术方案: For realizing above-mentioned utility model purpose, the utility model adopts following technical scheme:
一种拉线快速制作装置,包括定位块、旋拧锁紧手柄、丝杠、导轨、活动块、固定块、“F”形板和锁紧螺丝,旋转杆的下端活动连接定位块,在旋转杆的上端设有旋拧锁紧手柄,两导轨上端间隔固定在定位块的下部面两侧,在两导轨中部设有活动块,固定块固定在两导轨的下端,在活动块、固定块的一侧分别设有“F”形板,两锁紧螺丝分别穿过“F”形板外侧设置的螺孔后对应“F”形板的卡槽,旋转杆下端的丝杠处于在两导轨之间并与活动块中部设置的螺孔活动连接。 A pull wire rapid production device, including a positioning block, a twist and lock handle, a screw, a guide rail, a movable block, a fixed block, an "F" shaped plate and a locking screw, the lower end of the rotating rod is movably connected to the positioning block, and the rotating rod is connected to the positioning block. The upper end of the two guide rails is provided with a screw lock handle, and the upper ends of the two guide rails are fixed on both sides of the lower surface of the positioning block at intervals. There is a movable block in the middle of the two guide rails, and the fixed block is fixed at the lower end of the two guide rails. There are "F"-shaped plates on the sides, and the two locking screws pass through the screw holes on the outside of the "F"-shaped plate and correspond to the slots of the "F"-shaped plate. The screw at the lower end of the rotating rod is between the two guide rails. And be movably connected with the screw hole provided in the middle part of the movable block.
所述的拉线快速制作装置,在活动块的靠近两侧处分别设有套管,两套管活动套在两导轨的中部。 In the fast production device for pull wires, sleeves are respectively provided on both sides of the movable block, and the two sleeves are movably sleeved in the middle of the two guide rails.
所述的拉线快速制作装置,固定块的靠近两侧处分别套在两导轨的下端并通过螺母固定。 In the above-mentioned rapid production device for the stay wire, the two sides of the fixed block are respectively sleeved on the lower ends of the two guide rails and fixed by nuts.
由于采用了上述技术方案,本实用新型具有如下有益效果: Due to the above-mentioned technical scheme, the utility model has the following beneficial effects:
本实用新型所述拉线快速制作装置,利用固定块的卡槽夹持地埋拉线,由活动块的卡槽夹持杆上拉线,通过旋拧锁紧手柄和丝杠使安装连接花兰的地埋拉线和杆上拉线拉紧;本实用新型结构简单,可以有效地防范连接花兰不紧带来的拉线松弛现象的发生。 The pull wire rapid production device described in the utility model uses the slot of the fixed block to clamp the buried guy wire, and pulls the wire from the clamp rod of the slot of the movable block. Buried guy wires and rod-mounted guy wires are tightened; the utility model has a simple structure and can effectively prevent the slackness of the guy wires caused by the loose connection of the flower orchids.
附图说明 Description of drawings
图1是本实用新型的使用状态结构示意图。 Fig. 1 is a schematic diagram of the structure of the utility model in use.
图2是本实用新型的结构示意图。 Fig. 2 is a structural representation of the utility model.
图中:1、旋拧锁紧手柄;2、旋转杆;3、定位块;4、杆上拉线;5、套管;6、活动块;7、锁紧螺丝;8、“F”形板;9、卡槽;10、连接花兰;11、丝杠;12、地埋拉线;13、固定块;14、螺孔;15、导轨。 In the figure: 1. Twist the locking handle; 2. Rotating rod; 3. Positioning block; 4. Pull wire on the rod; 5. Sleeve; 6. Movable block; 7. Locking screw; 8. "F" shaped plate ;9, card slot; 10, connecting turnbuckle; 11, lead screw; 12, buried cable; 13, fixed block; 14, screw hole; 15, guide rail.
具体实施方式 Detailed ways
通过下面的实施例可以更详细的解释本实用新型,本实用新型并不局限于下面的实施例,公开本实用新型的目的旨在保护本实用新型范围内的一切变化和改进; The utility model can be explained in more detail by the following examples, the utility model is not limited to the following examples, the purpose of disclosing the utility model is intended to protect all changes and improvements within the scope of the utility model;
结合附图1或2中所述的拉线快速制作装置,包括定位块3、旋拧锁紧手柄1、丝杠11、导轨15、活动块6、固定块13、“F”形板8和锁紧螺丝7,旋转杆2的下端活动连接定位块3,在旋转杆2的上端设有旋拧锁紧手柄1,两导轨15上端间隔固定在定位块3的下部面两侧,在活动块6的靠近两侧处分别设有套管5,两套管5活动套在两导轨15的中部,固定块13固定在两导轨15的下端,固定块13的靠近两侧处分别套在两导轨15的下端并通过螺母固定,在活动块6、固定块13的一侧分别设有“F”形板8,两锁紧螺丝7分别穿过“F”形板8外侧设置的螺孔14后对应“F”形板8的卡槽9,旋转杆2下端的丝杠11处于在两导轨15之间并与活动块6中部设置的螺孔活动连接。 In combination with the pull wire rapid production device described in Figure 1 or 2, it includes a positioning block 3, a twist and lock handle 1, a lead screw 11, a guide rail 15, a movable block 6, a fixed block 13, an "F" shaped plate 8 and a lock Tighten the screw 7, the lower end of the rotating rod 2 is movably connected to the positioning block 3, and the upper end of the rotating rod 2 is provided with a screw locking handle 1, and the upper ends of the two guide rails 15 are fixed on both sides of the lower surface of the positioning block 3 at intervals. Sleeves 5 are respectively provided near the two sides of the two guide rails 15, and the two sleeves 5 are movable in the middle of the two guide rails 15. The fixed block 13 is fixed on the lower end of the two guide rails 15. The lower end of the lower end is fixed by a nut, and an "F"-shaped plate 8 is respectively provided on one side of the movable block 6 and the fixed block 13, and the two locking screws 7 respectively pass through the screw holes 14 provided on the outside of the "F"-shaped plate 8 to correspond to The draw-in groove 9 of the "F" shaped plate 8, the leading screw 11 at the lower end of the rotating rod 2 is between the two guide rails 15 and is movably connected with the screw hole provided at the middle part of the movable block 6 .
实施本实用新型所述拉线快速制作装置,使用时先将杆上拉线4的上端通过抱箍固定在电线杆上部,然后将连接花兰10固定在杆上拉线4的下端,将地埋拉线12的下端固定在地埋装置上,所述地埋拉线12的上端固定在连接花兰10上,将杆上拉线4的下部放在本实用新型活动块6“F”形板8的卡槽9中,使用锁紧螺丝7锁紧所述杆上拉线4的下部, 将地埋拉线12的上部放在本实用新型固定块13 “F”形板8的卡槽9中,使用锁紧螺丝7锁紧所述地埋拉线12的上部,然后使用旋拧锁紧手柄1使丝杠11旋转,同时使杆上拉线4与地埋拉线12拉紧,使杆上拉线4和地埋拉线12与连接花兰10的连接端拉紧,迫使杆上拉线4和地埋拉线12与连接花兰10的连接端定型,然后旋拧连接花兰10便可。 Implement the fast production device for the guy wires described in the utility model. When in use, first fix the upper end of the guy wires 4 on the pole to the upper part of the utility pole through the hoop, then fix the connecting flower orchid 10 on the lower end of the guy wires 4 on the pole, and then bury the guy wires 12 The lower end of the rod is fixed on the buried device, the upper end of the buried stay wire 12 is fixed on the connection flower 10, and the lower part of the stay wire 4 on the rod is placed in the slot 9 of the "F" shaped plate 8 of the movable block 6 of the utility model. , use the locking screw 7 to lock the lower part of the stay wire 4 on the rod, place the upper part of the buried stay wire 12 in the slot 9 of the "F" shaped plate 8 of the fixed block 13 of the present utility model, and use the locking screw 7 Lock the upper part of the buried guy wire 12, then use the screw lock handle 1 to rotate the lead screw 11, and at the same time make the rod upper guy wire 4 and the buried guy wire 12 tighten, so that the rod upper guy wire 4 and the buried guy wire 12 are aligned with each other. Tighten the connecting end connecting the turnbuckle 10 to force the stay wire 4 on the pole and the buried stay wire 12 to be finalized with the connecting end connecting the turnbuckle 10, and then screw and connect the turnbuckle 10.
本实用新型未详述部分为现有技术。 The unspecified part of the utility model is prior art.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420652095.0U CN204205418U (en) | 2014-11-05 | 2014-11-05 | A kind of bracing wire Rapid manufacturing device of high |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420652095.0U CN204205418U (en) | 2014-11-05 | 2014-11-05 | A kind of bracing wire Rapid manufacturing device of high |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204205418U true CN204205418U (en) | 2015-03-11 |
Family
ID=52663338
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420652095.0U Expired - Fee Related CN204205418U (en) | 2014-11-05 | 2014-11-05 | A kind of bracing wire Rapid manufacturing device of high |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204205418U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105239818A (en) * | 2015-10-30 | 2016-01-13 | 国网山东省电力公司东营供电公司 | Telegraph pole stay wire fastening cylinder |
| CN110586808A (en) * | 2019-10-18 | 2019-12-20 | 国家电网有限公司 | Electric power steel strand wires processor that acts as go-between |
-
2014
- 2014-11-05 CN CN201420652095.0U patent/CN204205418U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105239818A (en) * | 2015-10-30 | 2016-01-13 | 国网山东省电力公司东营供电公司 | Telegraph pole stay wire fastening cylinder |
| CN110586808A (en) * | 2019-10-18 | 2019-12-20 | 国家电网有限公司 | Electric power steel strand wires processor that acts as go-between |
| CN110586808B (en) * | 2019-10-18 | 2024-09-13 | 国家电网有限公司 | A kind of electric steel strand wire drawing machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206023064U (en) | A kind of Portable conducting wire fixing-line device operates rod | |
| CN204205418U (en) | A kind of bracing wire Rapid manufacturing device of high | |
| CN101378153B (en) | Ground wire diverter | |
| CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
| CN101931195B (en) | Turn buckle typed steplessly adjustable phase-to-phase spacer bracket | |
| CN204793847U (en) | Frame is strideed across to portable unwrapping wire | |
| CN204030026U (en) | Gravity self-locking formula Anti-dropping earthing clip | |
| CN203251021U (en) | Pay-off trolley clamping device | |
| CN205921107U (en) | Electric line earth connection wire end hawk hook -type chuck | |
| CN103601033B (en) | Cluster line squarer | |
| CN104348111A (en) | Lead backup protection device for live replacement of tension insulator string, and mounting method thereof | |
| CN204167793U (en) | Straight line steel tube tower side, double loop cross-arm jig | |
| CN103683098A (en) | Method of replacing strain poles without laying down lines | |
| CN203826853U (en) | Exterior angle paying-off tackle for straight line angle pole of distribution line | |
| CN204143774U (en) | Electric power steel pipe tower signboard fixing device | |
| CN203456795U (en) | Conductor-side link plate clamping tool for replacing four-split conductor duplex strain insulator string | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN202059099U (en) | Double-string tension insulator wire-tightening hook | |
| CN203352055U (en) | Electric pole grounding downlead lifting apparatus | |
| CN203871746U (en) | Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line | |
| CN204782200U (en) | A adjustable high pressure vacuum circuit breaker support for steel pipe tower | |
| CN205811428U (en) | Tightener and handle apparatus thereof | |
| CN105449582A (en) | Square connecting plate fixture, double-string tension insulator replacing device and method | |
| CN204144862U (en) | The shunting wire clamp that earth potential is installed can be adopted | |
| CN206432624U (en) | Transmission line tangent tower first insulator changes instrument |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20151105 |
|
| EXPY | Termination of patent right or utility model |