CN111364532B - Existing pile foundation reinforcement method based on slurry control - Google Patents

Existing pile foundation reinforcement method based on slurry control Download PDF

Info

Publication number
CN111364532B
CN111364532B CN202010212426.9A CN202010212426A CN111364532B CN 111364532 B CN111364532 B CN 111364532B CN 202010212426 A CN202010212426 A CN 202010212426A CN 111364532 B CN111364532 B CN 111364532B
Authority
CN
China
Prior art keywords
grouting
pile foundation
slurry
area
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010212426.9A
Other languages
Chinese (zh)
Other versions
CN111364532A (en
Inventor
张健
丁何杰
刘传孝
段同军
张乾青
高强
郑帅
王绍磊
程广坦
李强
唐亮
王丙旭
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Agricultural University
Original Assignee
Shandong Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Agricultural University filed Critical Shandong Agricultural University
Priority to CN202010212426.9A priority Critical patent/CN111364532B/en
Publication of CN111364532A publication Critical patent/CN111364532A/en
Application granted granted Critical
Publication of CN111364532B publication Critical patent/CN111364532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present disclosure provides a slurry control-based existing pile foundation reinforcement method, which relates to the field of pile foundation construction, wherein a certain number of drill holes are arranged around an existing pile foundation, and a double pipe is lowered, wherein a water pipe and a slurry pipe are arranged in the double pipe; arranging a water injection nozzle and a grouting head at the bottom of the double pipe, and respectively communicating corresponding supply ends through pipelines; the water injection nozzle outputs high-pressure water flow to disturb soil body towards the existing pile foundation to form a softened reinforcing area; the grouting head performs low-pressure grouting to the softened area, so that the flow range of the slurry is easy to control, the reinforced area is filled and compacted, the reinforced area is reinforced to the ground section by section, the method is repeated to perform drilling and reinforcing one by one, a circumferential closed reinforcing ring is formed on the pile body, the problem that the slurry is uncontrollable in the traditional grouting method is solved, the effective rate of the slurry is improved, the bearing capacity of the existing pile foundation is improved, the settlement of the pile top is reduced, and the effective reinforcement of the existing pile foundation is realized more simply.

