CN204126238U - 钢板剪力墙施工平台及其支撑架 - Google Patents

钢板剪力墙施工平台及其支撑架 Download PDF

Info

Publication number
CN204126238U
CN204126238U CN201420396884.2U CN201420396884U CN204126238U CN 204126238 U CN204126238 U CN 204126238U CN 201420396884 U CN201420396884 U CN 201420396884U CN 204126238 U CN204126238 U CN 204126238U
Authority
CN
China
Prior art keywords
steel plate
shear force
plate shear
force wall
bracing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420396884.2U
Other languages
English (en)
Inventor
周啸
刘曙
甘超勇
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201420396884.2U priority Critical patent/CN204126238U/zh
Application granted granted Critical
Publication of CN204126238U publication Critical patent/CN204126238U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种用于钢板剪力墙施工的支撑架,包括设置在钢板剪力墙上的挂鼻、支撑架本体、挂钩以及抵顶部;所述挂钩形成在所述支撑架本体上并可拆卸地挂入所述挂鼻;所述抵顶部形成在所述支撑架本体上。本实用新型还提供一种钢板剪力墙施工平台,包括上述支撑架、铺设在所述支撑架上的跳板以及设置在所述支撑架上的栏杆。通过将挂钩挂入到相应的挂鼻中并令抵顶部抵顶在钢板剪力墙上,即可将支撑架设置在钢板剪力墙上,然后再铺设跳板和安装栏杆等即可方便快捷地在钢板剪力墙上搭设形成钢板剪力墙施工平台,可有效节省措施搭设,提高施工效率。

