CN204176255U - Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe - Google Patents

Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe Download PDF

Info

Publication number
CN204176255U
CN204176255U CN201420637704.5U CN201420637704U CN204176255U CN 204176255 U CN204176255 U CN 204176255U CN 201420637704 U CN201420637704 U CN 201420637704U CN 204176255 U CN204176255 U CN 204176255U
Authority
CN
China
Prior art keywords
repaired mouth
outer pillar
insulation pipe
thermal insulation
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420637704.5U
Other languages
Chinese (zh)
Inventor
张居山
赖贞澄
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201420637704.5U priority Critical patent/CN204176255U/en
Application granted granted Critical
Publication of CN204176255U publication Critical patent/CN204176255U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The utility model relates to a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe.The welding of original repaired mouth plate be after repaired mouth coiled sheet bag at two ends additional electric heating melting, surface is seen and is tied up firmly, sweat soldering reaches one, but because the outer pillar temperature of pipeline is low, do not reach thermo-fuse, can not melt, just repaired mouth plate is pasted onto outer pillar surface after dissolving, and causes outer pillar and repaired mouth plate to realize one never.A kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body (1), described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube (2).The utility model is applied to prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe.

Description

Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe
technical field:
the utility model relates to a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe.
background technique:
in prefabricated direct-buried thermal insulation pipe more than 30 years since the eighties introduces China, improve the thermal efficiency of Chinese central heat supply, saved mass energy.But along with a large amount of application, need construct at the scene in the attachment portion of pipe joint part, due to reasons such as the engineering time is urgent, natural temperature coolings, cause pipeline after steel-pipe welding, the outer pillar sweat soldering quality of thermal insulation pipe cannot promote, cause pipe joint place heat insulation effect low, outer pillar not prison welding infiltration is the main cause causing pipe temperature to decline.The welding of original repaired mouth plate be after repaired mouth coiled sheet bag at two ends additional electric heating melting, surface is seen and is tied up firmly, sweat soldering reaches one, but because the outer pillar temperature of pipeline is low, do not reach thermo-fuse, can not melt, just repaired mouth plate is pasted onto outer pillar surface after dissolving, outer pillar and repaired mouth plate is caused to realize one never, along with the variation of temperature, the extruding of soil, the position be pasted not strongly just there will be gap and breaks, and soil moisture enters into thermal insulation layer immediately, causes heat insulation effect to decline to a great extent.
summary of the invention:
the purpose of this utility model is to provide a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe.
above-mentioned object is realized by following technological scheme:
a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body, described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube.
described prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, described body material polyethylene.
the beneficial effects of the utility model:
1. the utility model due to repaired mouth sleeve pipe two ends be contractility, after repaired mouth position is determined, while adopting the outer pillar of hot blast welding machine fusing, repaired mouth sleeve pipe heat shrinkable melts, be welded together with the outer pillar surface of fusing, form seamless integrated polyethylene and connect, the change of temperature and soil, the polyethylene of one all can not be made to form phase transformation be separated, thus realize the high quality repaired mouth heat insulation effect of NBS requirement.
the scalable repaired mouth sleeve pipe that the utility model is is caliber standard with the outer pillar diameter of different size insulation pipe, material is consistent with outer pillar, and scalable repaired mouth sleeve pipe two ends diameter is slightly soft and be greater than outer pillar external diameter.Before two prefabricated direct-buried thermal insulation pipe welding, outside scalable repaired mouth casing pipe sleeve wherein an outer pillar, after steel-pipe welding ne-leakage, scalable repaired mouth sleeve pipe is moved to two outer pillar repaired mouth positions, remove the dust foreign material on outer pillar, use radio frequency heating wind welding machine, blow to repaired mouth sleeve pipe two ends, after two ends are heated, natural shrinking fusing combines together with outer pillar, realize seamless outer pillar to connect, soil moisture cannot infiltrate the thermal insulation layer in pipe, thus serves high-efficiency insulated function.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present utility model.
accompanying drawing 2 is the utility model sectional views.
embodiment:
embodiment 1:
a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body 1, described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube 2.
embodiment 2:
prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe according to embodiment 1, described body material polyethylene.

Claims (2)

1. a prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body, it is characterized in that: described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube.
2. prefabricated direct-buried thermal insulation pipe road according to claim 1 system scalability repaired mouth sleeve pipe, is characterized in that: described body material polyethylene.
CN201420637704.5U 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe Expired - Fee Related CN204176255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420637704.5U CN204176255U (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420637704.5U CN204176255U (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe

Publications (1)

Publication Number Publication Date
CN204176255U true CN204176255U (en) 2015-02-25

Family

ID=52565065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420637704.5U Expired - Fee Related CN204176255U (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe

Country Status (1)

Country Link
CN (1) CN204176255U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104390103A (en) * 2014-10-31 2015-03-04 哈尔滨朗格斯特节能科技有限公司 Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104390103A (en) * 2014-10-31 2015-03-04 哈尔滨朗格斯特节能科技有限公司 Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method

Similar Documents

Publication Publication Date Title
CN107504309B (en) High sealing is seamless hot melt set and preparation method thereof and application method
EA201270564A1 (en) METHOD AND DEVICE FOR LAYING AND REPAIR OF INSULATED PIPELINE
CN204176255U (en) Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe
CN104390103A (en) Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method
CN207185928U (en) A kind of heater and its electronic smoke atomizer being made up of more heating wire parallel connections
CN204327123U (en) Waterproof board hot melt welding mechanism
CN204290245U (en) A kind of pyrocondensation sealing cap
CN207394203U (en) High sealing is seamless, and hot melt covers
CN203857154U (en) Connecting structure for electric hot melting socket steel belt enhanced polyethylene helical corrugated pipe
CN103423543A (en) Universal-movement PE (polyethylene) combination electric hot molten pipe fitting and molding technology thereof
CN103588461B (en) A kind of fusible cut-out solidifying agent and preparation method thereof
CN202318951U (en) Socket welding equipment for machining pipe fittings
CN202992500U (en) Composite tube connecting part
CN204239980U (en) Prefabricated direct-buried thermal insulation pipe road hot melt buries a repaired mouth panel assembly
CN205101778U (en) Connecting piece of firm type heat shrinkage bush bonds
CN103660279A (en) Plastic welding method
CN104373772B (en) Prefabricated direct-buried heat-insulation pipeline hot-melting wire-buried joint coating plate device and manufacturing method
CN203453692U (en) Plastic-aluminum composite pipe connecting piece
CN202834537U (en) Metal-plastic composite pipe connecting component
CN207505160U (en) A kind of Electrothermal bent tube
CN206100517U (en) Electromagnetic shield drum
CN204115885U (en) A kind of packaging structure of temperature sensor
CN203811003U (en) Heat exchange tube structure
CN203477737U (en) Universal movable PE (polyethylene) combined electric smelting pipe fitting
CN203435168U (en) Electric heating tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LANGGE SITE HARBIN ENVIRONMENTAL PROTECTION ENERGY

Free format text: FORMER OWNER: HARBIN LOGSTOR ENERGY SAVING TECHNOLOGY CO., LTD.

Effective date: 20150906

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150906

Address after: 150000, 48 Elm Road, elm Town, Daoli District, Heilongjiang, Harbin

Patentee after: LOGSTOR HARBIN ENVIRONMENTAL PROTECTION ENERGY SAVING PRODUCT MANUFACTURING CO.,LTD.

Address before: 150047 Heilongjiang city of Harbin province Daoli District new Elm Road No. 48

Patentee before: HARBIN LOGSTOR ENERGY-SAVING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190814

Address after: 150000, 48 Elm Road, elm Town, Daoli District, Heilongjiang, Harbin

Patentee after: HARBIN LOGSTOR ENERGY-SAVING TECHNOLOGY Co.,Ltd.

Address before: 150000, 48 Elm Road, elm Town, Daoli District, Heilongjiang, Harbin

Patentee before: LOGSTOR HARBIN ENVIRONMENTAL PROTECTION ENERGY SAVING PRODUCT MANUFACTURING CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

Termination date: 20211031