Description

Existing pile foundation reinforcement method based on slurry control
Technical Field
The disclosure relates to the field of pile foundation construction, in particular to an existing pile foundation reinforcing method based on slurry control.
Background
The statements in this section merely provide background information related to the present disclosure and may not necessarily constitute prior art.
Pile foundations are important foundation types of various buildings and bridges, pile foundations are deeply buried underground, and various diseases are easy to occur, such as defects in construction quality, corrosion of reinforcing steel bars, erosion and spalling of concrete, erosion of soil around piles, large horizontal displacement of pile foundations and other different diseases; the conditions of structural damage, bearing performance damage and the like occur in a large number of in-service pile foundation projects, and reinforcement and maintenance are needed. The existing pile foundation in the reconstruction and expansion project can improve bearing capacity, reduce sedimentation, can be recycled, saves energy, reduces emission and reduces investment after grouting and reinforcement.
The inventor finds that the existing pile foundation strengthening method mainly comprises a pile supplementing method, an anchor rod static pile, a root pile method, a grouting strengthening method and the like, but the strengthening method mainly comprises post grouting strengthening around a newly built pile foundation to improve the bearing capacity of the pile foundation, the research on grouting strengthening of the existing pile foundation is still lacking, the slurry flow is related to rock-soil permeability, strength, grouting pressure and the like, the slurry is not easy to control, the slurry efficiency is low, slurry waste is caused, and the grouting quality cannot be ensured; in the grouting reinforcement process of the existing pile foundation, grout gradually fills along soil gaps, the grouting body can promote pile side resistance of the pile, but the reinforcement performance is limited, the contact area of the grout and the pile body is limited, and the bearing characteristic of the pile foundation is difficult to effectively improve.
Disclosure of Invention
The purpose of the present disclosure is to provide a slurry control-based existing pile foundation reinforcement method, which is to firstly disturb soil mass around a pile and at a certain range of a pile bottom through high-pressure water flow to form a reinforcement area, then to fill and solidify the reinforcement area by injecting slurry at low pressure, so as to prevent the slurry from flowing out of the reinforcement area, the slurry directly contacts with the side wall of the pile foundation, and form a closed reinforcement body for the pile foundation in the circumferential direction, thereby realizing effective reinforcement of the pile foundation more simply and conveniently.
In order to achieve the above purpose, the following technical scheme is adopted:
an existing pile foundation reinforcement method based on slurry control comprises the following steps:
drilling holes around the existing pile foundation and lowering a double pipe;
arranging a water injection pipe and a grouting pipe in the double pipe, wherein the water injection pipe and the grouting pipe are respectively communicated with a water injection nozzle and a grouting head and are respectively communicated with corresponding supply ends through pipelines;
the water injection nozzle firstly outputs high-pressure water flow to disturb soil towards the existing pile foundation to form a disturbance area;
the grouting head performs low-pressure grouting towards the disturbance area and controls the slurry flow to fill the disturbance area;
and reinforcing the pile foundation after the slurry is solidified.
Further, a plurality of the drill holes are uniformly distributed along the circumferential direction of the pile foundation and are used for enabling the disturbance area to surround the pile foundation and form a set reinforcement thickness.
Further, each drilling hole is matched with a double pipe, and the double pipes are respectively correspondingly matched with a water injection nozzle and a grouting head, and respectively disturb soil body and static grouting towards the pile body.
Further, the water injection nozzle disturbs soil body to the pile body, the grouting head performs grouting to fill the disturbation area, slurry is tightly combined with the pile body to form a reinforcing body, and the double pipe corresponding to each drilling hole forms a sector reinforcing area ranging from the drilling hole to the pile body.
Further, a plurality of boreholes are sequentially constructed along the circumferential direction of the pile foundation, grouting reinforcement areas between adjacent double pipes are mutually intersected, and a closed reinforcement area is formed together to surround the existing pile foundation.
Further, the water injection nozzle swings in the horizontal direction to output high-pressure water flow, and meanwhile, the water injection nozzle gradually rises in height along the axial direction of the drilling hole until reaching the ground, so that a reinforcing area filled with slurry is formed.
Further, in the process of outputting the slurry by the slurry injection head, the water injection nozzle stops injecting water, and is used as a water drain pipe to discharge gas and water in the reinforced area, and after the slurry flows out, the water drain pipe is closed and the slurry injection is continued until the disturbance area is completely filled.
Further, the soil body disturbance and grouting process are sequentially carried out along the axial section of the drill hole, and grouting is carried out after soil body disturbance is carried out on each section.
Further, the reinforced area covers the disturbed soil around the pile foundation.
Compared with the prior art, the present disclosure has the advantages and positive effects that:
