CN204126353U - A kind of steel tube tower being convenient to install - Google Patents

A kind of steel tube tower being convenient to install Download PDF

Info

Publication number
CN204126353U
CN204126353U CN201420578647.8U CN201420578647U CN204126353U CN 204126353 U CN204126353 U CN 204126353U CN 201420578647 U CN201420578647 U CN 201420578647U CN 204126353 U CN204126353 U CN 204126353U
Authority
CN
China
Prior art keywords
steel pipe
pedal
convenient
tube tower
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420578647.8U
Other languages
Chinese (zh)
Inventor
杜士明
邢志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAIWU LUNENG KAIYUAN IRON TOWER Co Ltd
Original Assignee
LAIWU LUNENG KAIYUAN IRON TOWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAIWU LUNENG KAIYUAN IRON TOWER Co Ltd filed Critical LAIWU LUNENG KAIYUAN IRON TOWER Co Ltd
Priority to CN201420578647.8U priority Critical patent/CN204126353U/en
Application granted granted Critical
Publication of CN204126353U publication Critical patent/CN204126353U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

Be convenient to the steel tube tower installed, relate to steel tube tower technical field, for solve people in high-altitude, operation is carried out to steel tube tower time, easily there is the problem of pendant tower.The first flange be connected with ground is provided with in the bottom of described first steel pipe, it is characterized in that, the outer wall of described first steel pipe is provided with at least one row handle setting up and down, dismountable on the outer wall on described first steel pipe top some pedals circumferentially arranged are installed, described in each pedal cavity in can pull be provided with an expansion plate, between described expansion plate and pedal, be provided with jackscrew.A kind of steel tube tower being convenient to install that the utility model provides, the first steel pipe arranges the handle being convenient to climb and the pedal being convenient to trample, and pedal surface is long-pending comparatively large, can increase comfort level when people tramples.Safety belt is pricked in handle and the first steel pipe outside by operator, plays duplicate protection.Operator can safety stand on pedal, to the first steel pipe and second steel pipe implement bolt be connected.