Description

钢板剪力墙施工平台及其支撑架
技术领域
本实用新型涉及建筑施工领域,特别涉及一种钢板剪力墙施工平台及其支撑架。
背景技术
随着我国经济的快速发展与城市化进程的稳步推进,目前,我国已成为世界上超高层建筑发展的中心之一。超高层建筑作为现代经济社会建筑业发展的一大主流,是经济社会发展的标志,正在不断的改变我国城市的经济结构与城市景观。
近年来,钢板剪力墙因其抗侧力性能好、耗能功能强、构件自重轻、抗震性能佳等优点已被越来越多的应用在超高层建筑中。目前,通常使用脚手架操作平台来对钢板剪力墙进行施工。然而,脚手架操作平台存在安装及拆卸复杂、周转不方便等不足,影响施工进度。
实用新型内容
本实用新型所要解决的技术问题在于,提供一种用于钢板剪力墙施工且便于安装、拆卸并周转方便的支撑架。本实用新型还提供一种采用上述支撑架的钢板剪力墙施工平台。
本实用新型是这样实现的,提供一种用于钢板剪力墙施工的支撑架,包括设置在钢板剪力墙上的挂鼻、支撑架本体、挂钩以及抵顶部;所述挂钩形成在所述支撑架本体上并可拆卸地挂入所述挂鼻;所述抵顶部形成在所述支撑架本体上。
进一步地,所述支撑架本体为三角架。
进一步地,所述支撑架包括依次连接的第一边、第二边和第三边;所述第一边水平设置;所述第二边竖直设置;所述第三边倾斜设置并分别与所述第一边和所述第二边连接;所述挂钩通过弯折所述第一边的一部分形成。
进一步地,所述抵顶部为形成在所述第二边上的凸出结构。
进一步地,所述支撑架还包括栏杆安装部;所述栏杆安装部设置在所述支撑架本体的所述第一边上。
进一步地,所述栏杆安装部为侧面设有穿孔的圆管。
本实用新型还提供一种钢板剪力墙施工平台,包括上述支撑架、铺设在所述支撑架上的跳板以及设置在所述支撑架上的栏杆。
本实用新型一实施例中的钢板剪力墙施工平台及其支撑架中通过将挂钩挂入到相应的挂鼻中并令抵顶部抵顶在钢板剪力墙上,即可将支撑架设置在钢板剪力墙上,然后再铺设跳板和安装栏杆等即可方便快捷地在钢板剪力墙上搭设形成钢板剪力墙施工平台,可有效节省措施搭设,提高施工效率。
附图说明
图1为本实用新型一实施例中钢板剪力墙施工平台的使用状态示意图。
图2为图1中剪力墙施工平台的支撑架的放大示意图。
具体实施方式
为了使本实用新型所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。
图1所示为本实用新型一实施例中钢板剪力墙施工平台100的使用状态示意图。如图1所示,钢板剪力墙施工平台100安装在钢板剪力墙200上,包括多个间隔设置在钢板剪力墙200上的支撑架110、铺设在支撑架110上的跳板130,以及设置在支撑架110上的栏杆150。其中,多个支撑架110可以根据实际使用需要按照设定的间隔如2.5米大致沿着水平方向设置钢板剪力墙200上;跳板130铺设在支撑架110上之后,可进一步通过绑扎等方式将跳板130固定在支撑架110上;栏杆150可通过螺栓连接等方式固定在支撑架110上。
具体地,如图2所示,支撑架110包括支撑架本体112、挂钩115、挂鼻116、抵顶部117和栏杆安装部118。
其中,支撑架本体112可用于支撑跳板130。在图1和图2所示的实施例中,支撑架本体112为三角架,包括依次连接的第一边1121、第二边1123和第三边1125。当支撑架本体112处于图2所示的位置时,第一边1121大致水平设置,可用于承载跳板130;第二边1123大致竖直设置;第三边1125大致倾斜设置并分别与第一边1121和第二边1123连接。
挂钩115形成在支撑架本体112上,用于将支撑架本体112可拆卸地挂在钢板剪力墙200上。在图2所示的实施例中,挂钩115可以通过弯折第一边1121的一部分形成。
挂鼻116可通过焊接等方式固定在钢板剪力墙200上。在一实施例中,挂鼻116可以为通过焊接等方式固定在钢板剪力墙200上的槽钢140*60*8*9.5,且多个挂鼻116可以根据实际使用需要按照设定的间隔如2.5米大致沿着水平方向设置钢板剪力墙200上。将挂钩115挂入挂鼻116中,即可将支撑架本体112可拆卸地挂在钢板剪力墙200上。
抵顶部117形成在支撑架本体112上并与挂钩115间隔设置,可用于抵顶在钢板剪力墙200上从而使支撑架110保持稳定。在图2所示的实施例中,抵顶部117可以为形成在第二边1123上并朝向钢板剪力墙200凸出的凸出结构。
栏杆安装部118设置在支撑架本体112上,用于安装栏杆150。在图2所示的实施例中,栏杆安装部118可以为通过焊接等方式设置在支撑架本体112的第一边1121上的圆管,且栏杆安装部118与挂钩115位于第一边1121的两侧。此外,栏杆安装部118的侧面设有穿孔1182,用于穿设螺栓从而将插入到栏杆安装部118中的栏杆150锁紧。
上述为本实用新型一实施例中钢板剪力墙施工平台100及其支撑架110的具体结构,下面简述其使用方法。
多个挂鼻116可以根据实际使用需要按照设定的间隔如2.5米大致沿着水平方向预先设置钢板剪力墙200上;将多个支撑架110的挂钩115挂入到相应的挂鼻116中且抵顶部117抵顶在钢板剪力墙200上,即可将多个支撑架110设置在钢板剪力墙200上。然后,将跳板130铺设在支撑架110上并绑扎牢固。之后,将栏杆150插入到栏杆安装部118中并通过螺栓锁紧,即可在钢板剪力墙200上搭设形成钢板剪力墙施工平台100。
此外,栏杆150横向之间可进一步设置横向连接等安全维护。
综上所述,本实用新型一实施例中钢板剪力墙施工平台100及其支撑架110可具有下列优点:
1、将多个支撑架110的挂钩115挂入到相应的挂鼻116中且抵顶部117抵顶在钢板剪力墙200上,即可将多个支撑架110设置在钢板剪力墙200上,然后再铺设跳板130和安装栏杆150等即可方便快捷地在钢板剪力墙200上搭设形成钢板剪力墙施工平台100,可有效节省措施搭设,提高施工效率;
2、由于多个支撑架110可拆卸地设置在钢板剪力墙200上,可便于拆卸及转运,既可节省材料及人力的投入,还可进一步节省转运时间,从而进一步提高施工效率;
3、可根据钢板剪力墙200的对接长度自由装配,可适用于不同层高的钢板剪力墙200。
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。

Claims (7)