(1) Firstly, disturbing soil body by high-pressure water flow swing spraying to form a reinforcing area, and then, outputting slurry by low pressure to enable the slurry to flow in a swing spraying range and gradually fill the reinforcing area, so that the existing pile foundation is reinforced, on the other hand, the problems that the high-pressure grouting slurry flow and the reinforcing area are uncontrollable in the surrounding soil body directly by the traditional reinforcing method are solved, the reinforcing area formed by disturbance forms guide on the slurry flow, the controllability of the whole grouting process is improved, and the grouting effective rate is improved;
(2) The multiple drill holes are distributed around the pile foundation, the pile foundation is constructed sequentially along the pile circumference, the disturbance range is enlarged to surround the whole pile foundation, the pile foundation is reinforced from the circumferential direction, the reinforced areas among the drill holes are crossed, an integral reinforced structure is formed, and the stability of the pile foundation and the strength of the reinforced part are further improved;
(3) The water flow is disturbed to the pile body, after grouting, the slurry contacts the pile foundation and is wrapped in a circumferential direction, so that the contact area between the reinforced slurry and the pile foundation is increased, the connection strength between the reinforced part and the existing pile foundation is improved, the reinforced part and the pile foundation are tightly combined into a whole, the diameter of the pile foundation is increased, and the friction between the reinforced part and surrounding soil is improved;
(4) Soil is disturbed in a' first disturbance and then grouting is carried out in a grouting mode under low pressure, and the grouting under low pressure enables slurry to be fully distributed in a disturbance area, so that uncertainty of slurry diffusion in a traditional grouting method is avoided, unnecessary slurry output is reduced, effective control of slurry distribution is achieved, and full-section reinforcement is achieved by matching with a cross area formed by adjacent grouting pipes.
Drawings
The accompanying drawings, which are included to provide a further understanding of the disclosure, illustrate and explain the exemplary embodiments of the disclosure and together with the description serve to explain the disclosure, and do not constitute an undue limitation on the disclosure.
FIG. 1 is a schematic diagram of a connection between a double pipe and a nozzle in embodiment 1 of the present disclosure;
fig. 2 is a schematic diagram showing the relative positions of a double pipe and an existing pile foundation according to embodiment 1 of the present disclosure.
In the figure, 1-double tube; 2-water injection nozzle; 3-grouting heads; 4-pile foundation; 5-drilling; 6-grouting reinforcement area.
Detailed Description
It should be noted that the following detailed description is illustrative and is intended to provide further explanation of the present disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this disclosure belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments in accordance with the present disclosure. As used herein, the singular is also intended to include the plural unless the context clearly indicates otherwise, and furthermore, it is to be understood that the terms "comprises" and/or "comprising" when used in this specification are taken to specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof;
for convenience of description, the words "upper", "lower", "left" and "right" in this disclosure, if used, merely denote an upper, lower, left, and right direction consistent with the accompanying drawings, and do not limit the structure, but merely facilitate description of the invention and simplify description, without indicating or implying that the apparatus or elements being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present disclosure.
As described in the background art, the prior art still lacks research on grouting reinforcement of the existing pile foundation, and as slurry flow is related to permeability, strength, grouting pressure and the like of rock and soil, slurry diffusion in a stratum is not easy to control, slurry efficiency is low, slurry waste is caused, and grouting design indexes are often not reached; in the conventional method, slurry is filled and extruded along soil gaps in the process of grouting and reinforcing the existing pile foundation, the slurry extends in a direction related to the soil gaps, the pile can possibly be backed up, the strength of the soil around the mixed soil lifting pile is limited, the contact area between the grouting body and the pile body is limited, the bearing performance of the pile foundation is difficult to effectively improve, and the present disclosure provides an existing pile foundation reinforcing method based on slurry control.
Example 1
In an exemplary embodiment of the present disclosure, as shown in fig. 1-2, an existing pile foundation reinforcement method based on slurry control is presented.
Determining a pile foundation 4 to be reinforced, determining a reinforcing range of the pile foundation according to engineering requirements, drilling a plurality of drill holes 5 around the existing pile foundation according to the reinforcing range, and lowering a double pipe 1 into the drill holes;
arranging a corresponding water injection nozzle 2 and a grouting head 3 at the bottom of the double pipe, wherein the water injection nozzle is connected with a high-pressure water flow supply end through a water injection pipeline, and the grouting head is connected with a slurry supply end through a grouting pipeline;
dividing the grouting reinforcement process of each drilling hole into a plurality of sections, and performing water injection disturbance and grouting on each section respectively;
the water injection nozzle firstly outputs high-pressure water flow to disturb soil body towards the existing pile foundation, and gradually lifts the water injection nozzle along the axial direction of the pile foundation to form a three-dimensional reinforcing area; the water content of the disturbance area is larger at the moment;
the grouting head is arranged at the bottom of the disturbance area and outputs low-pressure slurry towards the existing pile foundation, and the water body in the reinforcement area is extruded and discharged by the slurry until the slurry fills the whole reinforcement area;
after the reinforcement process of the section is finished, the water injection nozzle and the grouting head are lifted upwards to the next section, then the processes of water injection disturbance soil mass to form a reinforcement area and grouting gradual filling of the reinforcement area are sequentially carried out until the reinforcement area reaches the ground, and the grouting reinforcement process in the drilling hole is finished;
and (3) carrying out the same grouting process on the next drilling hole until all the drilling holes are subjected to grouting reinforcement, and circumferentially forming reinforcement on the pile foundation to form an integral grouting reinforcement area 6.
The soil body is disturbed by water injection to form a reinforced area, and then the reinforced area is filled by grouting, so that the reinforced range can be effectively controlled, and the effectiveness of the slurry is improved; the problem that the slurry flow direction is uncontrollable caused by the traditional high-pressure grouting is solved, the soil body is disturbed by water flow, the slurry is guided to flow and fill in the reinforcing area, the filling range of the slurry is controlled, and the pertinence and the effectiveness of the existing pile foundation reinforcement are improved.
Further, a plurality of drill holes are uniformly distributed around the pile foundation to form a surrounding of the pile foundation; when the number of the drilled holes is specifically selected, the number of the holes is selected according to the size of the diameter of the reinforced pile and the distance between the drilled holes and the side face of the pile body, and the number of the holes is adaptively increased along with the increase of the diameter of the pile foundation;
of course, it will be appreciated that for the same pile foundation, as few openings as possible can reduce the cost and time of drilling, but that fewer openings also require greater pressure to be provided to the water injection head and the grouting head, and thus a greater working range, to obtain sufficient reinforcement area.
In this embodiment, as shown in fig. 2, three holes are arranged around the pile, and the swing angles of the water injection nozzles are 120 °, so that the reinforced area forms an area with a hexagonal section;
in other possible embodiments, four drilling holes can be arranged, four double pipes are arranged, and the swing angles of the water injection nozzles are 90 degrees, so that the reinforced area forms an area with a quadrilateral cross section; the swing spraying angle of the water injection nozzle can be 135 degrees, so that the reinforced area forms an area with an octagonal section;
in some other possible implementation manners, the cross-sectional shape of the reinforced area to be formed can be selected according to the requirement, other numbers of the drill holes can be selected, the swing spraying angle of the drill holes is determined according to the cross-sectional shape of the reinforced area to be formed, the number of the drill holes is selected, the corresponding swing angle is set according to the requirement, and the set number of the drill holes is more than or equal to three, and is not repeated here.
Further, the double pipe bottom is matched with a water injection nozzle and a grouting head, high-pressure water flow and low-pressure slurry are respectively injected towards the pile body, the water injection nozzle disturbs soil body to the surface of the pile body, reinforcement areas between adjacent drilling holes are mutually intersected, and the reinforcement areas formed together surround the circumferential direction of the existing pile foundation to form an integral reinforcement area, so that the bearing performance of the pile foundation is further improved.
It can be understood that the coverage of the water injection nozzle and the grouting head needs to be calculated in advance, so that the disturbance ranges of the water injection nozzles in the configured multiple drilling holes can be mutually crossed, and the reinforcing area formed jointly can surround the existing pile foundation, thereby avoiding the phenomenon that the reinforcing area is not overlapped or the reinforcing thickness of the local pile side is insufficient, and affecting the integral reinforcing effect.
Further, the swinging of the water injection nozzle and the grouting head is in the horizontal direction, soil is disturbed in the swinging process, and the height of the nozzle needs to be gradually lifted along with the continuous swinging of the nozzle, so that the range of the disturbed soil is gradually enlarged by the nozzle, and a three-dimensional reinforcing area is gradually formed; after the soil body is disturbed by high-pressure water flow, in the grouting process, a water injection pipe in the double pipe is used as a water drainage pipe and an exhaust pipe, gas and water in the disturbed area are discharged out of the ground, the water injection pipe is sealed after cement slurry flows out, and grouting pressure is applied to meet the design requirement;
in the process of disturbing the soil body, as the distance between the reinforcing height and the vertical direction is larger, if the soil body is completely disturbed, the soil body around the drill hole can be loosened and collapsed, so in the embodiment, the soil body is selected to be partly disturbed to form a reinforcing area, then the section is subjected to grouting, and after the section is subjected to grouting, the next section is subjected to disturbance and grouting, so that the next section is gradually subjected to the lifting;
in the process of gradual grouting, the space for forming the reinforced area at the same time is only one section, so that the influence on surrounding soil is reduced, and the operability in the grouting process is improved; the reinforcing effect of each section can be guaranteed through sectional grouting, the slurry of the shorter section can be fully filled and extruded, the internal air bubble and other structures are reduced, and the strength after solidification and molding is guaranteed.
The foregoing description of the preferred embodiments of the present disclosure is provided only and not intended to limit the disclosure so that various modifications and changes may be made to the present disclosure by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present disclosure should be included in the protection scope of the present disclosure.

Claims (3)

1. The existing pile foundation reinforcement method based on slurry control is characterized by comprising the following steps of:
drilling holes around the existing pile foundation and lowering a double pipe;
arranging a water injection pipe and a grouting pipe in the double pipe, wherein the water injection pipe and the grouting pipe are respectively communicated with a water injection nozzle and a grouting head and are respectively communicated with corresponding supply ends through pipelines;
dividing the grouting reinforcement process of each drilling hole into a plurality of sections, and performing water injection disturbance and grouting on each section respectively; the water injection nozzle firstly outputs high-pressure water flow towards the existing pile foundation to disturb soil, and swings in the horizontal direction to output high-pressure water flow, and gradually rises in height along the axial direction of the drilling hole to form a reinforcing area filled with slurry, namely a disturbance area;
the grouting head performs low-pressure grouting towards the disturbance area and controls the flow of slurry, and in the process of outputting the slurry, the water injection nozzle stops injecting water and is used as a water drain pipe to drain gas and water in the reinforcement area, and after the slurry flows out, the water drain pipe is closed and grouting is continued until the disturbance area is completely filled; the soil body disturbance and grouting processes are sequentially carried out along the axial section of the drill hole, and grouting is carried out after soil body disturbance is carried out on each section; reinforcing pile foundation after the slurry is solidified and formed; until reaching the ground, completing the grouting reinforcement process in the drilling hole;
the multiple drill holes are uniformly distributed along the circumferential direction of the pile foundation and are used for enabling the disturbance area to surround the pile foundation and form a set reinforcement thickness;
the reinforcing thickness, namely, the sector reinforcing area ranging from the drilled hole to the pile body is formed by taking the double pipe corresponding to each drilled hole as the center, the section shape of the reinforcing area is selected according to the requirement, the number of the drilled holes is selected, the corresponding swinging angles are set according to the section shape of the reinforcing area, and the setting number of the drilled holes is more than or equal to three;
the water injection nozzle disturbs soil body to the pile body, the grouting head performs grouting to fill the disturbs area, and the slurry is tightly combined with the pile body to form a reinforcing body.
2. The slurry control-based existing pile foundation reinforcement method of claim 1, wherein a plurality of boreholes are sequentially constructed in the circumferential direction of the pile foundation, and grouting reinforcement areas between adjacent double pipes are intersected with each other to form a closed reinforcement area together to surround the existing pile foundation.
3. The existing pile foundation reinforcing method based on slurry control as claimed in claim 1, wherein the gas and water in the disturbance area are discharged out of the ground through the water injection pipe in the double pipe in the grouting process, the water injection pipe is closed after the cement slurry is exposed, and grouting pressure is applied to meet the design requirement.
CN202010212426.9A 2020-03-24 2020-03-24 Existing pile foundation reinforcement method based on slurry control Active CN111364532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010212426.9A CN111364532B (en) 2020-03-24 2020-03-24 Existing pile foundation reinforcement method based on slurry control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010212426.9A CN111364532B (en) 2020-03-24 2020-03-24 Existing pile foundation reinforcement method based on slurry control

Publications (2)

Publication Number Publication Date
CN111364532A CN111364532A (en) 2020-07-03
CN111364532B true CN111364532B (en) 2023-11-17

Family

ID=71204721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010212426.9A Active CN111364532B (en) 2020-03-24 2020-03-24 Existing pile foundation reinforcement method based on slurry control

Country Status (1)

Country Link
CN (1) CN111364532B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927334A (en) * 2020-07-28 2020-11-13 山东省路桥集团有限公司 Integrated construction device and construction method for reinforcing existing pile foundation based on slurry control
CN112681299A (en) * 2020-12-22 2021-04-20 山东农业大学 Existing pile foundation grouting reinforcement hole sealing device and using method
CN114439001A (en) * 2022-01-28 2022-05-06 山东大学 In-service pile foundation grouting reinforcement material and pile side directional grouting reinforcement method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296240A (en) * 1995-04-26 1996-11-12 Kajima Corp Construction method for earthquake-resisting reinforcement of existing foundation
CN1487150A (en) * 2003-04-16 2004-04-07 广东省建筑科学研究院 Combined grouting construction process of reinforcing foundation
CN1944809A (en) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 Three pipe double high pressure rotary jet sprouting reinforced construction method and its equipment
KR20100025959A (en) * 2008-08-28 2010-03-10 문동춘 Enlarged concrete consolidation grouting apparatus, grouting method using thereof
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN205171496U (en) * 2015-10-27 2016-04-20 南阳市水利建筑勘测设计院 Foundation stabilization high pressure jet slip casting device
CN206768813U (en) * 2017-03-29 2017-12-19 江苏九如建设有限公司 Grouting behind shaft or drift lining pile for prestressed pipe
CN108678041A (en) * 2018-05-23 2018-10-19 山东大学 A kind of existing Bearing Capacity of Pile Foundation slip casting method for improving
CN109322337A (en) * 2018-11-13 2019-02-12 上海市基础工程集团有限公司 Cast-in-situ bored pile pile body defect-restoration method therefor
CN109853538A (en) * 2018-12-12 2019-06-07 湖南化工地质工程勘察院有限责任公司 Cast-in-place concrete pile pile foundation reinforcing structure and its construction method
CN110438985A (en) * 2019-07-26 2019-11-12 湖南化工地质工程勘察院有限责任公司 Cast-in-situ bored pile pile foundation supporting course reinforcing construction method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296240A (en) * 1995-04-26 1996-11-12 Kajima Corp Construction method for earthquake-resisting reinforcement of existing foundation
CN1487150A (en) * 2003-04-16 2004-04-07 广东省建筑科学研究院 Combined grouting construction process of reinforcing foundation
CN1944809A (en) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 Three pipe double high pressure rotary jet sprouting reinforced construction method and its equipment
KR20100025959A (en) * 2008-08-28 2010-03-10 문동춘 Enlarged concrete consolidation grouting apparatus, grouting method using thereof
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN102691296A (en) * 2012-05-22 2012-09-26 广州市建筑科学研究院有限公司 Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN205171496U (en) * 2015-10-27 2016-04-20 南阳市水利建筑勘测设计院 Foundation stabilization high pressure jet slip casting device
CN206768813U (en) * 2017-03-29 2017-12-19 江苏九如建设有限公司 Grouting behind shaft or drift lining pile for prestressed pipe
CN108678041A (en) * 2018-05-23 2018-10-19 山东大学 A kind of existing Bearing Capacity of Pile Foundation slip casting method for improving
CN109322337A (en) * 2018-11-13 2019-02-12 上海市基础工程集团有限公司 Cast-in-situ bored pile pile body defect-restoration method therefor
CN109853538A (en) * 2018-12-12 2019-06-07 湖南化工地质工程勘察院有限责任公司 Cast-in-place concrete pile pile foundation reinforcing structure and its construction method
CN110438985A (en) * 2019-07-26 2019-11-12 湖南化工地质工程勘察院有限责任公司 Cast-in-situ bored pile pile foundation supporting course reinforcing construction method

Also Published As

Publication number Publication date
CN111364532A (en) 2020-07-03

Similar Documents

Publication Publication Date Title
CN102418344B (en) Injector, drill bit combination structure and combination drilling tool
CN110056369B (en) Construction method for entrance and exit hole of tunnel
CN111364532B (en) Existing pile foundation reinforcement method based on slurry control
CN108677924B (en) Double-row miniature steel pipe pile grouting wall-forming partition structure and method
WO2022100346A1 (en) Reinforcement structure for entry and exit of large-diameter jacking pipe group in water-rich sand stratum, and construction method
CN105909268B (en) Prestressing combination formula well tunnel modular structure construction method and modular structure
CN104695963A (en) Construction method for subway tunnel penetrating through building in fractured rock stratum
CN111997624A (en) Shallow-buried large-section underground excavation rectangular tunnel construction method
CN103669346A (en) Sleeve valve pipe and application to landslide control
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN110700853A (en) Shallow soil covering shield tunnel reinforcing method based on weak stratum
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN102220764B (en) Construction method of deep foundation pit bracing system
CN205917713U (en) Truss -like steel pipe slip casting pile foundation
CN105239566B (en) Multi-head stirring type large-diameter cast-in-situ pipe pile device and application thereof
CN217518646U (en) Barrier removing tunnel structure for passing through existing station
CN216664152U (en) Water sealing structure for anchorage support
CN215718763U (en) Shield constructs end reinforced structure
CN201883453U (en) Combined pipe jacking working well
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN113464150A (en) Shield end reinforcing structure and reinforcing construction method
CN208039234U (en) A kind of engineering pile in solution cavity geology
CN106088762A (en) The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate
CN201605578U (en) Water-stop consolidation equipment for filling pile soil mass
CN109778846A (en) A kind of advance support of underground excavation and enclosed construction and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant