CN204186076U - The efficient construction equipment of mechanical integrated flooring topping - Google Patents

The efficient construction equipment of mechanical integrated flooring topping Download PDF

Info

Publication number
CN204186076U
CN204186076U CN201420655975.3U CN201420655975U CN204186076U CN 204186076 U CN204186076 U CN 204186076U CN 201420655975 U CN201420655975 U CN 201420655975U CN 204186076 U CN204186076 U CN 204186076U
Authority
CN
China
Prior art keywords
conveyer belt
material mouth
sand
stone
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420655975.3U
Other languages
Chinese (zh)
Inventor
李忠
赵海莲
黄明国
黄菊华
黄轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd filed Critical WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201420655975.3U priority Critical patent/CN204186076U/en
Application granted granted Critical
Publication of CN204186076U publication Critical patent/CN204186076U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses the efficient construction equipment of a kind of mechanical integrated flooring topping, it comprise stone material mouth, sand material mouth, cement material mouth, stone conveyer belt, cement transportation band, sand conveyer belt, drum agitator, delivery pump, conveyance conduit, concreting aid, for concrete surface is struck off long darby, be used for concrete surface polishing press polish calender; Described stone material mouth, sand material mouth, cement material mouth are connected with stone conveyer belt, sand conveyer belt, cement transportation band respectively; Described stone conveyer belt, sand conveyer belt, cement transportation band are connected with drum agitator, and the floor of conveyance conduit laying delivered to by the concrete after stirring by drum agitator by delivery pump and conveyance conduit.The construction of use the utility model device does not take tower crane or construction elevator makees vertical transport instrument, decreases the rental charge of equipment; Be pumped directly to every floor construction part, easy construction, safe and reliable, there is good overall economics benefit.

Description

The efficient construction equipment of mechanical integrated flooring topping
Technical field
The utility model belongs to flooring pea gravel concreten packed layer topping technical field of construction, the particularly efficient construction equipment of a kind of mechanical integrated flooring topping.
Background technology
The northern area flooring pea gravel concreten packed layer construction engineering way adopting Terrestrial system more.Traditional flooring pea gravel concreten packed layer is built vertical transport and is adopted tower crane or construction elevator to construct, and plane transportation adopts trolley to carry out haul.Concrete generally adopts the little mixer Site of forced action type.Adopt conventional construction method work efficiency low and trolley is very easy to be formed the steel fabric sheet in geothermal tube and geothermal system destroy, and forced mixer is wayward to the various material mixture ratio of concrete, concrete strength cannot ensure.
Utility model content
The purpose of this utility model is to provide a kind of mechanical integrated flooring topping efficient construction equipment; this apparatus structure is simple, easy to use, uses this device greatly to reduce costs, engineering construction is simplified; easy construction, achieves good economic and social profit.
The technical scheme that the utility model solves the problem is: the efficient construction equipment of mechanical integrated flooring topping, it comprise stone material mouth, sand material mouth, cement material mouth, stone conveyer belt, cement transportation band, sand conveyer belt, drum agitator, delivery pump, conveyance conduit, concreting aid, for concrete surface is struck off long darby, be used for concrete surface polishing press polish calender; Described stone material mouth, sand material mouth, cement material mouth are connected with stone conveyer belt, sand conveyer belt, cement transportation band respectively; Described stone conveyer belt, sand conveyer belt, cement transportation band are connected with drum agitator, and the floor of conveyance conduit laying delivered to by the concrete after stirring by drum agitator by delivery pump and conveyance conduit.
The beneficial effect that the utility model device brings is:
1. use the utility model not take tower crane or construction elevator makees vertical transport instrument, decrease the rental charge of equipment.
2. use the utility model to be pumped directly to every floor construction part, saved operating expenses, saved construction period more than 5 times.
3. adopt this device easy construction, safe and reliable, ensure construction quality, without hand push vehicle over the ground hot pipeline roll destruction, the features such as saving vertical transport instrument, and there is good overall economics benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of the device of the utility model embodiment;
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with embodiment, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the efficient construction equipment of mechanical integrated flooring topping, it comprises stone material mouth 1; sand material mouth 2, cement material mouth 3, stone conveyer belt 4; cement transportation band 5, sand conveyer belt 6, drum agitator 7; delivery pump 8; conveyance conduit 9, concreting pump 11, pump line 12; for the long darby 13 that concrete surface strikes off, for the calender 14 of concrete surface polishing press polish.By raw material sand, cement, stone by stone material mouth 1, sand material mouth 2, cement material mouth 3 blanking, again by stone conveyer belt 4, cement transportation band 5, the running of sand conveyer belt 6 conveyer belt, with the thickness of often kind of material on material thickness measurement card determination material transfer band, thus determine various raw-material consumption.Again various raw material are sent to drum agitator 7 li by conveyer belt to stir, the concrete-agitating time can not lower than 2min, through observation stir and slump controls in 140mm time start to carry out concrete conveyance.After concrete-agitating is complete, start delivery pump 8.Concrete is directly sent to job site by pumping machine pipeline 9.Geothermal tube due to Terrestrial system adopts pipe clamp to be fixed on warming plate 10 below, if ground one-shot forming can because striking off on ground, press polish process time displacement is caused to geothermal tube, even possibly heat pipe warpage is to on ground, thus it is uneven to make underground heat dispel the heat, the heating effect that impact is indoor.Use the concreting pump 11 be connected with pumping machine pipeline 9, two road concrete built by pump line 12: start after first concrete initial set to build second concrete, the concrete thickness duct thickness of building of second is equally thick, now can effectively geothermal tube and gauze wire cloth be fixed.After pea gravel concreten paving, concrete surface strikes off according to body of wall control line and ash cake by the long darby 13 of application, and vibration compacting, surface subside place application pea gravel concreten fill, scrape once with long darby 13 again, then from one end to the other side carry out concrete surface polishing press polish successively with concrete surface polishing calender 14.