1.一种用于钢板剪力墙施工的支撑架,其特征在于,包括设置在钢板剪力墙上的挂鼻、支撑架本体、挂钩以及抵顶部;所述挂钩形成在所述支撑架本体上并可拆卸地挂入所述挂鼻;所述抵顶部形成在所述支撑架本体上。 
2.根据权利要求1所述的用于钢板剪力墙施工的支撑架,其特征在于,所述支撑架本体为三角架。 
3.根据权利要求2所述的用于钢板剪力墙施工的支撑架,其特征在于,所述支撑架包括依次连接的第一边、第二边和第三边;所述第一边水平设置;所述第二边竖直设置;所述第三边倾斜设置并分别与所述第一边和所述第二边连接;所述挂钩通过弯折所述第一边的一部分形成。 
4.根据权利要求3所述的用于钢板剪力墙施工的支撑架,其特征在于,所述抵顶部为形成在所述第二边上的凸出结构。 
5.根据权利要求3所述的用于钢板剪力墙施工的支撑架,其特征在于,所述支撑架还包括栏杆安装部;所述栏杆安装部设置在所述支撑架本体的所述第一边上。 
6.根据权利要求5所述的用于钢板剪力墙施工的支撑架,其特征在于,所述栏杆安装部为侧面设有穿孔的圆管。 
7.一种钢板剪力墙施工平台,其特征在于,包括如权利要求1至6中任意一项所述的支撑架、铺设在所述支撑架上的跳板以及设置在所述支撑架上的栏杆。 
CN201420396884.2U 2014-07-17 2014-07-17 钢板剪力墙施工平台及其支撑架 Expired - Lifetime CN204126238U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420396884.2U CN204126238U (zh) 2014-07-17 2014-07-17 钢板剪力墙施工平台及其支撑架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420396884.2U CN204126238U (zh) 2014-07-17 2014-07-17 钢板剪力墙施工平台及其支撑架

Publications (1)

Publication Number Publication Date
CN204126238U true CN204126238U (zh) 2015-01-28

Family

ID=52382605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420396884.2U Expired - Lifetime CN204126238U (zh) 2014-07-17 2014-07-17 钢板剪力墙施工平台及其支撑架

Country Status (1)

Country Link
CN (1) CN204126238U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790642A (zh) * 2015-04-24 2015-07-22 中国五冶集团有限公司 一种用于建筑施工的水平支撑结构及实现安装的方法
CN107060305A (zh) * 2017-04-26 2017-08-18 中国十九冶集团有限公司 外墙施工操作平台及施工方法
CN109252685A (zh) * 2018-10-17 2019-01-22 北京市机械施工有限公司 用于钢板墙安装的快易操作平台
CN111021747A (zh) * 2019-12-27 2020-04-17 上海建工五建集团有限公司 适用于钢板剪力墙结构的装配式焊接平台及其安装方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790642A (zh) * 2015-04-24 2015-07-22 中国五冶集团有限公司 一种用于建筑施工的水平支撑结构及实现安装的方法
CN107060305A (zh) * 2017-04-26 2017-08-18 中国十九冶集团有限公司 外墙施工操作平台及施工方法
CN109252685A (zh) * 2018-10-17 2019-01-22 北京市机械施工有限公司 用于钢板墙安装的快易操作平台
CN111021747A (zh) * 2019-12-27 2020-04-17 上海建工五建集团有限公司 适用于钢板剪力墙结构的装配式焊接平台及其安装方法

Similar Documents

Publication Publication Date Title
CN204126238U (zh) 钢板剪力墙施工平台及其支撑架
CN203308068U (zh) 一种附墙式悬挑脚手架
CN204299145U (zh) 用于外爬式塔吊支撑框架安装的操作平台
CN201176703Y (zh) 双曲线冷却塔风筒施工用三角架
CN203626275U (zh) 钢梁结构及其用于挂设水平安全网的梁下夹具
CN203160726U (zh) 工具式临边防护结构
CN204717144U (zh) 一种混凝土泵管固定工具式支架
CN207093932U (zh) 建筑施工用弹簧吊架
CN206034875U (zh) 辅助安装动臂式塔吊工具梁吊篮装置
CN206308702U (zh) 一种塔式起重机移动式基础
CN203271096U (zh) 操作平台
CN204400502U (zh) 手动葫芦支架
CN204418654U (zh) 用于墙体之间的铝模板
CN204418658U (zh) 集成式液压爬模外围围护装置
CN207749850U (zh) 一种电梯钢结构框架的水平调节装置
CN203834906U (zh) 一种用于基建斜坡面的三角形操作平台
CN203334679U (zh) 型钢混凝土梁悬挂支撑结构
CN202689588U (zh) 安全绳悬臂支撑件
CN204081433U (zh) 钢结构屋面内衬压型钢板施工专用吊篮架
CN204139577U (zh) 一种后埋置工具式连墙件
CN203453624U (zh) 一种管道固定构件
CN203783106U (zh) 吊挂式组装活动平台
CN202755633U (zh) 墙体模板安装用钢筋挂架平台
CN208123629U (zh) 室外高空管道吊装设备
CN203308109U (zh) 一种外挑网装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: CHINA CONSTRUCTION STEEL STRUCTURE TIANJIN Co.,Ltd.

Assignor: China Construction Steel Structure Corp.,Ltd.

Contract record no.: 2015990000732

Denomination of utility model: Steel plate shear wall construction platform and supporting frame thereof

Granted publication date: 20150128

License type: Exclusive License

Record date: 20150819

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20220922

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Science And Industry Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20150128

CX01 Expiry of patent term