CN204185229U - 炼钢真空水模试验用示踪剂加入装置 - Google Patents
炼钢真空水模试验用示踪剂加入装置 Download PDFInfo
- Publication number
- CN204185229U CN204185229U CN201420610449.5U CN201420610449U CN204185229U CN 204185229 U CN204185229 U CN 204185229U CN 201420610449 U CN201420610449 U CN 201420610449U CN 204185229 U CN204185229 U CN 204185229U
- Authority
- CN
- China
- Prior art keywords
- pipe
- measuring cylinder
- tracer
- delivery line
- control cock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
本实用新型公开了一种炼钢真空水模试验用示踪剂加入装置,以解决目前不能在密闭条件下实现向真空室内连续多次加入示踪剂的问题。它主要由测量筒、导入管、导出管和活塞推送器组成,导入管和活塞推送器各与测量筒顶部连通,导出管与测量筒底部连通,导入管和导出管上有控制阀,活塞推送器和测量筒分别与三通管两头连接,三通管与测量筒连接的排气管上有单向进气阀,三通管另一头连接单向排气阀,导出管上控制阀与真空室连接管道通过通气管与测量筒连接,通气管上有控制阀。本实用新型装置结构简单、使用方便,能较好的实现示踪剂在密封条件下连续多次稳定的加入到真空室内。
Description
技术领域
本实用新型涉及一种炼钢真空水模试验用示踪剂加入装置。
背景技术
RH精炼是炼钢工艺过程重要环节,是生产高品质钢种的关键冶炼工艺。为研究RH精炼过程钢水的环流特性,优化工艺参数,一般利用相似原理建立一定比例的水力模型对RH真空装置进行模拟试验。在真空水模试验中,一般采用示踪剂对真空处理过程液体流动行为进行观察,或者对混匀时间进行测定。
由于真空水模试验中,真空室内压力小于大气压力,添加示踪剂时应避免真空室吸气;另外,试验过程中也需要连续多次定量地向真空室内加入示踪剂。目前,真空水模试验示踪剂添加一般是在试验前将测量好的示踪剂添加至与真空室相连的一密闭容器中,试验过程采用瞬时脉冲法加入真空室内。该方法虽然简单,但不能在密闭条件下实现向真空室内连续多次加入,每次添加示踪剂时需打开密闭容器,空气进入密闭容器后会造成真空室压力波动,影响试验的稳定性。另外,也有采用示踪剂推送器通过与真空室的连接管将示踪剂加入真空室内,该方法也只能单次定量加入示踪剂,多次定量加入时也会造成真空室内吸气,对试验过程的稳定性产生影响。
发明内容
本实用新型的目的在于克服现有技术缺陷,提供一种炼钢真空水模试验用示踪剂加入装置。
本实用新型的技术方案是这样实现的:炼钢真空水模试验用示踪剂加入装置,主要由测量筒、导入管、导出管和活塞推送器组成,导入管和活塞推送器各与测量筒顶部连通,导出管与测量筒底部连通,导入管和导出管上有控制阀,活塞推送器和测量筒分别与三通管两头连接,三通管与测量筒连接的排气管上有单向进气阀,三通管另一头连接单向排气阀。
优选的,导出管上控制阀与真空室连接管道通过通气管与测量筒连接,通气管上有控制阀。
优选的,通气管上的控制阀为三通阀,三通阀三个头分别与通气管、测量筒和排气管连接。
本实用新型可以通过多次来回移动活塞推送器排除测量筒中的气体,示踪剂在测量筒内负压的作用下从储存罐吸入测量筒内,通过调节示踪剂导入管上的控制阀可控制示踪剂加入量。由于测量筒内的气体可多次被气体推送器排出,示踪剂加入真空室时不仅可避免吸气,同时也能实现其连续多次定量加入。本实用新型结构简单、使用方便,能实现示踪剂在密封条件下连续多次稳定地加入到真空室内。
附图说明
图1是本实用新型结构示意图。
图中,1-活塞推送器;2-三通管;3-单向排气阀;4-单向进气阀;5-排气管;6-测量筒;7-三通阀;8-导入管;9-控制阀;10-导出管;11-通气管。
具体实施方式
下面结合附图作进一步描述:
如图1所示,炼钢真空水模试验用示踪剂加入装置,主要由测量筒6、导入管8、导出管10和活塞推送器1组成,导入管8和活塞推送器1各与测量筒6顶部连通,导出管10与测量筒6底部连通,导入管8和导出管10上有控制阀9,活塞推送器1和测量筒6分别与三通管2两头连接,三通管2与测量筒6连接的排气管5上有单向进气阀4,三通管2另一头连接单向排气阀3。导出管10上控制阀9与真空室连接管道通过通气管11与测量筒6连接,通气管6上有三通阀7,三通阀7三个头分别与通气管11、测量筒6和排气管5连接。
示踪剂测量筒6为上端带有示踪剂导入管8和排气管5,下端带有示踪剂导出管10的一封闭容器,且测量筒6上带有刻度,可对筒内的示踪剂进行计量;示踪剂导入管8安装一控制阀9,对示踪剂加入量进行控制,且与示踪剂存储罐相连;示踪剂导出管10上安装一隔离控制阀9,以便计量示踪剂时与真空室隔离;通气管11主要是平衡真空室内和示踪剂测量筒6内的压力,以便示踪剂能够顺利加入真空室。
活塞推送器1主要由推送筒和带有推送柄的密封活塞组成,活塞可以在推送筒内移动以吸入或压出气体;活塞推送器1底部通过一橡胶管与三通管2相连,三通管2另两端分别连接单向进气阀4和单向排气阀3,单向进气阀只能进气而不能排气,而单向排气阀只能排气而不能进气;单向进气阀4与示踪剂测量筒6上端的排气管5相连,通过活塞推送器1抽气使测量筒6内形成负压,以吸入示踪剂。
加入示踪剂前,关闭导出管10上的控制阀9,打开导入管8上的控制阀9,旋转三通阀7使测量筒6与排气管5相通,而与通气管11断开;抽动活塞推送器1中的活塞,使示踪剂测量筒6中的空气通过单向进气阀4进入活塞推送器1内,然后推动活塞使气体通过单向排气阀3排出空气,不断地抽动和推送活塞,排除测量筒6中的空气;由于测量筒6内的负压,示踪剂会通过导入管8进入测量筒6内,当示踪剂加入量达到预定值后即可关闭导入管8上的控制阀9,并停止抽气;旋转三通阀7使测量筒6与排气管5断开而与通气管11相通,然后打开导出管10上的控制阀9,由于真空室内压力和测量筒6压力相同,示踪剂在重力作用下流向真空室,完成一次示踪剂的添加。重复以上操作可进行示踪剂的多次添加。
实验室表明,采用本实用新型装置,操作简单方便,很好地实现了示踪剂在密封条件下连续多次稳定加入到真空室内,满足了试验要求。
Claims (3)
1.炼钢真空水模试验用示踪剂加入装置,其特征在于:它主要由测量筒、导入管、导出管和活塞推送器组成,导入管和活塞推送器各与测量筒顶部连通,导出管与测量筒底部连通,导入管和导出管上有控制阀,活塞推送器和测量筒分别与三通管两头连接,三通管与测量筒连接的排气管上有单向进气阀,三通管另一头连接单向排气阀。
2.根据权利要求1所述的炼钢真空水模试验用示踪剂加入装置,其特征在于:导出管上控制阀与真空室连接管道通过通气管与测量筒连接,通气管上有控制阀。
3.根据权利要求2所述的炼钢真空水模试验用示踪剂加入装置,其特征在于:通气管上的控制阀为三通阀,三通阀三个头分别与通气管、测量筒和排气管连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420610449.5U CN204185229U (zh) | 2014-10-22 | 2014-10-22 | 炼钢真空水模试验用示踪剂加入装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420610449.5U CN204185229U (zh) | 2014-10-22 | 2014-10-22 | 炼钢真空水模试验用示踪剂加入装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204185229U true CN204185229U (zh) | 2015-03-04 |
Family
ID=52617241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420610449.5U Expired - Fee Related CN204185229U (zh) | 2014-10-22 | 2014-10-22 | 炼钢真空水模试验用示踪剂加入装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204185229U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106011387A (zh) * | 2016-07-12 | 2016-10-12 | 辽宁科技大学 | 一种向rh水力学模型钢包底部投入物料的装置 |
CN108072156A (zh) * | 2016-11-09 | 2018-05-25 | 中国辐射防护研究院 | 一种可持续实现稳定压力、温度和相对湿度的气流控制系统 |
-
2014
- 2014-10-22 CN CN201420610449.5U patent/CN204185229U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106011387A (zh) * | 2016-07-12 | 2016-10-12 | 辽宁科技大学 | 一种向rh水力学模型钢包底部投入物料的装置 |
CN108072156A (zh) * | 2016-11-09 | 2018-05-25 | 中国辐射防护研究院 | 一种可持续实现稳定压力、温度和相对湿度的气流控制系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204185229U (zh) | 炼钢真空水模试验用示踪剂加入装置 | |
CN101537268B (zh) | 胶水除泡装置 | |
CN202494583U (zh) | 水质采样器 | |
CN202390183U (zh) | 一种具有补偿装置的液体加注系统 | |
CN201535439U (zh) | 一种二氧化碳气体增压装置 | |
CN205173610U (zh) | 一种自动水封控压装置 | |
CN203385587U (zh) | 一种新型取样装置 | |
CN203925470U (zh) | 玻璃管量油装置 | |
CN103979456B (zh) | 油压千斤顶和加荷系统 | |
CN205933207U (zh) | 一种可移动的橡木桶用压力添酒装置 | |
CN202614482U (zh) | 一种柱塞缸气密性检测装置 | |
CN201565162U (zh) | 球体式胶水除泡装置 | |
CN203308459U (zh) | 一孔多层井的真空取样装置 | |
CN203908620U (zh) | 一种手动控制料液加料计量装置 | |
CN205355143U (zh) | 一种锂电池注液装置 | |
CN203867796U (zh) | 防逆流型手摇油泵 | |
CN204650893U (zh) | 一种自喷井模拟装置 | |
CN204601696U (zh) | 液料提取分离装置 | |
CN205473786U (zh) | 一种半自动发酵补糖装置 | |
CN204236433U (zh) | 多功能轮胎充气枪 | |
CN204171280U (zh) | 精密铸模装置 | |
CN202900227U (zh) | 油井气液分流装置 | |
CN208308521U (zh) | 上流式沼气池取样装置 | |
CN202141579U (zh) | 大型非恒定流减压箱 | |
CN203090774U (zh) | 一种用于检测中空纤维膜滤芯通水量的检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170725 Address after: 430083, Gate No. 2, Qingshan District, Hubei, Wuhan Patentee after: Wuhan iron and Steel Company Limited Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang Patentee before: Wuhan Iron & Steel (Group) Corp. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150304 Termination date: 20191022 |
|
CF01 | Termination of patent right due to non-payment of annual fee |