CN204199295U - A kind of device for A/C in antiseepage wall chase section casting process - Google Patents

A kind of device for A/C in antiseepage wall chase section casting process Download PDF

Info

Publication number
CN204199295U
CN204199295U CN201420597564.3U CN201420597564U CN204199295U CN 204199295 U CN204199295 U CN 204199295U CN 201420597564 U CN201420597564 U CN 201420597564U CN 204199295 U CN204199295 U CN 204199295U
Authority
CN
China
Prior art keywords
derrick
clamping plate
wall chase
conduit
chase section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420597564.3U
Other languages
Chinese (zh)
Inventor
周昌茂
张玉莉
邬美富
欧阳小平
耿云辉
梁新柱
高聪颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN201420597564.3U priority Critical patent/CN204199295U/en
Application granted granted Critical
Publication of CN204199295U publication Critical patent/CN204199295U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Comprise a derrick for the device of A/C in antiseepage wall chase section casting process, be located at the hold assembly on derrick; Hold assembly comprises symmetrically arranged two pieces of clamping plate, clamping plate one end is actively socketed on derrick by latch, the other end is provided with semicircle opening, the semicircle opening of two pieces of clamping plate can be spliced into a concentric circles, concentric circles diameter is greater than catheter outer diameter, is less than pipe joint overstriking position external diameter, clamping plate are provided with driving shaft, drive driving shaft that clamping plate can be driven to take latch as axle turn.The utility model has the advantage of, the Seepage of the dark large antiseepage wall chase section of the degree of depth more than 100 meters can be applicable to.

