CN204163744U - Net spray leveling layer self waterproof structure between a kind of subway station stake - Google Patents

Net spray leveling layer self waterproof structure between a kind of subway station stake Download PDF

Info

Publication number
CN204163744U
CN204163744U CN201420527815.0U CN201420527815U CN204163744U CN 204163744 U CN204163744 U CN 204163744U CN 201420527815 U CN201420527815 U CN 201420527815U CN 204163744 U CN204163744 U CN 204163744U
Authority
CN
China
Prior art keywords
layer
cement
waterproof
dowel
subway station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420527815.0U
Other languages
Chinese (zh)
Inventor
王宗勇
武明静
王剑
雷军
赵香萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201420527815.0U priority Critical patent/CN204163744U/en
Application granted granted Critical
Publication of CN204163744U publication Critical patent/CN204163744U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to subway station side wall waterproof field, be specially net spray leveling layer self waterproof structure between the stake of a kind of subway station, solve net between the stake of existing station and be sprayed with penetrating passage, water-proof leveling layer affects the difficult problem such as main body construction progress and waterproofing course laying quality difference, comprise interval and be anchored at dowel on each fender post, all dowel length exposing to fender post is identical, end, dowel outer end is welded with reinforced mesh, the concrete ejection anchor layer equal with reinforced mesh is provided with between adjacent fender post, concrete ejection anchor layer trypsin method has cement-base infiltration crystallization coating waterproof layer, the floating layer of cement mortar is provided with outside cement-base infiltration crystallization coating waterproof layer.To make full use of after sprayed mortar initial set spray cement based penetrant crystalline coating mortar easily levelling and improve the advantages such as waterproof effect, not only simplify working procedure, the reduction of erection time, and improve waterproof quality, reduce construction cost, have that technique is simple, advanced technology, the advantage such as practical.

Description

Net spray leveling layer self waterproof structure between a kind of subway station stake
Technical field
The utility model relates to subway station side wall waterproof field, is specially net spray leveling layer self waterproof structure between the stake of a kind of subway station.
Background technology
China's city underground is just entering construction high-tide period, and station construction waterproof is one-level, requires that the complete rear agent structure of station construction is without wet stain.But, station space enclosing structure adopts boring interval stake mostly at present, the outer precipitation in hole is adopted during excavation, need to carry out sprayed mortar between stake, lay waterproofing course after needing to carry out mortar levelling before main body construction, this conventional method not only affects main body construction progress, and leveling layer easily falls block and affects waterproofing course laying quality, add self hole of online spray more, finally cause main body to seep water serious.Also do not have a kind of method and device can realize both not only having affected main body construction progress at present, do not affect waterproof quality again.Subway station side wall water-proof leveling layer is worth research.
Summary of the invention
The utility model, in order to solve that net between the stake of existing station is sprayed with penetrating passage, water-proof leveling layer affects main body construction progress and the difficult problem such as waterproofing course laying quality difference, provides net spray leveling layer self waterproof structure between the stake of a kind of subway station.
The utility model adopts following scheme to realize: net spray leveling layer self waterproof structure between the stake of a kind of subway station, comprise interval and be anchored at dowel on each fender post, all dowel length exposing to fender post is identical, end, dowel outer end is welded with reinforced mesh, the concrete ejection anchor layer equal with reinforced mesh is provided with between adjacent fender post, concrete ejection anchor layer trypsin method has cement-base infiltration crystallization coating waterproof layer, is provided with the floating layer of cement mortar outside cement-base infiltration crystallization coating waterproof layer.The concrete of rapid setting cement and expansive cement preparation adopts conventional concrete spray technology to be formed by described concrete ejection anchor layer, and described cement-base infiltration crystallization coating waterproof layer adopts conventional spray paint technique by well known materials cement based penetration crystallization type water proofing paint and formed.
The described dowel length exposing to fender post is the thickness of concrete ejection anchor layer.
Described concrete ejection anchor layer thickness is 3 ~ 5cm, and the thickness of cement-base infiltration crystallization coating waterproof layer is 1 ~ 2cm.
First, invade sunken fender post by measurement processing after excavation pit, then, stake is holed rear rapid setting cement and expansive cement anchor bar net, and sprayed mortar; Last at sprayed mortar face spray cement based penetrant crystalline coating, final cement mortar is floating, forms water-proof leveling structure.
Compared with prior art, the utility model has the following advantages:
1) by rapid setting cement and expansive cement anchor bar mesh sheet in stake, and reinforced mesh is fixed on the identical fender post dowel of protruded length, substantially increases the planeness of concrete ejection anchor layer, reduce net spray springback capacity, accelerating construction progress;
2) after the initial set of concrete ejection anchor layer, spray cement based penetrant crystalline coating, then cement mortar screeding, realizes net spray and the one-shot forming of water-proof leveling layer, reduces working procedure;
3) adopt cement-base infiltration crystallization dope layer and cement sand bed levelling to anchor layer, not only strengthen anchor layer and leveling layer adhesion stress, and achieve the closely knit impervious effect of net spray, also self-regeneration hole is carried out to leveling layer, substantially increase waterproof action, stop the infiltration of main body later stage;
In a word, it is easily levelling and improve the advantages such as waterproof effect that the utility model to make full use of after sprayed mortar initial set spray cement based penetrant crystalline coating mortar, not only simplify working procedure, reduction of erection time, and improve waterproof quality, reduce construction cost, there is technique simple, advanced technology, the advantage such as practical, this technology is adopted to have successfully completed Shenyang Metro No. 9 line 7 Biao Wang river way stations and the levelling construction of interval ventilating shaft agent structure side wall waterproofing course, fill up the blank of China's subway station side wall waterproof net spray construction of leveling blanket technology, achieve good economic benefit and social benefit.This practicality is newly applicable to underground all fender post agent structures side wall water-proof leveling layer construction.
Accompanying drawing explanation
Fig. 1 is generalized section of the present utility model;
Fig. 2 is the utility model vertical section schematic diagram;
In figure: 1-fender post; 2-dowel; 3-reinforced mesh; 4-concrete ejection anchor layer; 5-cement-base infiltration crystallization coating waterproof layer; The floating layer of 6-cement mortar.
Detailed description of the invention
Net spray leveling layer self waterproof structure between a kind of subway station stake, as shown in Figure 1, 2, comprise interval and be anchored at the dowel 2 each fender post 1 with jet thickness mark, all dowel length exposing to fender post is identical, end, dowel outer end is welded with reinforced mesh 3, the concrete ejection anchor layer 4 equal with reinforced mesh is provided with between adjacent fender post, concrete ejection anchor layer trypsin method has cement-base infiltration crystallization coating waterproof layer 5, is provided with the floating layer 6 of cement mortar outside cement-base infiltration crystallization coating waterproof layer.Dowel 2 length exposing to fender post 1 is the thickness of concrete ejection anchor layer 4; Concrete ejection anchor layer 4 thickness is 3 ~ 5cm, and the thickness of cement-base infiltration crystallization coating waterproof layer 5 is 1 ~ 2cm.
During concrete enforcement, comprise the following steps:
Step one, apply steel mesh reinforcement and jet thickness mark
Clearance survey is carried out after A, pit earthwork excavation; B, process is cut to encroachment line stake position; C, rear anchoring dowel of holing on fender post, dowel protruded length is the jet thickness of concrete ejection anchor layer; D, steel mesh reinforcement to be welded on dowel.
Step 2, sprayed mortar are levelling
A, to the position sprayed mortar hanging up properly steel mesh reinforcement; Immediately at its surface spraying cement-base infiltration crystallization coating after the initial set of B, sprayed mortar covering steel mesh reinforcement; C, finally by cement mortar by floating for its surface.
case history
Between a kind of subway station stake, net spray leveling layer self waterproof structure is used in Shenyang Metro No. 9 line 7 Biao Wang river way stations and interval ventilating shaft side wall engineering, between employing stake after sprayed mortar, spray cement based penetrant crystalline coating immediately, and it is floating by cement mortar, not only simplify operation, accelerate main body construction progress, and guarantee waterproof quality, reduce construction cost.Prove this advanced technology, methodological science is reasonable.
This utility model has been generalized in my company's other City Subway Station side wall water-proof leveling layers construction, ensure that construction speed and waterproof quality, reduces construction cost, simplify operation, achieve good economic benefit and social benefit, facts have proved, this technical scheme is practical, and promotion prospect is good.

Claims (3)

1. net spray leveling layer self waterproof structure between a subway station stake, it is characterized in that comprising interval and be anchored at dowel (2) on each fender post (1), all dowel length exposing to fender post is identical, end, dowel outer end is welded with reinforced mesh (3), the concrete ejection anchor layer (4) equal with reinforced mesh is provided with between adjacent fender post, concrete ejection anchor layer trypsin method has cement-base infiltration crystallization coating waterproof layer (5), is provided with the floating layer of cement mortar (6) outside cement-base infiltration crystallization coating waterproof layer.
2. net spray leveling layer self waterproof structure between a kind of subway station stake according to claim 1, dowel (2) length that it is characterized in that exposing to fender post (1) is the thickness of concrete ejection anchor layer (4).
3. net spray leveling layer self waterproof structure between a kind of subway station stake according to claim 1 and 2, it is characterized in that concrete ejection anchor layer (4) thickness is 3 ~ 5cm, the thickness of cement-base infiltration crystallization coating waterproof layer (5) is 1 ~ 2cm.
CN201420527815.0U 2014-09-15 2014-09-15 Net spray leveling layer self waterproof structure between a kind of subway station stake Expired - Fee Related CN204163744U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420527815.0U CN204163744U (en) 2014-09-15 2014-09-15 Net spray leveling layer self waterproof structure between a kind of subway station stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420527815.0U CN204163744U (en) 2014-09-15 2014-09-15 Net spray leveling layer self waterproof structure between a kind of subway station stake

Publications (1)

Publication Number Publication Date
CN204163744U true CN204163744U (en) 2015-02-18

Family

ID=52537443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420527815.0U Expired - Fee Related CN204163744U (en) 2014-09-15 2014-09-15 Net spray leveling layer self waterproof structure between a kind of subway station stake

Country Status (1)

Country Link
CN (1) CN204163744U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975042A (en) * 2017-12-08 2018-05-01 中冶天工集团天津有限公司 A kind of supporting type water-stop curtain and its construction method
CN109281321A (en) * 2018-11-28 2019-01-29 中建隧道建设有限公司 Plate device and construction method for side wall gunite concrete with mould rapid construction
CN110172978A (en) * 2019-06-21 2019-08-27 中铁上海工程局集团有限公司 A kind of subway open-cut station waterproof basal plane construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975042A (en) * 2017-12-08 2018-05-01 中冶天工集团天津有限公司 A kind of supporting type water-stop curtain and its construction method
CN109281321A (en) * 2018-11-28 2019-01-29 中建隧道建设有限公司 Plate device and construction method for side wall gunite concrete with mould rapid construction
CN110172978A (en) * 2019-06-21 2019-08-27 中铁上海工程局集团有限公司 A kind of subway open-cut station waterproof basal plane construction method

Similar Documents

Publication Publication Date Title
CN101831985B (en) Precast concrete wallboard and preparation method thereof
CN101761092B (en) Construction method of movable side wall of large overall template of large-span deep foundation pit
CN107989401A (en) A kind of existing building external wall reconstruction structure and construction method
CN103981896B (en) The seamless link construction method of a kind of outer wall of basement and fender post
CN104594348A (en) Expanded head capsule type anchor rod and construction method thereof
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN101985882A (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN109026064A (en) A kind of construction method that large span multiple-arch tunnel is hazy
CN204163744U (en) Net spray leveling layer self waterproof structure between a kind of subway station stake
CN105274967A (en) Repairing method for hydraulic concrete crack
CN204676714U (en) Water-stopping steel strip and construction joint structure
CN101560777A (en) Waterproof construction method for bottom plate of basement with anti-float anchor rod
CN208702428U (en) A kind of Tunnel Passing cavity canopy protection structure
CN207829511U (en) A kind of existing building external wall reconstruction structure
CN204590015U (en) A kind of anchor head be placed in concrete slab
CN110295552A (en) A kind of gate-type assembled box culvert and construction method
CN103790168A (en) Application method of soil nailing wall in deep foundation pit supporting
CN103306497A (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN207934055U (en) A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool
CN103510537A (en) Construction method combining tower crane foundation and building basement floor
CN112012762A (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN112761158A (en) Green construction method for integral outer wall (three-in-one) of reverse construction underground engineering steel concrete key pin occlusive row pile
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

CF01 Termination of patent right due to non-payment of annual fee