Description

A kind of steel tube tower being convenient to install
Technical field
The utility model relates to steel tube tower technical field, specifically a kind of steel tube tower be convenient to installation steel tube tower and respectively saved.
Background technology
Steel tube tower plays an important role when the erection of transmission line of electricity, and steel tube tower structural strength is high, can directly be fixed on ground, arranges masthead protection, cable protection or other parts, for fixing power cable at the top of steel tube tower.The antenna height of power cable is general higher, and therefore steel tube tower is generally obtained by the above fastener for connection of two joints.Usually flange is set at the two ends up and down of the first steel pipe, wherein the first steel pipe lower flange dish is used for being connected with ground basis, the flange on the first steel pipe top is used for and the second fastener for connection, and connected mode is bolt connection, therefore needs people directly to climb to eminence and carries out bolton.People carries out operation in high-altitude, there is very large potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of steel tube tower being convenient to install, for solve people in high-altitude, operation is carried out to steel tube tower time, easily there is the problem of pendant tower.
The technical scheme in the invention for solving the technical problem is: a kind of steel tube tower being convenient to install, comprise the first steel pipe and the second steel pipe that are bolted, the first flange be connected with ground is provided with in the bottom of described first steel pipe, it is characterized in that, the outer wall of described first steel pipe is provided with at least one row handle setting up and down, dismountable on the outer wall on described first steel pipe top some pedals circumferentially arranged are installed, described in each pedal cavity in can pull be provided with an expansion plate, jackscrew is provided with between described expansion plate and pedal.
Further, described handle is set to two row, and two row handles stagger mutually along short transverse.
Further, be provided with some to stud at the outer wall on described first steel pipe top, described pedal is provided with the circular hole coordinated with stud, described pedal on stud, described stud is provided with nut by circle hole sleeve.
Further, the cross section of described first steel pipe is regular polygon, described handle be separately positioned on the first steel pipe adjacent two on the surface.
Further, described handle is the metalwork of U-shaped.
Further, described pedal is the metal sheet of L shape.
Further, the free end of described expansion plate is upturned.
The beneficial effects of the utility model are: a kind of steel tube tower being convenient to install that the utility model provides, and the first steel pipe arranges the handle being convenient to climb and the pedal being convenient to trample, and pedal surface is long-pending comparatively large, can increase comfort level when people tramples.Safety belt is pricked in handle and the first steel pipe outside by operator, plays duplicate protection.Operator can safety stand on pedal, to the first steel pipe and second steel pipe implement bolt be connected.
Accompanying drawing explanation
Fig. 1 is one of graphics of the present utility model;
Fig. 2 is the elevation of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 be pedal with expansion plate coordinate schematic diagram;
Fig. 5 is another graphics of the present utility model;
In figure: 1 first steel pipe, 11 studs, 21 first flange, 22 second flange, 3 screwed holes, 4 handles, 5 pedals, 51 expansion plates, 6 second steel pipes, 61 three-flange dishes, 7 nuts, 8 install track.
Detailed description of the invention
As shown in Figures 1 to 5, the utility model comprises the first steel pipe 1, second steel pipe 6, handle 4, pedal 5 and expansion plate 51, is described the utility model below in conjunction with accompanying drawing.
As shown in Figure 1 to Figure 3, first steel pipe 1 is for having certain altitude and its cross section is the steel pipe of regular polygon, the shape of the cross section of the first steel pipe can be regular hexagon, octagon even regualr decagon, and see to top from the bottom of the first steel pipe, the appearance and size of the first steel pipe is more and more less, and namely the first steel pipe integral becomes the taper that bottom is large, top is little.Be fixed with the first flange 21 at the bottom welding of the first steel pipe, the first flange be circumferentially evenly provided with some screwed holes 3, in this screwed hole, coordinate mounting foot bolt, with by the first penstock installation on ground.Be fixed with the second flange 22, second flange and the first flange be arranged in parallel in the welded top of the first steel pipe, the second flange is circumferentially also provided with some screwed holes, the first steel pipe is connected with the second steel pipe bolt by the second flange.
The profile of the second steel pipe 6 is identical with the profile of the first steel pipe, and difference is only that the first steel pipe is different from the size of the second steel pipe, and the cross section of the second steel pipe is also regular polygon.The cross section of the first steel pipe and the second steel pipe also can be circular.And the bottom of the second steel pipe is large, top is little, and the second steel pipe integral is tapered.Three-flange dish 61 is fixed with at the bottom welding of the second steel pipe, the appearance and size of three-flange dish is identical with the second flange, during installation, three-flange dish is alignd with the second flange, and ensure that the screwed hole on second, third flange communicates up and down, then in screwed hole, erection bolt is coordinated, to realize being fixedly connected with of first, second steel pipe.
Because the first steel pipe has certain height, the first steel pipe is climbed up for ease of people, handle 4 is respectively equipped with on the surface at two of the first steel pipe arbitrary neighborhood, and the handle on two surfaces is evenly arranged along short transverse, the setting of this height should and people ascends a height time bipod between distance adapt, to increase comfort during climbing.Handle on two surfaces becomes two row to arrange, and the handle on two surfaces staggers mutually along short transverse, so that the climbing of people, now the left and right pin of people steps down on handle respectively.Meanwhile, the right-hand man of people catches the handle on the first steel pipe two surface respectively.Handle is the metalwork of U-shaped, and obtain by bending reinforcement U-shaped, the two ends of handle are weldingly fixed on the first steel pipe.Handle between only giving up on two adjacent surfaces of the first steel pipe.Pendant tower when to carry out installation exercise in high-altitude for preventing people; safety belt and multiple connector can be set at the waist and belly of operator; safety belt connector is enclosed within the outside of the first steel pipe, is connected on handle by dismountable for another connector of safety belt, forms the duplicate protection to human body.For increasing the comfort of people when high-altitude standing at work, the outer wall on the first steel pipe top is provided with some to stud 11, often pair of stud welding is fixed on the surface of the first steel pipe, for ease of climbing, arrange a pair stud on the top of the first steel pipe at interval of a surface, namely the logarithm of stud is the half of the first steel pipe cross section limit number.As shown in Figure 4, often pair of stud is provided with a pedal 5, pedal is the metal sheet of L shape, arranges two through hole in one end of pedal, and pedal is enclosed within stud by two through hole, then coordinates on stud and installs nut 7, to realize being connected of pedal and the first steel pipe.Be cavity structure at the free end of pedal, be provided with an expansion plate 51 at the free end of pedal, expansion plate can slide in the cavity of pedal, relative fixing for what realize between pedal with expansion plate, between pedal and expansion plate, be provided with a jackscrew, screw jackscrew and realize the fixing of pedal and expansion plate.After being pulled out from pedal by expansion plate, people can trample on expansion plate and pedal, carries out installation exercise, tramples comfortable.After installation, expansion plate is advanced in pedal.And expansion plate is obliquely installed, namely the free end of expansion plate is micro-is upturned, can ensure human body be inclined to the first steel tube place side.When after the bolt installing side, operator can trample adjacent pedal, installs other bolt.After first steel pipe and the second penstock installation complete, people passes by a circular installation track 8.
The utility model by the setting of pedal, expansion plate and handle, can be convenient to steel tube tower respectively save between installation.Certain steel tube tower also can be set to more than three, and on steel pipe, arrange the pedal being convenient to trample and the handle being convenient to grip.

