CN204151796U - 一种加筋生态混凝土护坡 - Google Patents

一种加筋生态混凝土护坡 Download PDF

Info

Publication number
CN204151796U
CN204151796U CN201420447303.3U CN201420447303U CN204151796U CN 204151796 U CN204151796 U CN 204151796U CN 201420447303 U CN201420447303 U CN 201420447303U CN 204151796 U CN204151796 U CN 204151796U
Authority
CN
China
Prior art keywords
concrete
eco
reinforcement
bank protection
protection according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420447303.3U
Other languages
English (en)
Inventor
仝利
张伟强
李红莲
赵红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Zhongke Kuntai Assembly Construction Technology Co ltd
Original Assignee
Shandong Runguo Ecological Technology Engineering Co Ltd
Qingdao Runguo Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Runguo Ecological Technology Engineering Co Ltd, Qingdao Runguo Science And Technology Development Co Ltd filed Critical Shandong Runguo Ecological Technology Engineering Co Ltd
Priority to CN201420447303.3U priority Critical patent/CN204151796U/zh
Application granted granted Critical
Publication of CN204151796U publication Critical patent/CN204151796U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型涉及一种加筋生态混凝土护坡,属于护坡工程、土工技术、生态修复工程领域。该加筋生态混凝土护坡包括坡顶、坡面和坡脚;所述坡顶设有水泥柱预置金属钩桩;所述坡面沿垂直于坡面的方向自下而上依次包括营养土工布、下层生态混凝土、土工格栅、上层生态混凝土、人工覆土和环保植物,所述营养土工布挂设在水泥柱预制金属钩桩上;所述坡脚挖有沟槽,沟槽内铺设填充物压紧。本实用新型将生态混凝土与柔性材料土工格栅交替压合,二者合为一体,增强了护坡工程的抗裂性能和抗沉降性能。所用营养土工布不仅具有反滤功能,而且有利于实现根系生态防护、防止水土流失,极大增强了护坡工程的抗冲刷性能和稳定性。

Description

一种加筋生态混凝土护坡
(一)技术领域
本实用新型属于护坡工程、土工技术、生态修复工程领域,特别涉及一种土工格栅加筋生态混凝土护坡。
(二)背景技术
护坡工程主要是防止道路、河流、大坝及蓄水池的倾斜面受冲刷,护坡工程分为传统护坡工程和生态护坡工程。
传统护坡工程护坡能力强,在设计上仅仅考虑到护坡的力学稳定性,其外观设计较为单调和生硬,与周边景观不协调,破坏了生态系统的平衡,不利于生态环境的保护和水土保持。为了克服传统护坡的缺陷,生态护坡工程应运而生。相对于传统护坡工程,生态护坡工程具有良好的植生功能,对阻止水土流失、土地荒漠化以及生物多样性减少有着明显效果。
然而生态护坡工程依然不可避免的需要使用混凝土,由于混凝土材料自身存在一些缺陷,如抗冲击能力差、易于收缩开裂等,尤其是混凝土材料易于收缩开裂的缺陷,使其抗渗、抗冻、抗化学腐蚀、抗钢筋腐蚀等性能收到很大影响。裂缝是混凝土结构物承载能力、耐久性降低的主要原因,会导致护坡工程坡面下沉,严重影响工程外观、使用功能和使用寿命。
土工格栅是一种重要的土工合成材料,常用作加筋土结构的筋材或复合材料的筋材等。相对于混凝土,土工格栅是一种柔性材料,可使筋材两侧的应力分布均匀,不仅起到“间接加固”作用,而且可以增强材料的柔韧性。
(三)实用新型内容
本实用新型要解决的技术问题是:提供一种加筋生态混凝土护坡,解决护坡工程抗裂性能差、抗沉降性能差的问题。
本实用新型的技术方案如下:
一种加筋生态混凝土护坡,包括坡顶、坡面和坡脚,其特征在于:所述坡顶设有水泥柱预置金属钩桩;所述坡面沿垂直于坡面的方向自下而上依次包括营养土工布、下层生态混凝土、土工格栅、上层生态混凝土、人工覆土和环保植物,所述营养土工布挂设在水泥柱预制金属钩桩上;所述坡脚挖有沟槽,沟槽内铺设填充物压紧。
所述水泥柱预制金属钩桩采用打桩或预埋方式打入地下,水泥柱预置金属钩桩的长度为1.0~1.5m。
所述营养土工布之间搭接缝合并用固定钉固定;营养土工布的两端采用锚杆固定,锚杆安装密度及长度根据当地土壤的实际情况经计算后决定;营养土工布的重量在300g/m2以上。
所述土工格栅孔格尺寸为30-120mm,强度在30N/m以上。
所述下层生态混凝土、土工格栅和上层生态混凝土三者总厚度为10-20cm。
所述填充物为格宾石笼或毛石砌筑。
作为优选的,所述人工覆土中还包含高分子团粒。
与现有技术相比,本实用新型土工格栅设在上下两层生态混凝土之间,生态混凝土与柔性材料土工格栅交替压合,二者合为一体,增强了护坡工程的抗裂性能和抗沉降性能。所用营养土工布透水性与透气性俱佳,不仅具有反滤功能,而且内含营养基质,有利于植物根系生长并在岩石层面深扎,从而达到根系生态防护、防止水土流失的效果。所用人工覆土中含高分子团粒,有利于植物生长,增强护坡的抗冲刷性。坡脚铺设填充物,更好地保证了护坡工程的稳定性。
(四)附图说明
图1为本实用新型加筋生态混凝土护坡的结构示意图。
图2为本实用新型加筋生态混凝土护坡坡面的剖面结构示意图。
图中,1、水泥柱预置金属钩桩,2、坡面,2-1、营养土工布、2-2、下层生态混凝土,2-3、土工格栅,2-4、上层生态混凝土,2-5人工覆土,2-6、环保植物,3、锚杆,4、固定钉,5、填充物。
(五)具体实施方式
以下结合附图和具体实施方式对本实用新型进行详细说明。
实施例1
参照图1、图2所示,本实用新型的一种加筋生态混凝土护坡,包括坡顶、坡面和坡脚,所述坡顶设有水泥柱预置金属钩桩;所述坡面沿垂直于坡面的方向自下而上依次包括营养土工布、下层生态混凝土、土工格栅、上层生态混凝土、人工覆土、环保植物,营养土工布挂设在水泥柱预制金属钩桩上;所述坡脚挖有沟槽,沟槽内铺设填充物压紧。
所述水泥柱预制金属钩桩采用打桩或预埋方式打入地下,水泥柱预置金属钩桩的长度为1.0~1.5m。
所述营养土工布之间搭接缝合并用固定钉固定,营养土工布的两端采用锚杆固定,锚杆安装密度及长度根据当地土壤的实际情况经计算后决定;营养土工布的重量在300g/m2以上。
所述土工格栅孔格尺寸为30-120mm,强度在30N/m以上。
所述人工覆土中还包含高分子团粒。
所述上层生态混凝土、土工格栅和下层生态混凝土三者总厚度为10-20cm。
所述填充物为格宾石笼或毛石砌筑。

Claims (9)

1.一种加筋生态混凝土护坡,包括坡顶、坡面和坡脚,其特征在于:所述坡顶设有水泥柱预置金属钩桩;所述坡面沿垂直于坡面的方向自下而上依次包括营养土工布、下层生态混凝土、土工格栅、上层生态混凝土、人工覆土和环保植物,所述营养土工布挂设在水泥柱预制金属钩桩上;所述坡脚挖有沟槽,沟槽内铺设填充物压紧。
2.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述水泥柱预制金属钩桩采用打桩或预埋方式打入地下。
3.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述水泥柱预置金属钩桩的长度为1.0~1.5m。
4.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述营养土工布之间搭接缝合并用固定钉固定;营养土工布两端采用锚杆固定,锚杆安装密度及长度根据当地土壤的实际情况经计算后决定。
5.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述营养土工布重量在300g/m2以上。
6.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述土工格栅孔格尺寸为30-120mm,强度在30N/m以上。
7.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述人工覆土中还包含高分子团粒。
8.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述下层生态混凝土、土工格栅和上层生态混凝土三者总厚度为10-20cm。
9.根据权利要求1所述的加筋生态混凝土护坡,其特征在于:所述填充物为格宾石笼或毛石砌筑。
CN201420447303.3U 2014-08-08 2014-08-08 一种加筋生态混凝土护坡 Expired - Lifetime CN204151796U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420447303.3U CN204151796U (zh) 2014-08-08 2014-08-08 一种加筋生态混凝土护坡

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420447303.3U CN204151796U (zh) 2014-08-08 2014-08-08 一种加筋生态混凝土护坡

Publications (1)

Publication Number Publication Date
CN204151796U true CN204151796U (zh) 2015-02-11

Family

ID=52509924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420447303.3U Expired - Lifetime CN204151796U (zh) 2014-08-08 2014-08-08 一种加筋生态混凝土护坡

Country Status (1)

Country Link
CN (1) CN204151796U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234061A (zh) * 2014-08-08 2014-12-24 青岛润国生态科技发展有限公司 一种加筋生态混凝土护坡及其施工方法
CN105178340A (zh) * 2015-09-30 2015-12-23 宏大国源(芜湖)资源环境治理有限公司 一种用于岩质边坡生态复绿的防冲刷结构及使用的混凝土材料
CN107165177A (zh) * 2017-06-19 2017-09-15 中国五冶集团有限公司 一种边坡支护施工方法
CN109168384A (zh) * 2018-07-31 2019-01-11 浙江普天园林建筑发展有限公司 一种利用园林植物进行干旱和半干旱地区水土流失防治方法
CN109440726A (zh) * 2018-12-27 2019-03-08 国家海洋局第二海洋研究所 已建硬质海堤生态架构体系及建造方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234061A (zh) * 2014-08-08 2014-12-24 青岛润国生态科技发展有限公司 一种加筋生态混凝土护坡及其施工方法
CN105178340A (zh) * 2015-09-30 2015-12-23 宏大国源(芜湖)资源环境治理有限公司 一种用于岩质边坡生态复绿的防冲刷结构及使用的混凝土材料
CN107165177A (zh) * 2017-06-19 2017-09-15 中国五冶集团有限公司 一种边坡支护施工方法
CN107165177B (zh) * 2017-06-19 2019-05-07 中国五冶集团有限公司 一种边坡支护施工方法
CN109168384A (zh) * 2018-07-31 2019-01-11 浙江普天园林建筑发展有限公司 一种利用园林植物进行干旱和半干旱地区水土流失防治方法
CN109168384B (zh) * 2018-07-31 2021-11-16 杭州市园林绿化股份有限公司 一种利用园林植物进行干旱和半干旱地区水土流失防治方法
CN109440726A (zh) * 2018-12-27 2019-03-08 国家海洋局第二海洋研究所 已建硬质海堤生态架构体系及建造方法

Similar Documents

Publication Publication Date Title
CN104234061A (zh) 一种加筋生态混凝土护坡及其施工方法
CN204151796U (zh) 一种加筋生态混凝土护坡
CN203403426U (zh) 膨胀土路堑边坡支护结构
CN106703044B (zh) 一种流塑状冲填土软弱地层放坡组合支护方法
CN101476466B (zh) 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN204849509U (zh) 一种抗震防沙的公路路基结构
CN107859055B (zh) 一种应用于岸坡防护的格宾挡墙施工方法
CN103334450B (zh) 一种带排水沟的桩柱预制板挡土墙的施工方法
CN205116214U (zh) 复合地基格宾挡墙结构
CN105274922A (zh) 一种修复塌方路基的抗滑键-钢管桩复合结构及方法
CN206693140U (zh) 一种水利工程护坡
CN113818402A (zh) 黏土心墙堆石坝的补强加固结构及其施工方法
CN111173006B (zh) 联合透水挡墙和触探式植筋带加固坡积土的生态护坡方法
CN201183955Y (zh) 边坡生态防护构造
CN210482362U (zh) 一种装配式刚、柔组合型弹性抗震加筋土挡墙
CN106703053A (zh) 一种加筋土排水复合型护坡结构的施工方法
CN202170498U (zh) 钢筋混凝土桩式堤
CN210507006U (zh) 一种道路路堤的高强钢丝网加筋材填筑结构
CN104818734B (zh) 防治全风化花岗岩边坡水毁破坏防排水系统及其施工方法
CN104695454A (zh) 一种陡边坡加固防护装置及其铺设方法
CN216275518U (zh) 黏土心墙堆石坝的补强加固结构
CN216445907U (zh) 一种城市内河堤防生态景观防护系统
KR101097055B1 (ko) 주철 판넬로 축조된 사방댐과 골막이 및 그 축조방법
CN209307794U (zh) 低洼沼泽地区吹填特细砂路基结构
CN204238176U (zh) 生态石笼网箱挡墙

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Tong Li

Inventor before: Tong Li

Inventor before: Zhang Weiqiang

Inventor before: Li Honglian

Inventor before: Zhao Hong

CB03 Change of inventor or designer information
CP01 Change in the name or title of a patent holder

Address after: Laoshan District of Shandong city of Qingdao province Hongkong 266000 Road No. 316 Nonghaiyuan No. 81 building 6 unit 202

Co-patentee after: Shandong Zhongke Kun Tai Technology Co.,Ltd.

Patentee after: QINGDAO RUNGUO SCIENCE AND TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: Laoshan District of Shandong city of Qingdao province Hongkong 266000 Road No. 316 Nonghaiyuan No. 81 building 6 unit 202

Co-patentee before: SHANDONG RUNGUO ECOLOGICAL TECHNOLOGY ENGINEERING Co.,Ltd.

Patentee before: QINGDAO RUNGUO SCIENCE AND TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20170807

Address after: 100083 Zhongguancun Haidian District East Road, No. 18, building 10, floor 1, A-1106-008,

Patentee after: Zhongke Kuntai Science and Technology Co.,Ltd.

Address before: Laoshan District of Shandong city of Qingdao province Hongkong 266000 Road No. 316 Nonghaiyuan No. 81 building 6 unit 202

Co-patentee before: Shandong Zhongke Kun Tai Technology Co.,Ltd.

Patentee before: QINGDAO RUNGUO SCIENCE AND TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211018

Address after: 266000 west of Yanqing first class road, Jiangshan Industrial Park, Jiangshan Town, Laixi City, Qingdao City, Shandong Province

Patentee after: QINGDAO ZHONGKE KUNTAI ASSEMBLY CONSTRUCTION TECHNOLOGY Co.,Ltd.

Address before: 100083 a-1106-008, 10th floor, building 1, 18 Zhongguancun East Road, Haidian District, Beijing

Patentee before: Zhongke Kuntai Science and Technology Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20150211

CX01 Expiry of patent term