Description

A kind of device for A/C in antiseepage wall chase section casting process
Technical field
The device and method of A/C when the utility model relates to a kind of antiseepage wall chase section underwater concreting, when being specially adapted to ultra-deep antiseepage wall chase section underwater concreting, conduit is fixing.
Background technology
When carrying out antiseepage wall chase section underwater concreting, the device of A/C is first installed before groove section to be built, the dividing into of conduit, to rise and to pull out and concreting.The device of tradition A/C is made up of large derrick and little derrick.Large derrick adopts No. 10 channel-section steels to be welded, and in groined type, little derrick adopts 5 bugle steel to be welded, and in U-shaped, interior sky is more bigger than the external diameter of conduit.Carry out groove section concrete when building, first large derrick is placed on groove section and leads on wall, then divide into along large derrick interstitial hole sky, rise and pull out conduit; When needing A/C, inserted along pipe joint place by little derrick, be placed on large derrick, conduit just can be fixed on large and small derrick, completes the installation of concreting and conduit, dismantlement work.At present, the one-tenth groove depth of antiseepage wall chase section is more than 100m, because slotted eye is darker, carry out groove section concrete when building, divide into, to work the conduit that pulls out not only long but also weigh, the concreting time is more and more longer, adopts traditional large and small derrick A/C, has the following disadvantages: (1) complicated construction technique; (2) be difficult to the load bearing conduit and pipe inner concrete, stressedly easily deform afterwards, underwater concreting needs can not be met.
Utility model content
In order to overcome the deficiency that conventional apparatus is fixed conduit, technical problem to be solved in the utility model is to provide a kind of novel catheter anchoring system and method, meets the antiseepage wall chase section underwater concreting construction needs of the degree of depth more than 100 meters.
The technical scheme that the utility model adopts: a kind ofly comprise derrick for the device of A/C in antiseepage wall chase section casting process, is located at the hold assembly on derrick;
Hold assembly comprises symmetrically arranged two pieces of clamping plate, clamping plate one end is actively socketed on derrick by latch, the other end is provided with semicircle opening, the semicircle opening of two pieces of clamping plate can be spliced into a concentric circles, concentric circles diameter is greater than catheter outer diameter, is less than pipe joint overstriking position external diameter, clamping plate are provided with driving shaft, drive driving shaft that clamping plate can be driven to take latch as axle turn.
Further, a kind ofly also comprise locating rack for the device of A/C in antiseepage wall chase section casting process, derrick is located on locating rack, and locating rack lower end is provided with backstay, and upper end is provided with connector.
All right, backstay is provided with side guide.
A kind of method being fixed conduit for A/C device in antiseepage wall chase section casting process comprise device location-under manage-build-carry pipe;
1) device location, after antiseepage wall chase section excavation is shaping, before during underwater concreting, is first placed on antiseepage wall chase section outside or inside to be built, derrick is fixed by the device of A/C;
2) manage under, by driving driving shaft, two clamping plate on derrick 1 are reversely rotated, by crane or rig, conduit interior empty merogenesis in the middle of derrick is transferred, when needing spreading conduit, driving driving shaft makes the clamping plate opposite direction rotating above derrick, make the pipe joint overstriking position putting into antiseepage wall chase section block on the concentric circles of two fish-plate splice, the conduit outside antiseepage wall chase section is spliced in the pipe joint on derrick;
3) build, after conduit is transferred and is put in place, two pieces of clamping plate opposite direction rotatings above derrick are made by driving driving shaft, pipe joint overstriking position is made to be stuck in the concentric circles of two pieces of fish-plate splice, conduit mouth outside antiseepage wall chase section installs bearing material bucket, carries out underwater concreting by bearing material bucket to antiseepage wall chase section;
4) pipe is carried, when antiseepage wall chase section inner concrete face rises to the degree of depth needing to dismantle conduit, bearing material bucket is unloaded, by driving driving shaft, two clamping plate on derrick are reversely rotated, then upwards promote conduit, when conduit rise to need dismounting position time, then by two clamping plate opposite direction rotatings that driving driving shaft makes on derrick, pipe joint overstriking position will be blocked on the concentric circles of two fish-plate splice, by the conduit dismounting outside antiseepage wall chase section.
Preferably, a kind of method being fixed conduit for A/C device in antiseepage wall chase section casting process comprise device location-under manage-build-carry pipe;
1) device location, after antiseepage wall chase section excavation is shaping, before underwater concreting, first locating rack is put into together with derrick in antiseepage wall chase section to be built, make derrick be fixed in antiseepage wall chase section by locating rack, backstay inserts in antiseepage wall chase section, and connector is outside antiseepage wall chase section;
2) manage under, by driving driving shaft, two clamping plate on derrick 1 are reversely rotated, by crane or rig, conduit interior empty merogenesis in the middle of derrick is transferred, when needing spreading conduit, driving driving shaft makes the clamping plate opposite direction rotating above derrick, make the pipe joint overstriking position putting into antiseepage wall chase section block on the concentric circles of two fish-plate splice, the conduit outside antiseepage wall chase section is spliced in the pipe joint on derrick;
3) build, after conduit is transferred and is put in place, two pieces of clamping plate opposite direction rotatings above derrick are made by driving driving shaft, pipe joint overstriking position is made to be stuck in the concentric circles of two pieces of fish-plate splice, conduit mouth outside antiseepage wall chase section installs bearing material bucket, carries out underwater concreting by bearing material bucket to antiseepage wall chase section;
4) pipe is carried, when antiseepage wall chase section inner concrete face rises to the degree of depth needing to dismantle conduit, bearing material bucket is unloaded, by driving driving shaft, two clamping plate on derrick are reversely rotated, then upwards promote conduit, when conduit rise to need dismounting position time, then by two clamping plate opposite direction rotatings that driving driving shaft makes on derrick, pipe joint overstriking position will be blocked on the concentric circles of two fish-plate splice, by the dismounting of the conduit outside antiseepage wall chase section.
The beneficial effects of the utility model are, a kind of high for the device intensity of A/C in antiseepage wall chase section casting process, the load that can bear conduit and pipe inner concrete is not yielding, meet underwater concreting construction needs, double plate is adopted to rotate clamping pipe joint overstriking portion, its clamp method is simple not easily stuck by conduit, pipe joint overstriking portion is equivalent to be placed on clamping plate, the vibrations that conduit produces in concreting process can not affect the clamping of clamping plate to pipe joint overstriking portion, and the combination of traditional large derrick and little derrick, it is the method adopting large derrick to extrude little derrick, make little derrick be close to conduit outer wall and realize clamping, what utilize is friction between little derrick and conduit outer wall, for the dark large antiseepage wall chase section more than about 100 meters, multiple large derrick and little derrick is adopted to combine, when forming multistage clamping conduit, the vibrations that conduit produces in concreting process can make conduit stuck in little derrick, cause building put in place after conduit cannot be extracted, so adopt large derrick and little derrick to combine can only to be applicable to be less than the antiseepage wall chase section of 60.
Accompanying drawing explanation
Fig. 1 top view of the present utility model.
Fig. 2 front view of the present utility model.
Fig. 3 left view of the present utility model.
Fig. 4 the utility model preferred structure schematic diagram
In figure, derrick 1, clamping plate 2, latch 3, driving shaft 4, locating rack 5, backstay 6, connector 7, side guide 8.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
As shown in Figure 1, Figure 2, in Fig. 3, a kind of when building for antiseepage wall chase section the device of A/C comprise derrick 1, be located at the hold assembly on derrick 1, derrick 1 preferred version adopts two No. 20 i iron mutually to splice and is welded, in groined type in plane, length is that antiseepage wall chase section horizontal spacing adds 40cm, wide 80cm, high 20cm, empty size 40cm × 60cm in groined type;
Hold assembly comprises symmetrically arranged two pieces of clamping plate 2, clamping plate 2 one end is actively socketed on the pin hole on derrick 1 by latch 3, the other end is provided with semicircle opening, two clamping plates is 2-in-1 can be covered empty in derrick 1 together, and a concentric circles is formed in the middle of derrick 1, concentric circles diameter is greater than catheter outer diameter, is less than pipe joint overstriking position external diameter, clamping plate 2 are provided with driving shaft 4, drive driving shaft 4 can drive clamping plate 2 with latch 3 for axle turn
In order to meet the rotary moveable needs of clamping plate 2, diameter 20mm reinforcing bar is preferably adopted to be driving shaft 4 on the both sides of clamping plate 2, the long preferred 40cm of driving shaft 4.
As in Fig. 4, a kind of when building for antiseepage wall chase section the device of A/C also comprise locating rack 5, derrick 1 is located on locating rack 5, and locating rack 5 lower end is provided with backstay 6, and upper end is provided with connector 7, preferably, backstay 6 is also provided with side guide 8.
For the antiseepage wall chase section of the degree of depth at about 90 meters, a kind of method being fixed conduit for A/C device in antiseepage wall chase section casting process comprise device location-under manage-build-carry pipe;
1) device location, after antiseepage wall chase section excavation is shaping, before during underwater concreting, first the derrick 1 of A/C device is placed on antiseepage wall chase section to be built outside, derrick 1 is fixed on bearing capacity and is greater than on the ground of 5MPa, and the planeness that derrick 1 is placed is greater than 0.67cm/m;
