CN204199655U - Overturn-preventing can turnover tool formula elevator hoistway construction platform - Google Patents

Overturn-preventing can turnover tool formula elevator hoistway construction platform Download PDF

Info

Publication number
CN204199655U
CN204199655U CN201420644525.4U CN201420644525U CN204199655U CN 204199655 U CN204199655 U CN 204199655U CN 201420644525 U CN201420644525 U CN 201420644525U CN 204199655 U CN204199655 U CN 204199655U
Authority
CN
China
Prior art keywords
overturn
preventing
wall
iron
thick stick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420644525.4U
Other languages
Chinese (zh)
Inventor
王振兴
王卫新
曾辉
许龙迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd filed Critical BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority to CN201420644525.4U priority Critical patent/CN204199655U/en
Application granted granted Critical
Publication of CN204199655U publication Critical patent/CN204199655U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to a kind of overturn-preventing can turnover tool formula elevator hoistway construction platform, inserts thick stick and steel operation platform plate formed by body of wall i iron.On steel frame inner rim, corresponding inserting on position that solid four body of wall i iron on lift well body of wall wall in four hole slots insert thick stick is provided with fixed card slot, the fixing card of overturn-preventing is in door type, the checkpost, two ends that overturn-preventing fixes card is located at the both sides that thick stick inserted by corresponding body of wall i iron, the top that overturn-preventing fixes card fixes in the fixed card slot on the steel frame of correspondence, steel frame is equipped with steel operation platform plate.It is simple that the utility model has structure, reasonable in design, easy construction and speed fast, save labor material-saving, and safety is good, and material is few and can have enough to meet the need the advantage of use.

Description

Overturn-preventing can turnover tool formula elevator hoistway construction platform
Technical field
The utility model belongs to a kind of overturn-preventing can turnover tool formula elevator hoistway construction platform.
Background technology
At present, in elevator shaft structure construction, as lift-mounting equipment, assembling reinforcement, install template etc., mainly rely in elevator shaft and set up design of coupler scaffold as construction operation platform from bottom to top, design of coupler scaffold is set up to scope of operation height, the thick wood ribbon of 5cm is completely spread again as operation platform, so that constructor carries out construction operation etc. thereon, after this layer of operation completes on scaffold.Again scaffold is continued upwards to set up, carry out the construction of last layer.After structure construction completes, then the design of coupler scaffold in elevator shaft is carried out dismounting outward transport from top to bottom.There is construction trouble in this kind of method of operating, speed of application is slow, takes the manpower and material of tearing at substantial open, and turnover material takies cycle long, poor stability, and material is many and can not have enough to meet the need the problems such as use.
Summary of the invention
The purpose of this utility model is that a kind of overturn-preventing of design can turnover tool formula elevator hoistway construction platform, has structure simple, reasonable in design, easy construction and speed fast, save labor material-saving, and safety is good, and material is few and can have enough to meet the need the advantage of use.
For this reason, the utility model inserts thick stick by body of wall i iron and steel operation platform plate formed.On steel frame inner rim, corresponding inserting on position that solid four body of wall i iron on lift well body of wall wall in four hole slots insert thick stick is provided with fixed card slot, the fixing card of overturn-preventing is in door type, the checkpost, two ends that overturn-preventing fixes card is located at the both sides that thick stick inserted by corresponding body of wall i iron, the top that overturn-preventing fixes card fixes in the fixed card slot on the steel frame of correspondence, steel frame is equipped with steel operation platform plate.The ratio that the width of thick stick inserted by the described overturn-preventing spacing of fixing two inner limits of card and i iron is 1: 0.9 ~ 0.95.
Said structure design achieves the purpose of this utility model.
It is simple that the utility model has structure, reasonable in design, easy construction and speed fast, save labor material-saving, and safety is good, and material is few and can have enough to meet the need the advantage of use.
Accompanying drawing explanation
Fig. 1 is the structural representation that overturn-preventing of the present utility model fixes card.
Fig. 2 is the structural representation of steel frame of the present utility model.
Structural representation when Fig. 3 is using state of the present utility model.
Detailed description of the invention
As shown in Figure 1 to Figure 3, a kind of overturn-preventing can turnover tool formula elevator hoistway construction platform, inserts thick stick 4 and steel operation platform plate 6 formed by body of wall i iron.On steel frame 2 inner rim, corresponding inserting on position that solid four body of wall i iron on lift well body of wall wall 5 in four hole slots insert thick stick is provided with fixed card slot 3.Overturn-preventing fixes card 1 in door type.The checkpost, two ends that overturn-preventing fixes card is located at the both sides that thick stick inserted by corresponding body of wall i iron.The top that overturn-preventing fixes card fixes in the fixed card slot on the steel frame of correspondence.Steel frame is equipped with steel operation platform plate 6.Steel operation platform plate is the thick checkered steel plate of 6mm.The ratio that the width of thick stick inserted by the described overturn-preventing spacing of fixing two inner limits of card and i iron is 1: 0.9 ~ 0.95.
During body of wall casting steel concrete, the correspondence position reserved opening of first lift well body of wall wall, dimension of opening 120mm × 160mm, after wall form is removed, during construction, the one end of body of wall i iron being inserted thick stick is inserted in hole to be provided fixing, and the few portion of the other end that thick stick inserted by body of wall i iron exposes in lift well.Again steel frame is steadily dropped down onto the upper end that thick stick inserted by body of wall i iron, again fixing for overturn-preventing card (is welded in " door " font with 50mm × 50mm × 3mm angle steel, interior clear distance 120mm × 160mm) checkpost, two ends be located at the both sides that thick stick inserted by corresponding body of wall i iron, the top card that overturn-preventing fixes card is then in solid fixed card slot on the steel frame of correspondence, can effectively prevent and limit steel frame and insert at body of wall i iron and thick stick moves and topples.Steel frame is equipped with steel operation platform plate again, can constructs thereon.The construction of this layer is complete can conveniently remove, and uses tower crane the utility model transfer to be mounted in next scope of operation.
In a word, it is simple that the utility model has structure, reasonable in design, easy construction and speed fast, save labor material-saving, and safety is good, and material is few and can have enough to meet the need the advantage of use.Can promote the use of.

Claims (2)

1. an overturn-preventing can turnover tool formula elevator hoistway construction platform, thick stick is inserted and steel operation platform plate formed by body of wall i iron, it is characterized in that: on steel frame inner rim, corresponding inserting on position that solid four body of wall i iron on lift well body of wall wall in four hole slots insert thick stick is provided with fixed card slot, the fixing card of overturn-preventing is in door type, the checkpost, two ends that overturn-preventing fixes card is located at the both sides that thick stick inserted by corresponding body of wall i iron, the top that overturn-preventing fixes card fixes in the fixed card slot on the steel frame of correspondence, steel frame is equipped with steel operation platform plate.
2. can turnover tool formula elevator hoistway construction platform by overturn-preventing according to claim 1, it is characterized in that: the ratio that the width of thick stick inserted by the described overturn-preventing spacing of fixing two inner limits of card and i iron is 1: 0.9 ~ 0.95.
CN201420644525.4U 2014-11-03 2014-11-03 Overturn-preventing can turnover tool formula elevator hoistway construction platform Active CN204199655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420644525.4U CN204199655U (en) 2014-11-03 2014-11-03 Overturn-preventing can turnover tool formula elevator hoistway construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420644525.4U CN204199655U (en) 2014-11-03 2014-11-03 Overturn-preventing can turnover tool formula elevator hoistway construction platform

Publications (1)

Publication Number Publication Date
CN204199655U true CN204199655U (en) 2015-03-11

Family

ID=52657627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420644525.4U Active CN204199655U (en) 2014-11-03 2014-11-03 Overturn-preventing can turnover tool formula elevator hoistway construction platform

Country Status (1)

Country Link
CN (1) CN204199655U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223594A (en) * 2016-09-22 2016-12-14 中建八局第四建设有限公司 A kind of Core Walls Structure shaped steel integrated construction platform
CN106760463A (en) * 2016-12-30 2017-05-31 上海建工七建集团有限公司 Tool operating platform and vertical shaft wall construction method for building vertical shaft wall by laying bricks or stones

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223594A (en) * 2016-09-22 2016-12-14 中建八局第四建设有限公司 A kind of Core Walls Structure shaped steel integrated construction platform
CN106760463A (en) * 2016-12-30 2017-05-31 上海建工七建集团有限公司 Tool operating platform and vertical shaft wall construction method for building vertical shaft wall by laying bricks or stones
CN106760463B (en) * 2016-12-30 2019-02-22 上海建工七建集团有限公司 For building the tool operating platform and vertical shaft wall construction method of vertical shaft wall

Similar Documents

Publication Publication Date Title
CN204199655U (en) Overturn-preventing can turnover tool formula elevator hoistway construction platform
CN105569333A (en) Construction formwork of cantilever layer outer wall preformed hole, and construction method
CN203320425U (en) Cast-in-situ box girder construction apparatus with slidingly movable side mold
CN202882376U (en) Elevator shaft template support platform
CN202560241U (en) Molding shield tunnel top duct sheet dismantling device
CN201625859U (en) Locomotive gearbox assembly and disassembly service cart
CN203394032U (en) Inside-cylinder climb-type operation frame
CN202671108U (en) Anti-falling horizontal hydraulic jack
CN107953763A (en) A kind of battery installation structure of electric car
CN206468009U (en) A kind of form for construction engineering
CN201962597U (en) Movable trestle bridge with suspension arm device
CN204726453U (en) A kind of inclined shaft lane skip bucket Obstruct apparatus
CN204126237U (en) A kind of elevator hoistway construction platform
CN203050066U (en) Movable full-space supporting frame
CN204370564U (en) Underfloor constructional column concrete pouring structure
CN203542808U (en) Strongly-magnetic connecting device for steel template
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN205557315U (en) Pier cap top temporary support
CN202717466U (en) Safety pin used for passenger lift maintenance
CN205906891U (en) Steel construction integration elevator is with car of fleing
CN206205445U (en) A kind of template connects handle
CN204898708U (en) Assembled steel construction conversion layer of tower crane
CN204571295U (en) A kind of structure improving aluminum alloy mould plate opposing side bearing capacity
CN204899222U (en) Side wall formworking jumbo universal wheel running gear
CN204590625U (en) A kind of releasing box for aluminum alloy mould plate system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant