A kind of regularization guard rail Download PDFInfo
- Publication number
- CN204139719U CN204139719U CN201420494725.6U CN201420494725U CN204139719U CN 204139719 U CN204139719 U CN 204139719U CN 201420494725 U CN201420494725 U CN 201420494725U CN 204139719 U CN204139719 U CN 204139719U
- Authority
- CN
- China
- Prior art keywords
- fixed
- bracing frame
- vertical bracing
- lacing wire
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of regularization guard rail, comprise vertical bracing frame, upper, lower horizontal lacing wire, connector, base and protective screening; Vertical bracing frame lower end is fixed on base, is fixed with upper, lower horizontal lacing wire between vertical bracing frame, and the outer end sidewall of vertical bracing frame is fixed with plural connector; Be fixed with protective screening between vertical bracing frame, upper, lower horizontal lacing wire, connector have interconnective syndeton; Base there is the syndeton with foundation ground.The utility model achieves regularization, tool, and specification relatively unification, is convenient to batch production; Its easy installation and removal, quick, reduce installation and removal labour intensity, decrease the input of the human and material resources of building operations, its structure is simple, the scope of application is wide, safety factor is high, can better provide safety guarantee; It can reduce construction cost effectively.
Description
Technical field
The utility model relates to a kind of guard rail being also applicable to functional regional division in field while meeting the security protection in Building Construction.
Background technology
Along with national market economy develops rapidly, Process of Urbanization Construction is accelerated, and high level, Super High are increasing, and the security protection in Building Construction, civilized construction need a large amount of economic inputs, human input and Technical investment.Specify according to " national construction safety check criteria " JGJ59-2011, do not build floor periphery and the foundation ditch surrounding of enclosure wall, steel pipe or mao bamboon should be adopted to set up twice guard rail, it is highly 40cm and 100cm.Traditional guard rail adopts steel pipe and all kinds of fastener association to form, and steel pipe, the fastener amount of use are large, and install, dismantle trouble, waste time and energy, construction cost is high; Its technique is coarse, and junction easily loosens, and poor stability, flexibility are low; When setting up, steel pipe outwardly, hinders current, and the personnel that easily cause collide scratch evil, poor stability.
Summary of the invention
The purpose of this utility model solves the above-mentioned problems in the prior art exactly, a kind of easy installation and removal, quick is provided, reduce installation and removal labour intensity, reusable, achieve regularization, tool, and specification relatively unification, be convenient to batch production, the regularization guard rail that safety factor is high.
For achieving the above object, technical solution of the present utility model is: a kind of regularization guard rail, comprises vertical bracing frame, upper, lower horizontal lacing wire, connector, base and protective screening; Vertical bracing frame lower end is fixed on base, is fixed with upper, lower horizontal lacing wire between vertical bracing frame, and the outer end sidewall of vertical bracing frame is fixed with plural connector; Be fixed with protective screening between vertical bracing frame, upper, lower horizontal lacing wire, connector have interconnective syndeton; Base there is the syndeton with foundation ground.
The utility model described above also comprises vertical rod end cap, and vertical rod end cap is spherical, and it is fixed on the upper end of vertical rod.The upper end of vertical rod is avoided to hurt sb.'s feelings.
The utility model described above also comprises middle girt, and middle girt is fixed between vertical bracing frame, between upper, lower horizontal lacing wire, near on girt one end, be fixed with perpendicular brace rod between upper, middle girt; Catch-phrase board can be fixed as required, during at this moment described protective screening is fixed on, between lower girt between upper, middle girt and perpendicular brace rod.
During use, multiple the utility model can be linked together by the connector on it, form construction protector, it achieves regularization, tool, and specification relatively unification, is convenient to batch production; Its easy installation and removal, quick, reduce installation and removal labour intensity, decrease the input of the human and material resources of building operations, its structure is simple, the scope of application is wide, safety factor is high, can better provide safety guarantee; It can reduce construction cost effectively.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
As shown in Figure 1, the present embodiment comprises vertical bracing frame 1, vertical rod end cap 5, upper, middle and lower girt 21,22 and 23, connector 3, base 4 and protective screening 6.Vertical bracing frame 1, the preferred square standpipe of upper, middle and lower girt 21,22 and 23, the preferably vertical high 1.2m of bracing frame 1, between level interval 1.5m.Vertical bracing frame 1 lower end is weldingly fixed on base 4, upper, middle and lower girt 21,22 and 23 is fixed with between vertical bracing frame 1, preferably, above, two girt 22 and 22 spacing 20cm in, therebetween be welded with two perpendicular brace rods 7, perpendicular brace rod 7 preferably square tube, size can be 140 × 40 × 3 cm, the vertical bracing frame 6cm of distance, can fix catch-phrase board 8 as required between upper, middle girt 21 and 22 and perpendicular brace rod 7.Upper and lower two girts 21 and 23 spacing 1m.The outer end sidewall of vertical bracing frame 1 is welded with two (also can according to highly needing to arrange 3 etc.) connectors 3, connector 3 has interconnective screw hole.Vertical bracing frame 1, in, be welded with protective screening 6 between lower girt 22 and 23.Base 4 has the screw connecting hole with foundation ground.Vertical rod end cap 5 is spherical, and it is fixed on the upper end of vertical rod.The syndeton of welding connects more reliable, and can not produce loosening of link position during its installation and removal, long service life, maintenance frequency is few.
Above-described embodiment is only preferred and exemplary, and those skilled in the art can also according to the description of this patent, and other equivalent technologies of choice for use, these all covered by the protection domain of this patent.
Claims (4)
1. a regularization guard rail, is characterized in that: comprise vertical bracing frame, upper, lower horizontal lacing wire, connector, base and protective screening; Vertical bracing frame lower end is fixed on base, is fixed with upper, lower horizontal lacing wire between vertical bracing frame, and the outer end sidewall of vertical bracing frame is fixed with plural connector; Be fixed with protective screening between vertical bracing frame, upper, lower horizontal lacing wire, connector have interconnective syndeton; Base there is the syndeton with foundation ground.
2. regularization guard rail according to claim 1, is characterized in that: it also comprises vertical rod end cap, vertical rod end cap is spherical, and it is fixed on the upper end of vertical rod.
3. regularization guard rail according to claim 1 and 2, it is characterized in that: it also comprises middle girt, middle girt is fixed between vertical bracing frame, between upper, lower horizontal lacing wire, near on girt one end, be fixed with perpendicular brace rod between upper, middle girt.
4. regularization guard rail according to claim 3, is characterized in that: between described upper, middle girt and perpendicular brace rod, be fixed with catch-phrase board, during described protective screening is fixed on, between lower girt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420494725.6U CN204139719U (en) | 2014-08-30 | 2014-08-30 | A kind of regularization guard rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420494725.6U CN204139719U (en) | 2014-08-30 | 2014-08-30 | A kind of regularization guard rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204139719U true CN204139719U (en) | 2015-02-04 |
Family
ID=52416414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420494725.6U Active CN204139719U (en) | 2014-08-30 | 2014-08-30 | A kind of regularization guard rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204139719U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105064708A (en) * | 2015-08-09 | 2015-11-18 | 朱金凤 | Protective guard for building construction |
-
2014
- 2014-08-30 CN CN201420494725.6U patent/CN204139719U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105064708A (en) * | 2015-08-09 | 2015-11-18 | 朱金凤 | Protective guard for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN201953005U (en) | Detachable protective railing | |
CN206054455U (en) | A kind of new electric hold hoop | |
CN204139719U (en) | A kind of regularization guard rail | |
CN203108026U (en) | High-voltage bus safety belt hanging support | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN204040556U (en) | A telescopic graduation two electronic box protection canopy | |
CN203746350U (en) | Pole board fixing frame of steel tube tower of circuits | |
CN203522016U (en) | Device for lifting overhead ground wire | |
CN203430009U (en) | Construction hanging basket | |
CN204983712U (en) | But socket joint round pin stationary height -adjusting protection canopy | |
CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
CN102916366B (en) | Scaffolding type motor-driven cutter mill | |
CN206319559U (en) | A kind of height can consecutive variations braced bar system | |
CN205591507U (en) | Scaffold frame of easily dismantling | |
CN204139585U (en) | A kind of scaffold | |
CN203961258U (en) | Builder's jack foot guard structure | |
CN204266607U (en) | A kind of high-voltage line protective frame | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN203609773U (en) | Anti-dropping device for work high above ground | |
CN202627472U (en) | Adjustable base of steel pipe scaffold | |
CN204299207U (en) | A kind of frame supported system | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN204098475U (en) | A kind of detachable steel frame plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP03 | Change of name, title or address |
Address after: 071051, 6, 54 West Road, Baoding, Hebei Province, No. 139 office building Co-patentee after: Hebei construction group Limited by Share Ltd Patentee after: Hebei Construction Group Tianchen Construction Engineering Co., Ltd. Address before: 071051, Hebei, Baoding Baoding New District 54 West Road, No. 139 office building 6 Co-patentee before: Heibei Construction Group Co., Ltd. Patentee before: Hebei Construction Group Tianchen Construction Engineering Co., Ltd. |