CN204139169U - A kind of multi-layer helical blade self-drilling soil anchor bolt - Google Patents
A kind of multi-layer helical blade self-drilling soil anchor bolt Download PDFInfo
- Publication number
- CN204139169U CN204139169U CN201420424442.4U CN201420424442U CN204139169U CN 204139169 U CN204139169 U CN 204139169U CN 201420424442 U CN201420424442 U CN 201420424442U CN 204139169 U CN204139169 U CN 204139169U
- Authority
- CN
- China
- Prior art keywords
- helical blade
- rod body
- anchor rod
- blade
- centimetres
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种锚杆,尤其涉及一种多层螺旋刀片自钻式土锚杆,属于钻挖锚固技术领域。 The utility model relates to an anchor rod, in particular to a multilayer helical blade self-drilling soil anchor rod, which belongs to the technical field of drilling and anchoring. the
背景技术 Background technique
对于埋设于地下水位较高场地中的建筑物地下室、地铁、地下商场、人防工事、大型水池、大坝底消浪池等建筑物或构筑物,既要承受结构自重,又要承受因地下水位高于坑底面而带来的浮力。当浮力大到足以克服建构筑物的重量时,就会发生上漂、倾斜或破坏,因此在结构设计时必须有效地控制浮力带来的有害竖向位移。 For buildings or structures buried in the basements of buildings with high groundwater levels, such as subways, underground shopping malls, civil air defense fortifications, large pools, and wave-dispelling pools at the bottom of dams, they must not only bear the weight of the structure, but also bear the impact caused by the high groundwater level. buoyancy on the bottom of the pit. When the buoyancy force is large enough to overcome the weight of the structure, floating, tilting or damage will occur, so the harmful vertical displacement caused by buoyancy must be effectively controlled in the structural design. the
目前抗浮设计在工程中应用广泛,主要采用抗浮桩和抗浮锚杆的方法,抗浮桩和抗浮锚杆均采用钢筋混凝土结构,由于钢筋强度低,因此其钢筋用量较大,造价高。施工工艺复杂,工期较长,且施工质量难以保证。另外,现阶段抗浮桩和抗浮锚杆均须在工程基础施工前进行,对于工期要求严格或地下室施工时间有特殊要求的情况下,例如:必须在旱季时施工,采用抗浮桩和抗浮锚杆已不能满足以上需求。 传统单层螺旋锚杆容易钻入土层,但锚固强度低,全长螺旋锚杆锚固强度高,但钻入土层困难,无法满足施工需求。 At present, the anti-floating design is widely used in engineering. The method of anti-floating piles and anti-floating anchors is mainly used. Both the anti-floating piles and anti-floating anchors are reinforced concrete structures. Due to the low strength of steel bars, the amount of steel bars used is relatively large, and the cost high. The construction process is complicated, the construction period is long, and the construction quality is difficult to guarantee. In addition, at this stage, anti-floating piles and anti-floating anchors must be carried out before the construction of the project foundation. In the case of strict construction period requirements or special requirements for basement construction time, for example: construction must be carried out during the dry season, anti-floating piles and anti-floating anchors must be used. Floating anchors can no longer meet the above requirements. The traditional single-layer helical anchor is easy to drill into the soil layer, but its anchoring strength is low. The full-length helical anchor has high anchoring strength, but it is difficult to drill into the soil layer, which cannot meet the construction needs. the
例如中国专利授权公开号为:CN203685063U,公告日为:2014年7月2日实用新型专利公开了一种螺旋钻杆及螺旋钻杆的进液装置,该进液装置包括与螺旋钻杆的杆体一体设置或者与杆体固连的进液管体,进液管体表面上开设有经其内孔与螺旋钻杆下料通道相通的进料口,螺旋钻杆在施工时,从孔口灌入的护壁液可经进液装置的进料口通过杆体的下料通道到达杆体下端所连的钻头底部,能在提钻杆时及时增补护壁液。但是该装置单一,钻入土层困难,而且锚固接触面积较小,抗拔力不足。 For example, the Chinese patent authorization publication number is: CN203685063U, and the announcement date is: July 2, 2014. The utility model patent discloses a kind of auger drill pipe and a liquid inlet device for the auger drill pipe. The liquid inlet pipe body is integrally arranged or connected with the rod body. The surface of the liquid inlet pipe body is provided with a feed port that communicates with the auger pipe feeding channel through its inner hole. During construction, the auger pipe is poured into the The protective wall fluid can reach the bottom of the drill bit connected to the lower end of the rod body through the feeding port of the liquid inlet device through the feeding channel of the rod body, so that the wall protection fluid can be replenished in time when the drill pipe is lifted. But this device is single, and it is difficult to drill into the soil layer, and the anchoring contact area is small, and the pullout resistance is insufficient. the
发明内容 Contents of the invention
本实用新型的目的是针对现有软土地区建筑物地下室底板抗浮工程中锚杆结构简单,锚固接触面积较小,抗拔力不足的缺陷和不足,现提供一种结构合理,施工方便,钻进效率高,锚固接触面积较大,抗拔力强的一种多层螺旋刀片自钻式土锚杆。 The purpose of this utility model is to aim at the defects and deficiencies of the existing anti-floating engineering of the basement floor of the building in the soft soil area, such as the simple structure of the anchor rod, the small anchoring contact area, and insufficient pull-out resistance, and now provides a reasonable structure and convenient construction. A multi-layer spiral blade self-drilling soil bolt with high drilling efficiency, large anchoring contact area and strong pull-out resistance. the
为实现本实用新型的目的,本实用新型的技术解决方案是:一种多层螺旋刀片自钻式土锚杆,包括前端锚杆杆体,前端锚杆杆体的前端为封闭的圆锥形,所述前端锚杆杆体靠近钻尖一端的外表面上设置有前端螺旋叶片,前端锚杆杆体的侧壁上且位于前端螺旋叶片附近开设有出浆孔,前端锚杆杆体的另一端通过螺纹连接部位与中段锚杆杆体的一端相连接,中段锚杆杆体的另一端通过连接套与加长锚杆的一端相连接,中段锚杆杆体为两根或两根以上,中段锚杆杆体的外表面上设置有螺旋叶片,前端螺旋叶片与螺旋叶片的螺旋方向相同,中段锚杆杆体的侧壁上且位于螺旋叶片附近开设有出浆孔。 In order to realize the purpose of this utility model, the technical solution of this utility model is: a kind of multilayer helical blade self-drilling soil bolt, comprising the front end bolt body, the front end of the front end bolt body is a closed conical shape, the A front-end helical blade is provided on the outer surface of the front-end anchor rod body close to the drill tip, and a slurry hole is provided on the side wall of the front-end anchor rod body near the front-end helical blade. The other end of the front-end anchor rod body is connected to the One end of the middle anchor rod body is connected, and the other end of the middle anchor rod body is connected with one end of the extended anchor rod through a connecting sleeve. There are two or more middle anchor rod bodies, and the outer surface of the middle anchor rod body is provided with The helical blade, the helical direction of the helical blade at the front end is the same as that of the helical blade, and a slurry outlet hole is opened on the side wall of the bolt body in the middle section near the helical blade. the
所前端锚杆杆体、中段锚杆杆体和末段锚杆杆体均采用无缝空心钢管,其直径为3厘米-7厘米。 The front end anchor rod body, the middle anchor rod body and the end anchor rod body are all made of seamless hollow steel pipes with a diameter of 3 cm to 7 cm. the
所述前端螺旋叶片为三道或三道以上螺旋叶片,前端螺旋叶片靠近钻尖一端的叶片外圆半径小于远离钻尖一端的叶片外圆半径,每道螺旋叶片之间的距离为12厘米-18厘米,前端螺旋叶片的叶片最大外圆半径为35厘米-60厘米,前端螺旋叶片的螺旋夹角为45度。 The front helical blades are three or more helical blades, the radius of the blade outer circle of the front end helical blade near the drill tip is smaller than the blade outer circle radius of the end far away from the drill tip, and the distance between each helical blade is 12 cm- 18 cm, the maximum outer circle radius of the front helical blade is 35 cm to 60 cm, and the helical angle of the front helical blade is 45 degrees. the
所述螺旋叶片为三道或三道以上螺旋叶片,相邻螺旋叶片之间的距离为80厘米-120厘米,螺旋叶片的叶片外圆半径为35厘米-60厘米,螺旋叶片的螺旋夹角为45度。 The spiral blades are three or more spiral blades, the distance between adjacent spiral blades is 80 cm-120 cm, the blade outer circle radius of the spiral blades is 35 cm-60 cm, and the spiral angle of the spiral blades is 45 degree. the
所述出浆孔为直径为0.5厘米-1.5厘米的圆孔,并且出浆孔均匀开设在前端锚杆杆体和中段锚杆杆体的外壁上。 The grout outlet is a circular hole with a diameter of 0.5 cm to 1.5 cm, and the grout outlet is evenly opened on the outer wall of the front end anchor rod body and the middle anchor rod rod body. the
本实用新型的有益效果是: The beneficial effects of the utility model are:
1、本实用新型采用前端锚杆杆体、中段锚杆杆体以及末段锚杆杆体连接组合而成,为了提高锚杆的长度,采用两根或两根以上的中段锚杆杆体依次对接而成,杆体上采用多道螺旋叶片提高了钻进效率。 1. The utility model is formed by connecting and combining the front end anchor rod body, the middle anchor rod body and the end anchor rod body. In order to increase the length of the anchor rod, two or more middle anchor rod bodies are sequentially butted together. The rod body adopts multiple helical blades to improve the drilling efficiency.
2、本实用新型结构合理,施工工期短、造价低,在软土地区该叶片有极强的穿透力,降低了钻进难度,同时采用本实用新型方式施工所形成的锚固体与传统的锚固体相比易于施工,施工工艺安全可靠,增大了接触面积,增强了锚固力,提高了施工效率和施工质量,保证其能更有效地提高锚杆在不同土层中的抗拔力,提高了抗浮工程的有效性。 2. The structure of the utility model is reasonable, the construction period is short, and the cost is low. In the soft soil area, the blade has a strong penetrating force, which reduces the difficulty of drilling. Compared with the anchor body, it is easier to construct, the construction process is safe and reliable, the contact area is increased, the anchoring force is enhanced, the construction efficiency and construction quality are improved, and it is guaranteed that it can more effectively improve the pullout force of the anchor rod in different soil layers. Improve the effectiveness of anti-floating works. the
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model. the
图2是图1中A-A的示意图。 Fig. 2 is a schematic diagram of A-A in Fig. 1 . the
图中:前端锚杆杆体1,中段锚杆杆体2,末段锚杆杆体3,前端螺旋叶片4-1,螺旋叶片4-2,出浆孔5,螺纹连接部位6,连接套7,加长锚杆8。 In the figure: the front end bolt body 1, the middle bolt body 2, the end bolt body 3, the front helical blade 4-1, the helical blade 4-2, the slurry hole 5, the threaded connection part 6, the connecting sleeve 7, lengthened Anchor 8. the
具体实施方式 Detailed ways
以下结合附图说明和具体实施方式对本实用新型作进一步的详细描述。 The utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. the
参见图1、图2,本实用新型的一种多层螺旋刀片自钻式土锚杆,包括前端锚杆杆体1,前端锚杆杆体1的前端为封闭的圆锥形,所述前端锚杆杆体1靠近钻尖一端的外表面上设置有前端螺旋叶片4-1,前端锚杆杆体1的侧壁上且位于前端螺旋叶片4-1附近开设有出浆孔5,前端锚杆杆体1的另一端通过螺纹连接部位6与中段锚杆杆体2的一端相连接,中段锚杆杆体2的另一端通过连接套7与加长锚杆8的一端相连接,中段锚杆杆体2为两根或两根以上,中段锚杆杆体2的外表面上设置有螺旋叶片4-2,前端螺旋叶片4-1与螺旋叶片4-2的螺旋方向相同,中段锚杆杆体2的侧壁上且位于螺旋叶片4-2附近开设有出浆孔5。 Referring to Fig. 1 and Fig. 2, a kind of multilayer helical blade self-drilling soil bolt of the present utility model comprises a front end bolt body 1, and the front end of the front end bolt body 1 is a closed conical shape, and the front end bolt body 1 There is a front-end helical blade 4-1 on the outer surface near the end of the drill tip, and a slurry hole 5 is opened on the side wall of the front-end anchor rod body 1 near the front-end helical blade 4-1. One end is connected to one end of the middle anchor rod body 2 through the threaded connection part 6, and the other end of the middle anchor rod body 2 is connected to one end of the extended anchor rod 8 through the connecting sleeve 7, and the middle anchor rod body 2 is two or two Above, the outer surface of the middle bolt body 2 is provided with a helical blade 4-2, the helical direction of the front end helical blade 4-1 is the same as that of the helical blade 4-2, and the side wall of the middle bolt body 2 is located on the helical blade 4. A pulp outlet 5 is opened near -2. the
所前端锚杆杆体1、中段锚杆杆体2和末段锚杆杆体3均采用无缝空心钢管,其直径为3厘米-7厘米。 The front end anchor rod body 1, the middle anchor rod body 2 and the end anchor rod body 3 are all made of seamless hollow steel pipes with a diameter of 3 cm to 7 cm. the
所述前端螺旋叶片4-1为三道或三道以上螺旋叶片,前端螺旋叶片4-1靠近钻尖一端的叶片外圆半径小于远离钻尖一端的叶片外圆半径,每道螺旋叶片之间的距离为12厘米-18厘米,前端螺旋叶片4-1的叶片最大外圆半径为35厘米-60厘米,前端螺旋叶片4-1的螺旋夹角为45度。 The front-end helical blade 4-1 is three or more than three helical blades, and the radius of the outer circle of the blade at the end of the front-end helical blade 4-1 near the drill tip is smaller than the radius of the outer circle of the blade at the end far away from the drill tip. The distance between them is 12 centimeters-18 centimetres, the maximum outer circle radius of the blade of the front end helical blade 4-1 is 35 centimeters-60 centimeters, and the helical angle of the front end helical blade 4-1 is 45 degrees. the
所述螺旋叶片4-2为三道或三道以上螺旋叶片,相邻螺旋叶片4-2之间的距离为80厘米-120厘米,螺旋叶片4-2的叶片外圆半径为35厘米-60厘米,螺旋叶片4-2的螺旋夹角为45度。 The spiral blade 4-2 has three or more spiral blades, the distance between adjacent spiral blades 4-2 is 80 cm-120 cm, and the radius of the blade outer circle of the spiral blade 4-2 is 35 cm-60 cm. cm, and the helical angle of the helical blade 4-2 is 45 degrees. the
所述出浆孔5为直径为0.5厘米-1.5厘米的圆孔,并且出浆孔5均匀开设在前端锚杆杆体1和中段锚杆杆体2的外壁上。 The slurry outlet hole 5 is a circular hole with a diameter of 0.5 cm-1.5 cm, and the slurry outlet hole 5 is evenly opened on the outer wall of the front end anchor rod body 1 and the middle anchor rod body 2 . the
参见图1,前端锚杆杆体1由无缝空心钢管制成,前端锚杆杆体1的前端为封闭的圆锥形,前端锚杆杆体1靠近钻尖一端的外表面上设置有前端螺旋叶片4-1。前端螺旋叶片4-1为三道或三道以上螺旋叶片,前端螺旋叶片4-1靠近钻尖一端的叶片外圆半径小于远离钻尖一端的叶片外圆半径,每道螺旋叶片之间的距离为12厘米-18厘米,前端螺旋叶片4-1的叶片最大外圆半径为35厘米-60厘米,前端螺旋叶片4-1的螺旋夹角为45度。前端锚杆杆体1的侧壁上且位于前端螺旋叶片4-1附近开设有出浆孔5,出浆孔5为圆孔形且均匀设置。 Referring to Fig. 1, the front end anchor rod body 1 is made of seamless hollow steel pipe, the front end of the front end anchor rod body 1 is a closed conical shape, and the front end helical blade 4- 1. The front end helical blade 4-1 is three or more than three helical blades, and the radius of the outer circle of the blade at the end of the front end helical blade 4-1 near the drill tip is smaller than the outer radius of the blade at the end far away from the drill tip, and the distance between each helical blade 12 cm-18 cm, the blade maximum outer circle radius of the front end helical blade 4-1 is 35 cm-60 cm, and the helical angle of the front end helical blade 4-1 is 45 degrees. On the side wall of the front-end anchor rod body 1 and near the front-end helical blade 4-1, a slurry outlet 5 is opened, and the slurry outlet 5 is round and uniformly arranged. the
中段锚杆杆体2由无缝空心钢管制成,中段锚杆杆体2的外表面上设置有螺旋叶片4-2,前端螺旋叶片4-1与螺旋叶片4-2的螺旋方向相同,中段锚杆杆体2的侧壁上且位于螺旋叶片4-2附近开设有出浆孔5。前端锚杆杆体1的末端通过螺纹连接部位6与中段锚杆杆体2的一端相连接,中段锚杆杆体2的另一端通过连接套7与加长锚杆8的一端相连接,为了进一步提高锚杆的整体长度,中段锚杆杆体2可以采用两根或两根以上依次对接而成。中段锚杆杆体2的侧壁上且位于螺旋叶片4-2附近开设有出浆孔5,出浆孔5为直径为0.5厘米-1.5厘米的圆孔,孔径不易太大,控制在1厘米左右可加大其喷射能力,也能防止钻进时土体堵塞出浆孔5。 The middle anchor rod body 2 is made of seamless hollow steel pipe. The outer surface of the middle anchor rod body 2 is provided with a spiral blade 4-2. A pulp outlet hole 5 is opened on the side wall of the rod body 2 and near the helical blade 4-2. The end of the front end anchor rod body 1 is connected to one end of the middle anchor rod body 2 through the threaded connection part 6, and the other end of the middle anchor rod body 2 is connected to one end of the extended anchor rod 8 through the connecting sleeve 7, in order to further improve the anchor rod The overall length of the anchor rod body 2 in the middle section can be formed by butting two or more rods in sequence. On the side wall of the middle anchor rod body 2 and near the helical blade 4-2, there is a slurry outlet 5. The slurry outlet 5 is a circular hole with a diameter of 0.5 cm to 1.5 cm. The aperture is not too large and should be controlled at about 1 cm. Can increase its ejection capacity, also can prevent soil mass from blocking the grout hole 5 when drilling. the
本实用新型的一种多层螺旋刀片自钻式土锚杆施工方法具体步骤如下:首先连接锚杆,前端锚杆杆体1的末端通过螺纹连接部位6与中段锚杆杆体2的一端相连接,中段锚杆杆体2的另一端通过连接套7与加长锚杆8的一端相连接,前端锚杆杆体1与加长锚杆8之间连接有一根或多根中段锚杆杆体2。随后接后的多层螺旋刀片土锚杆安装在锚杆钻机上,调整土锚杆的高度和转进角度。然后选定位置钻进,将前端锚杆杆体1的钻尖对准预定位置,启动锚杆钻机开始钻土,使得前端螺旋叶片4-1和螺旋叶片4-2全部进入土层中。当前端螺旋叶片4-1和螺旋叶片4-2全部进入土层后,将水泥浆通过土锚杆的中间空腔高压注入,使得水泥浆从出浆孔5喷射出来进入周围土层,锚杆到达预定深度后停止钻进,继续喷射水泥浆直至饱和。高压水泥浆挤压前端螺旋叶片4-1和螺旋叶片4-2周围的土体,使得水泥浆分别包裹螺旋叶片和锚杆,固化成串状的锚固体。 The specific steps of a multi-layer spiral blade self-drilling soil anchor construction method of the present utility model are as follows: first, the anchor is connected, and the end of the front end anchor body 1 is connected with one end of the middle anchor body 2 through the threaded connection part 6, The other end of the middle anchor rod body 2 is connected to one end of the extended anchor rod 8 through the connecting sleeve 7 , and one or more middle anchor rod rod bodies 2 are connected between the front end anchor rod body 1 and the extended anchor rod 8 . The multi-layer helical blade soil bolt that connects subsequently is installed on the rock bolt rig, and the height and the turning angle of the soil bolt are adjusted. Then the selected position is drilled, the drill point of the front end anchor rod body 1 is aimed at the predetermined position, and the start rock bolt rig starts to drill the soil, so that the front end helical blade 4-1 and the helical blade 4-2 all enter in the soil layer. After the front helical blade 4-1 and the helical blade 4-2 have all entered the soil layer, the cement slurry is injected through the middle cavity of the soil anchor rod under high pressure, so that the cement slurry is sprayed out from the grout hole 5 and enters the surrounding soil layer. Stop drilling after reaching the predetermined depth, and continue spraying cement slurry until saturated. The high-pressure cement slurry squeezes the soil around the front helical blade 4-1 and the helical blade 4-2, so that the cement slurry wraps the helical blade and the anchor rod respectively, and solidifies into a series of anchor bodies. the
本实用新型结构合理,施工工期短、造价低,在软土地区该叶片有极强的穿透力,降低了钻进难度。采用本实用新型方式施工所形成的锚固体与传统的锚固体相比易于施工,施工工艺安全可靠,增大了接触面积,增强了锚固力,提高了施工效率和施工质量,保证其能更有效地提高锚杆在不同土层中的抗拔力,抗浮工程的有效性。 The utility model has the advantages of reasonable structure, short construction period and low cost, and the blade has extremely strong penetrating power in soft soil areas, which reduces the difficulty of drilling. Compared with the traditional anchor body, the anchor body formed by the construction of the utility model is easier to construct, the construction technology is safe and reliable, the contact area is increased, the anchoring force is enhanced, the construction efficiency and construction quality are improved, and it is guaranteed to be more effective. It can greatly improve the pull-out resistance of anchor rods in different soil layers and the effectiveness of anti-floating projects. the
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420424442.4U CN204139169U (en) | 2014-07-30 | 2014-07-30 | A kind of multi-layer helical blade self-drilling soil anchor bolt |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420424442.4U CN204139169U (en) | 2014-07-30 | 2014-07-30 | A kind of multi-layer helical blade self-drilling soil anchor bolt |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204139169U true CN204139169U (en) | 2015-02-04 |
Family
ID=52415866
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420424442.4U Expired - Lifetime CN204139169U (en) | 2014-07-30 | 2014-07-30 | A kind of multi-layer helical blade self-drilling soil anchor bolt |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204139169U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104141305A (en) * | 2014-07-30 | 2014-11-12 | 武汉武大巨成结构股份有限公司 | Multi-layer spiral blade self-drilling-type soil anchor rod and constructing method thereof |
| CN105239569A (en) * | 2015-09-24 | 2016-01-13 | 河海大学 | Multi-section jointed recoverable screw enlarging-head anchor rod structure and construction method thereof |
| CN111691907A (en) * | 2020-07-31 | 2020-09-22 | 中建隧道建设有限公司 | Anchor rod for tunnel support |
-
2014
- 2014-07-30 CN CN201420424442.4U patent/CN204139169U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104141305A (en) * | 2014-07-30 | 2014-11-12 | 武汉武大巨成结构股份有限公司 | Multi-layer spiral blade self-drilling-type soil anchor rod and constructing method thereof |
| CN104141305B (en) * | 2014-07-30 | 2016-08-24 | 武大巨成结构股份有限公司 | A kind of multi-layer helical blade self-drilling type soil anchor bolt and construction method thereof |
| CN105239569A (en) * | 2015-09-24 | 2016-01-13 | 河海大学 | Multi-section jointed recoverable screw enlarging-head anchor rod structure and construction method thereof |
| CN111691907A (en) * | 2020-07-31 | 2020-09-22 | 中建隧道建设有限公司 | Anchor rod for tunnel support |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104141305B (en) | A kind of multi-layer helical blade self-drilling type soil anchor bolt and construction method thereof | |
| CN105041325B (en) | Construction method of high-tension water-rich extra-large-section weak breccia tunnel | |
| CN103993611B (en) | A kind of deep layer rotating spraying cement-soil plate and anchor pole combine the construction method of anti-floating pile raft structure | |
| CN201908308U (en) | Grouting sleeve valve pipe | |
| CN104695963B (en) | The construction method of subway tunnel crossing building in fragmentation rock stratum | |
| CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
| CN101929340A (en) | Pre-grouting advance support construction process for pipe shed of underground flat inclined roadway of coal mine | |
| CN102852141B (en) | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation | |
| CN203248178U (en) | Downward-hole self-drilling grouting anchor rod | |
| CN103422501A (en) | Anti-floating anchor structure in sand layer geology and construction method thereof | |
| CN104963351A (en) | Reinforced structure for reinforcing treatment of artificial filled soil slopes and construction method thereof | |
| CN105422150B (en) | A kind of FRP sprinkler irrigation combination bolt | |
| CN101560775A (en) | Composite soil nailing wall structure | |
| CN102587366A (en) | Self-drilling type spiral anchor rod and construction process using self-drilling type spiral anchor rod for grouting along with drilling, stirring and curing | |
| CN209585066U (en) | Mine refuse dump side slope drainage system | |
| CN101603311A (en) | The adopting heavy hammer-tamping compaction soil preformed hole jet grouting pile construction method | |
| CN208136918U (en) | A kind of tubular type Soil-Nailing Wall Structure | |
| CN206928688U (en) | Closely the ruggedized construction of building is worn in side to a kind of shield tunnel | |
| CN203866852U (en) | Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod | |
| CN213088001U (en) | Double-layer well wall lining structure of pressure pipeline shaft | |
| CN206308687U (en) | A kind of precast pile | |
| CN109322624B (en) | Anchoring hole bottom reaming device | |
| CN103711130B (en) | Portal frame type bamboo joint mortar pile enclosure structure and construction method thereof | |
| CN107254872A (en) | Pile for prestressed pipe stake bottom floating sealing device and its control method | |
| CN207080242U (en) | Cup-type horizontal reinforcement structure of bamboo reinforcement grouting anchor rod at the end of shield tunnel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 430223 Hubei city of Wuhan province East Lake Development Zone Wuhan University Science Park Road No. 4 Patentee after: WUDA JUCHENG STRUCTURE Co.,Ltd. Address before: 430223 Hubei city of Wuhan province East Lake Development Zone Wuhan University Science Park Road No. 4 Patentee before: WUDA JUCHENGSTRUCTURE Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150204 |