Claims (3)

1. the efficient construction equipment of mechanical integrated flooring topping, it comprise stone material mouth, sand material mouth, cement material mouth, stone conveyer belt, cement transportation band, sand conveyer belt, drum agitator, delivery pump, conveyance conduit, concreting aid, for concrete surface is struck off long darby, be used for concrete surface polishing press polish calender; Described stone material mouth, sand material mouth, cement material mouth are connected with stone conveyer belt, sand conveyer belt, cement transportation band respectively; Described stone conveyer belt, sand conveyer belt, cement transportation band are connected with drum agitator, and the floor of conveyance conduit laying delivered to by the concrete after stirring by drum agitator by delivery pump and conveyance conduit.
2. construction equipment according to claim 1, is characterized in that, described concreting aid comprises concreting pump and pump line.
3. construction equipment according to claim 1, is characterized in that, described construction equipment also comprises the material thickness measurement card for controlling concrete ratio.
CN201420655975.3U 2014-10-31 2014-10-31 The efficient construction equipment of mechanical integrated flooring topping Expired - Fee Related CN204186076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420655975.3U CN204186076U (en) 2014-10-31 2014-10-31 The efficient construction equipment of mechanical integrated flooring topping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420655975.3U CN204186076U (en) 2014-10-31 2014-10-31 The efficient construction equipment of mechanical integrated flooring topping

Publications (1)

Publication Number Publication Date
CN204186076U true CN204186076U (en) 2015-03-04

Family

ID=52618087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420655975.3U Expired - Fee Related CN204186076U (en) 2014-10-31 2014-10-31 The efficient construction equipment of mechanical integrated flooring topping

Country Status (1)

Country Link
CN (1) CN204186076U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836817A (en) * 2017-04-24 2017-06-13 无锡市华灿化工有限公司 A kind of floor is whole to pour one-shot forming construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836817A (en) * 2017-04-24 2017-06-13 无锡市华灿化工有限公司 A kind of floor is whole to pour one-shot forming construction method

Similar Documents

Publication Publication Date Title
CN100575642C (en) Special fine sand high-strength high-performance concrete ultra-high pumping construction method
CN101619558B (en) Air entraining vacuum concrete roadway and constructing method thereof
CN208009855U (en) A kind of floor tile construction brick paving machine
CN106192907A (en) Set up the construction method of 150m~the 300m level high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN211646494U (en) Waterproof construction of underground garage foundation slab
CN108129095A (en) A kind of gunite concrete
CN106868958B (en) Self-compact concrete in construction system and its construction method
CN204186076U (en) The efficient construction equipment of mechanical integrated flooring topping
CN206722413U (en) A kind of concreting stitching integrated machine
CN110004787A (en) Pier storage yard road concrete surface construction method
CN109750832A (en) A kind of construction method of constructional column concrete self-compaction
CN103074868A (en) Precast fence plate dam reinforcing method
CN104313969A (en) Construction method of magnesium oxychloride cement concrete pavement
CN104314288A (en) Mechanical integration flooring protective layer efficient construction method
CN205917701U (en) A sleeve pipe distributing device for elephant trunk transport concrete
CN204081064U (en) A kind of basement sandwich
CN206988689U (en) A kind of underground piping partial collapse restoring means
CN105155574A (en) Sizing block-free installation process special for auxiliary equipment installation of thermal power plant
CN106013808B (en) It is a kind of to pave the concrete speading equipment of function with curved surface
CN210482942U (en) Concrete ground surface leveling device
CN108691255A (en) Rural highway concrete road construction method
CN113431072A (en) Super-long thick complex foundation bottom plate concrete seamless construction method
CN207377075U (en) A kind of floor tile flapping device
CN206071012U (en) A kind of spreading device of paving floor tile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

Termination date: 20181031