Claims (7)

1. be convenient to the steel tube tower of installation for one kind, comprise the first steel pipe and the second steel pipe that are bolted, the first flange be connected with ground is provided with in the bottom of described first steel pipe, it is characterized in that, the outer wall of described first steel pipe is provided with at least one row handle setting up and down, dismountable on the outer wall on described first steel pipe top some pedals circumferentially arranged are installed, described in each pedal cavity in can pull be provided with an expansion plate, between described expansion plate and pedal, be provided with jackscrew.
2. a kind of steel tube tower being convenient to install according to claim 1, it is characterized in that, described handle is set to two row, and two row handles stagger mutually along short transverse.
3. a kind of steel tube tower being convenient to install according to claim 1, it is characterized in that, be provided with some to stud at the outer wall on described first steel pipe top, described pedal is provided with the circular hole coordinated with stud, described pedal on stud, described stud is provided with nut by circle hole sleeve.
4. a kind of steel tube tower being convenient to install according to claim 3, it is characterized in that, the cross section of described first steel pipe is regular polygon, described handle be separately positioned on the first steel pipe adjacent two on the surface.
5. a kind of steel tube tower being convenient to install according to claim 1, it is characterized in that, described handle is the metalwork of U-shaped.
6. a kind of steel tube tower being convenient to install according to claim 1, it is characterized in that, described pedal is the metal sheet of L shape.
7. a kind of steel tube tower being convenient to install according to claim 1, it is characterized in that, the free end of described expansion plate is upturned.
CN201420578647.8U 2014-09-30 2014-09-30 A kind of steel tube tower being convenient to install Expired - Fee Related CN204126353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420578647.8U CN204126353U (en) 2014-09-30 2014-09-30 A kind of steel tube tower being convenient to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420578647.8U CN204126353U (en) 2014-09-30 2014-09-30 A kind of steel tube tower being convenient to install

Publications (1)

Publication Number Publication Date
CN204126353U true CN204126353U (en) 2015-01-28

Family

ID=52382720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420578647.8U Expired - Fee Related CN204126353U (en) 2014-09-30 2014-09-30 A kind of steel tube tower being convenient to install

Country Status (1)

Country Link
CN (1) CN204126353U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507648A (en) * 2015-12-03 2016-04-20 重庆瑜煌电力设备制造有限公司 Fast mounting device for steel tube tower
CN107701095A (en) * 2017-09-22 2018-02-16 安徽柏桦电力科技有限公司 A kind of annular concurrent of safety
CN107849864A (en) * 2015-07-09 2018-03-27 湾色斯能源股份公司 The tower of wind power plant
CN108315908A (en) * 2018-02-02 2018-07-24 绍兴锦晨生物科技有限公司 A kind of textile cloth cleaning device
CN110792311A (en) * 2019-10-30 2020-02-14 徐州中能电力科技有限公司 Composite steel pipe tower welding structure
CN111706144A (en) * 2020-06-24 2020-09-25 自贡市大西南电力器材制造有限公司 Large-scale steel pipe tower

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107849864A (en) * 2015-07-09 2018-03-27 湾色斯能源股份公司 The tower of wind power plant
CN105507648A (en) * 2015-12-03 2016-04-20 重庆瑜煌电力设备制造有限公司 Fast mounting device for steel tube tower
CN107701095A (en) * 2017-09-22 2018-02-16 安徽柏桦电力科技有限公司 A kind of annular concurrent of safety
CN108315908A (en) * 2018-02-02 2018-07-24 绍兴锦晨生物科技有限公司 A kind of textile cloth cleaning device
CN110792311A (en) * 2019-10-30 2020-02-14 徐州中能电力科技有限公司 Composite steel pipe tower welding structure
CN111706144A (en) * 2020-06-24 2020-09-25 自贡市大西南电力器材制造有限公司 Large-scale steel pipe tower
CN111706144B (en) * 2020-06-24 2021-10-22 自贡市大西南电力器材制造有限公司 Large-scale steel pipe tower

Similar Documents

Publication Publication Date Title
CN204126353U (en) A kind of steel tube tower being convenient to install
CN203008398U (en) Telescopic protection handrail for temporary use
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN203278094U (en) Power lines repair special-purpose ladder
CN203797266U (en) Frame supporting leg assembly capable of being used for adjusting levelness and height of device
CN104164968A (en) Novel shiftable through-wall (or embedded) type double-point adhering device
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN203983855U (en) A kind of steel tower flex holder
CN208701506U (en) Bridge Thin-wall Hollow Pier safety climbing ladder adheres to attachment device
CN202417295U (en) Insulating single-leg ladder leg stabilizer
CN201835457U (en) Turning joint for staircase handrail
CN204001927U (en) The power transmission steel pipe tower cross-arm handle that strides
CN203487851U (en) Single-track climbing structure of power tower
CN206917061U (en) A kind of steel construction assembled wallboard
CN202007522U (en) Safety construction device for pole tower
CN205709663U (en) A kind of for assisting the jack of pipe laying support
CN206590085U (en) A kind of launching beam peculiar to vessel
CN204728982U (en) A kind of installation steel tower annex special ladder
CN204760881U (en) Transmission line steel pipe tower cat ladder assistant
CN220609024U (en) Climbing device for power transmission line construction
CN207554270U (en) For the travelling platform assembly of fan yaw assembling
CN103669889A (en) High-altitude safety fence for steel structure assembling and manufacturing method of high-altitude safety fence
CN203924746U (en) Protection canopy base plate and automatic lifting protection canopy
CN204089035U (en) A kind of transmission line pole tower ascent aid
CN202441042U (en) Novel steel pipe scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20180930

CF01 Termination of patent right due to non-payment of annual fee