2) manage under, by driving driving shaft 4, on derrick 1 two clamping plate 2 are reversely rotated, by crane or rig, conduit interior empty merogenesis in the middle of derrick 1 is transferred, when needing spreading conduit, driving driving shaft 4 makes clamping plate 2 opposite direction rotating above derrick 1, the pipe joint overstriking position making to put into antiseepage wall chase section will be blocked on concentric circles that two clamping plate 2 splice, by the pipe joint of the conduit splicing outside antiseepage wall chase section on derrick 1 (utilizing the platform of derrick 1 to carry out conduit installation);
3) build, as (bottom antiseepage wall chase section about 30cm) after conduit is transferred and put in place, pipe joint place spells pressure testing inspection through examination, and it is qualified, prevent pipe joint place spillage obstruction conduit, two pieces of clamping plate 2 opposite direction rotatings above derrick 1 are made by driving driving shaft 4, pipe joint overstriking position is made to be stuck in the concentric circles of two pieces of clamping plate 2 splicings, conduit mouth outside antiseepage wall chase section installs bearing material bucket, by bearing material bucket, underwater concreting is carried out to antiseepage wall chase section, in order to prevent conduit in beginning concrete perfusion process, conduit swing affect antiseepage wall chase section inwall stablize, beginning quantity can be increased, make concrete by conductor housing buried depth about 1 meter,
4) pipe is carried, when antiseepage wall chase section inner concrete face rises to the degree of depth needing to dismantle conduit, bearing material bucket is unloaded, by driving driving shaft 4, on derrick 1 two clamping plate 2 are reversely rotated, then upwards conduit is promoted, all the time conductor housing is made to be embedded in concrete 2 to 6 meters, prevent antiseepage wall chase section concrete slag inclusion or do not plan a successor, affect impervious wall antiseepage function, when conduit rise to need dismounting position time, two clamping plate 2 opposite direction rotatings on derrick 1 are made again by driving driving shaft 4, pipe joint overstriking position will be blocked on concentric circles that two clamping plate 2 splice, by the conduit dismounting outside antiseepage wall chase section.
Preferably, for the antiseepage wall chase section of the degree of depth more than 100, a kind of method being fixed conduit for A/C device in antiseepage wall chase section casting process comprise device location-under manage-build-carry pipe;
1) device location, after antiseepage wall chase section excavation is shaping, before underwater concreting, locating rack 5 fixes when working by multiple derrick 1(that locating rack 5 be arranged in parallel), locating rack is arranged multiple derrick 1 can increase and catheter contact point, locating rack can accomplish about 20 meters as required, derrick 1 on locating rack 5 can arrange more than six at most, be connected with the driving shaft 4 on clamping plate 2 in advance by guide rod, first locating rack 5 is put into together with derrick 1 in antiseepage wall chase section to be built, derrick 1 is made to be fixed in antiseepage wall chase section by locating rack 5, backstay 6 inserts in antiseepage wall chase section, the side guide 8 on backstay 6 is preferably utilized to extrude inwall in antiseepage wall chase section, locating rack 5 is made to have good stability in antiseepage wall chase section, by locating rack 5 to prevent conduit right left swing when concreting dynamic (when conduit is long, during concreting, conduit can constantly swing, when swinging excessive, will have an impact to antiseepage wall chase section inwall stability), connector 7 is outside antiseepage wall chase section, by fixing or connection connector 7, can fix or lift by crane locating rack 5,
2) manage under, drive driving shaft 4 that on derrick 1 two clamping plate 2 are reversely rotated by guide rod, by crane or rig, conduit interior empty merogenesis in the middle of derrick 1 is transferred, when needing spreading conduit, driving driving shaft 4 makes clamping plate 2 opposite direction rotating above derrick 1, the pipe joint overstriking position making to put into antiseepage wall chase section will be blocked on concentric circles that two clamping plate 2 splice, by the pipe joint of the conduit splicing outside antiseepage wall chase section on derrick 1;
3) build, after conduit is transferred and is put in place, two pieces of clamping plate 2 opposite direction rotatings above derrick 1 are made by driving driving shaft 4, pipe joint overstriking position is made to be stuck in the concentric circles of two pieces of clamping plate 2 splicings, conduit mouth outside antiseepage wall chase section installs bearing material bucket, carries out underwater concreting by bearing material bucket to antiseepage wall chase section;
4) pipe is carried, when antiseepage wall chase section inner concrete face rises to the degree of depth needing to dismantle conduit, bearing material bucket is unloaded, by driving driving shaft 4, on derrick 1 two clamping plate 2 are reversely rotated, then upwards promote conduit, when conduit rise to need dismounting position time, then two clamping plate 2 opposite direction rotatings by driving driving shaft 4 to make on derrick 1, pipe joint overstriking position by blocking on concentric circles that two clamping plate 2 splice, by the dismounting of the conduit outside antiseepage wall chase section.

Claims (3)

1., for a device for A/C in antiseepage wall chase section casting process, it is characterized in that: described device comprises derrick (1), be located at the hold assembly on derrick (1);
Described hold assembly comprises symmetrically arranged two pieces of clamping plate (2), clamping plate (2) one end is actively socketed on derrick (1) by latch (3), the other end is provided with semicircle opening, the semicircle opening of two pieces of clamping plate (2) can be spliced into a concentric circles, concentric circles diameter is greater than catheter outer diameter, is less than pipe joint overstriking position external diameter, clamping plate (2) are provided with driving shaft (4), drive driving shaft (4) can drive clamping plate (2) with latch (3) for axle turn.
2. a kind of device for A/C in antiseepage wall chase section casting process according to claim 1, it is characterized in that: described device also comprises locating rack (5), derrick (1) is located on locating rack (5), locating rack (5) lower end is provided with backstay (6), and upper end is provided with connector (7).
3. a kind of device for A/C in antiseepage wall chase section casting process according to claim 2, is characterized in that: described backstay (6) is provided with side guide (8).
CN201420597564.3U 2014-10-16 2014-10-16 A kind of device for A/C in antiseepage wall chase section casting process Active CN204199295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420597564.3U CN204199295U (en) 2014-10-16 2014-10-16 A kind of device for A/C in antiseepage wall chase section casting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420597564.3U CN204199295U (en) 2014-10-16 2014-10-16 A kind of device for A/C in antiseepage wall chase section casting process

Publications (1)

Publication Number Publication Date
CN204199295U true CN204199295U (en) 2015-03-11

Family

ID=52657270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420597564.3U Active CN204199295U (en) 2014-10-16 2014-10-16 A kind of device for A/C in antiseepage wall chase section casting process

Country Status (1)

Country Link
CN (1) CN204199295U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104278677B (en) * 2014-10-16 2016-01-20 葛洲坝集团基础工程有限公司 A kind of device and method for A/C in antiseepage wall chase section casting process

Similar Documents

Publication Publication Date Title
CN104278677B (en) A kind of device and method for A/C in antiseepage wall chase section casting process
CN104374649A (en) Testing device and method for observing shear deformation failure characteristics between tubular pile and grouting soil body
CN103940968B (en) Test bed device for tunnel excavating and grouting model and application method of device
CN104458428A (en) Large-sized fluid-solid-heat multi-field coupling test loading system
CN206036390U (en) Pipeline rising -falling tone is put by paper -back edition
CN106761774A (en) A kind of push bench process Tunnel Engineering tube coupling stopping device
CN207017270U (en) Land steel-pipe pile Pile feeder
CN204112378U (en) A kind of two casing device of pile measurement with emulation buffer action
CN109137948A (en) Grouting behind shaft or drift lining occlusion water-stopping method and equipment between a kind of stake
CN204199295U (en) A kind of device for A/C in antiseepage wall chase section casting process
CN104196248B (en) Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method
CN108593446B (en) Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method
CN204385727U (en) Spiral grouting preformed pile
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
CN104818995B (en) A kind of method of assembled confined concrete bow member
CN201561729U (en) Concrete pole buried depth measuring device
CN208472763U (en) A kind of rear parados of jacking construction
CN105714825A (en) Core pile guide device suitable for cemented soil core inserting combination pile and core pile guide method
CN206362647U (en) A kind of bulldozing device for being used to take out hollow circuit cylinder soil sample
CN206052798U (en) A kind of model test apparatus suitable for the simulation of bored concrete pile casting process
CN204040499U (en) Steel pipe column vertical locating device is inserted after contrary sequence method
CN107190788A (en) A kind of pile foundation self-balanced static-load testing displacement observation device
CN204356795U (en) A kind of transformer station's pile tube with long vertical grounding electrode
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant