CN104390103A - Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method - Google Patents
Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method Download PDFInfo
- Publication number
- CN104390103A CN104390103A CN201410596302.XA CN201410596302A CN104390103A CN 104390103 A CN104390103 A CN 104390103A CN 201410596302 A CN201410596302 A CN 201410596302A CN 104390103 A CN104390103 A CN 104390103A
- Authority
- CN
- China
- Prior art keywords
- pipe
- outer pillar
- repaired mouth
- prefabricated direct
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L59/00—Thermal insulation in general
- F16L59/14—Arrangements for the insulation of pipes or pipe systems
- F16L59/15—Arrangements for the insulation of pipes or pipe systems for underground pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/168—Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
Abstract
The invention relates to a telescopic connector repairing sleeve of a prefabricated direct-embedded heat preservation pipeline system and a connecting method. Welding of an original connector repairing plate is realized in a way that electricity is supplied to the outer parts of two ends of the original connector repairing plate for carrying out hot melting after the original connector repairing plate is rolled, the bundling of the original connector repairing plate is firm and integrated hot melting welding is achieved from the surface, but an outer protection pipe of a pipeline cannot be in contact with a thermal fuse due to low temperature of the outer protection pipe, the outer protection pipe cannot be melted, the original connector repairing plate is only adhered to the surface of the outer protection pipe after being melted, and the integration of the outer protection pipe and the connector repairing plate never can be realized. The telescopic connector repairing sleeve of the prefabricated direct-embedded heat preservation pipeline system comprises a pipe body (1), wherein the pipe body is in a dumbbell shape, the middle pipe diameter of the pipe body is the same as the diameter of the outer protection pipe of a heat preservation pipeline, the pipe diameter of two ends of the pipe body is greater than the diameter of the outer protection pipe of the heat preservation pipeline, and the two ends of the pipe body are provided with telescopic pipes (2). The telescopic connector repairing sleeve and the connecting method, disclosed by the invention, are applied to the telescopic connector repairing sleeve of the prefabricated direct-embedded heat preservation pipeline system.
Description
technical field:
the present invention relates to a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe and connecting means.
background technique:
in prefabricated direct-buried thermal insulation pipe more than 30 years since the eighties introduces China, improve the thermal efficiency of Chinese central heat supply, saved mass energy.But along with a large amount of application, need construct at the scene in the attachment portion of pipe joint part, due to reasons such as the engineering time is urgent, natural temperature coolings, cause pipeline after steel-pipe welding, the outer pillar sweat soldering quality of thermal insulation pipe cannot promote, cause pipe joint place heat insulation effect low, outer pillar not prison welding infiltration is the main cause causing pipe temperature to decline.The welding of original repaired mouth plate be after repaired mouth coiled sheet bag at two ends additional electric heating melting, surface is seen and is tied up firmly, sweat soldering reaches one, but because the outer pillar temperature of pipeline is low, do not reach thermo-fuse, can not melt, just repaired mouth plate is pasted onto outer pillar surface after dissolving, outer pillar and repaired mouth plate is caused to realize one never, along with the variation of temperature, the extruding of soil, the position be pasted not strongly just there will be gap and breaks, and soil moisture enters into thermal insulation layer immediately, causes heat insulation effect to decline to a great extent.
summary of the invention:
the object of this invention is to provide a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe and connecting means.
above-mentioned object is realized by following technological scheme:
a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body, described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube.
described prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, described body material polyethylene.
the connecting means of described prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, first be the scalable repaired mouth sleeve pipe of caliber standard according to the outer pillar diameter of different size insulation pipe, material is consistent with outer pillar, and scalable repaired mouth sleeve pipe two ends diameter is slightly soft and be greater than outer pillar external diameter; Before two prefabricated direct-buried thermal insulation pipe welding, outside scalable repaired mouth casing pipe sleeve wherein an outer pillar, after steel-pipe welding ne-leakage, scalable repaired mouth sleeve pipe is moved to two outer pillar repaired mouth positions, remove the dust foreign material on outer pillar, use radio frequency heating wind welding machine, blow to repaired mouth sleeve pipe two ends, after two ends are heated, natural shrinking fusing combines together with outer pillar, realize seamless outer pillar to connect, soil moisture cannot infiltrate the thermal insulation layer in pipe, thus serves high-efficiency insulated function.
beneficial effect of the present invention:
1. the present invention due to repaired mouth sleeve pipe two ends be contractility, after repaired mouth position is determined, while adopting the outer pillar of hot blast welding machine fusing, repaired mouth sleeve pipe heat shrinkable melts, be welded together with the outer pillar surface of fusing, form seamless integrated polyethylene and connect, the change of temperature and soil, the polyethylene of one all can not be made to form phase transformation be separated, thus realize the high quality repaired mouth heat insulation effect of NBS requirement.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is sectional views of the present invention.
embodiment:
embodiment 1:
a kind of prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body 1, described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube 2.
embodiment 2:
prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe according to embodiment 1, described body material polyethylene.
embodiment 3:
connection (use) method of the prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe according to embodiment 1 or 2, first be the scalable repaired mouth sleeve pipe of caliber standard according to the outer pillar diameter of different size insulation pipe, material is consistent with outer pillar, and scalable repaired mouth sleeve pipe two ends diameter is slightly soft and be greater than outer pillar external diameter; Before two prefabricated direct-buried thermal insulation pipe welding, outside scalable repaired mouth casing pipe sleeve wherein an outer pillar, after steel-pipe welding ne-leakage, scalable repaired mouth sleeve pipe is moved to two outer pillar repaired mouth positions, remove the dust foreign material on outer pillar, use radio frequency heating wind welding machine, blow to repaired mouth sleeve pipe two ends, after two ends are heated, natural shrinking fusing combines together with outer pillar, realize seamless outer pillar to connect, soil moisture cannot infiltrate the thermal insulation layer in pipe, thus serves high-efficiency insulated function.
Claims (3)
1. a prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe, its composition comprises: body, it is characterized in that: described tubular form is for being dumbbell-like shape, in the middle of described body, caliber is identical with the outer pillar diameter of insulation pipe, described body two ends caliber is greater than the outer pillar diameter of insulation pipe, and described body two ends are telescopic tube.
2. prefabricated direct-buried thermal insulation pipe road according to claim 1 system scalability repaired mouth sleeve pipe, is characterized in that: described body material polyethylene.
3. the connecting means of the prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe described in a claim 1 or 2, it is characterized in that: the scalable repaired mouth sleeve pipe first according to the outer pillar diameter of different size insulation pipe being caliber standard, material is consistent with outer pillar, and scalable repaired mouth sleeve pipe two ends diameter is slightly soft and be greater than outer pillar external diameter; Before two prefabricated direct-buried thermal insulation pipe welding, outside scalable repaired mouth casing pipe sleeve wherein an outer pillar, after steel-pipe welding ne-leakage, scalable repaired mouth sleeve pipe is moved to two outer pillar repaired mouth positions, remove the dust foreign material on outer pillar, use radio frequency heating wind welding machine, blow to repaired mouth sleeve pipe two ends, after two ends are heated, natural shrinking fusing combines together with outer pillar, realize seamless outer pillar to connect, soil moisture cannot infiltrate the thermal insulation layer in pipe, thus serves high-efficiency insulated function.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410596302.XA CN104390103A (en) | 2014-10-31 | 2014-10-31 | Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410596302.XA CN104390103A (en) | 2014-10-31 | 2014-10-31 | Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104390103A true CN104390103A (en) | 2015-03-04 |
Family
ID=52608044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410596302.XA Pending CN104390103A (en) | 2014-10-31 | 2014-10-31 | Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104390103A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107504309A (en) * | 2017-08-17 | 2017-12-22 | 北京中科九章科技有限公司 | High sealing is seamless hot melt set and preparation method thereof and application method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2247270Y (en) * | 1996-04-02 | 1997-02-12 | 中国石油天然气总公司工程技术研究院 | Joint for connection of high-temp. thermal-insulating pipe |
CN201106735Y (en) * | 2007-12-04 | 2008-08-27 | 中国石油天然气集团公司 | Trilaminate polythene antisepsis pipe of solvent-free epoxy-paint patching mouth |
CN201437886U (en) * | 2009-07-03 | 2010-04-14 | 中国石油天然气集团公司 | Polyurethane foam submarine pipe for solvent-free epoxy coating joint |
JP2011046136A (en) * | 2009-08-28 | 2011-03-10 | Asada Kk | Rotational friction joining method of thermoplastic resin pipe |
CN204176255U (en) * | 2014-10-31 | 2015-02-25 | 哈尔滨朗格斯特节能科技有限公司 | Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe |
-
2014
- 2014-10-31 CN CN201410596302.XA patent/CN104390103A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2247270Y (en) * | 1996-04-02 | 1997-02-12 | 中国石油天然气总公司工程技术研究院 | Joint for connection of high-temp. thermal-insulating pipe |
CN201106735Y (en) * | 2007-12-04 | 2008-08-27 | 中国石油天然气集团公司 | Trilaminate polythene antisepsis pipe of solvent-free epoxy-paint patching mouth |
CN201437886U (en) * | 2009-07-03 | 2010-04-14 | 中国石油天然气集团公司 | Polyurethane foam submarine pipe for solvent-free epoxy coating joint |
JP2011046136A (en) * | 2009-08-28 | 2011-03-10 | Asada Kk | Rotational friction joining method of thermoplastic resin pipe |
CN204176255U (en) * | 2014-10-31 | 2015-02-25 | 哈尔滨朗格斯特节能科技有限公司 | Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe |
Non-Patent Citations (1)
Title |
---|
黄春芳: "《油气管道设计与施工》", 31 July 2008, 北京:中国石化出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107504309A (en) * | 2017-08-17 | 2017-12-22 | 北京中科九章科技有限公司 | High sealing is seamless hot melt set and preparation method thereof and application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107504309B (en) | High sealing is seamless hot melt set and preparation method thereof and application method | |
EA201270564A1 (en) | METHOD AND DEVICE FOR LAYING AND REPAIR OF INSULATED PIPELINE | |
CN101526158B (en) | Hot shrinkage/melt bush and manufacturing method and construction method thereof | |
CN202140730U (en) | Electric hot melting pipe fitting | |
CN204176255U (en) | Prefabricated direct-buried thermal insulation pipe road system scalability repaired mouth sleeve pipe | |
CN104390103A (en) | Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method | |
CN104625287A (en) | Copper pipe braze welding technology | |
CN204327123U (en) | Splash guard sweat soldering mechanism | |
CN201364963Y (en) | Connector device for electrically connecting two electric wires | |
CN103402279A (en) | Electric heating pipe | |
CN203857154U (en) | Connecting structure for electric hot melting socket steel belt enhanced polyethylene helical corrugated pipe | |
CN207394203U (en) | High sealing is seamless, and hot melt covers | |
CN202992500U (en) | Composite tube connecting part | |
CN104373772A (en) | Hot melting buried wire joint coating plate device for prefabricated directly-buried insulating pipeline and manufacturing method | |
CN205101778U (en) | Connecting piece of firm type heat shrinkage bush bonds | |
CN205026303U (en) | What be provided with electric fuse is used for PE of heavy -calibre to manage patch | |
CN204239980U (en) | Prefabricated direct-buried thermal insulation pipe road hot melt buries a repaired mouth panel assembly | |
CN208900945U (en) | A kind of novel pipeline repaired mouth device | |
CN106678458B (en) | A kind of easily direct Petroleum Pipehead of duplex | |
CN202834537U (en) | Metal-plastic composite pipe connecting component | |
CN206786159U (en) | A kind of easily direct Petroleum Pipehead of duplex | |
CN205733414U (en) | Heavy caliber petroleum natural gas transportation tube welder | |
CN206268633U (en) | A kind of socket fitting type structure wall winding tube | |
CN205026288U (en) | A electric smelting pipe fitting for biaxial stretching PE, PPR pipeline | |
CN103962696B (en) | Tool and method for welding copper pipe and stainless steel pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150304 |
|
RJ01 | Rejection of invention patent application after publication |