CN204125976U - For measuring the survey basket of the empty pile length of castinplace pile - Google Patents
For measuring the survey basket of the empty pile length of castinplace pile Download PDFInfo
- Publication number
- CN204125976U CN204125976U CN201420377537.5U CN201420377537U CN204125976U CN 204125976 U CN204125976 U CN 204125976U CN 201420377537 U CN201420377537 U CN 201420377537U CN 204125976 U CN204125976 U CN 204125976U
- Authority
- CN
- China
- Prior art keywords
- basket
- survey
- pile
- reinforcing bar
- measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a kind of survey basket for measuring the empty pile length of castinplace pile.In pile foundation engineering, filling pile construction technology is widely used, the pile foundation engineering that particularly basement is darker, comparatively more options directly carry out pile foundation construction on natural ground, soil excavation is carried out again after pile foundation completes, construction hollow pile length be accurately controlled to as difficult point, be difficult to control construction quality by traditional measuring method, and may significant wastage be produced.The utility model composition comprises: lining rope (1), and described lining rope has scale, and lining rope lower end connects surveys basket (2), and described survey basket is the pyramidal structure be welded by reinforcing bar bat (3) and reinforcing bar circular boop (4).The utility model is used for measuring.
Description
technical field:
the utility model relates to a kind of title for measuring the survey basket of the empty pile length of castinplace pile.
background technology:
in pile foundation engineering, filling pile construction technology is widely used, the pile foundation engineering that particularly basement is darker, comparatively more options directly carry out pile foundation construction on natural ground, soil excavation is carried out again after pile foundation completes, construction hollow pile length be accurately controlled to as difficult point, be difficult to control construction quality by traditional measuring method, and may significant wastage be produced.
utility model content:
the purpose of this utility model is to provide a kind of survey basket for measuring the empty pile length of castinplace pile.
above-mentioned object is realized by following technical scheme:
a kind of survey basket for measuring the empty pile length of castinplace pile, its composition comprises: lining rope, described lining rope has scale, lining rope lower end connects surveys basket, described survey basket comprises suspention muscle and basket ring, described survey basket has the polycrystalline substance of taper, and described survey basket is the conical structure be welded by reinforcing bar bat and reinforcing bar circular boop.
describedfor measuring the survey basket of the empty pile length of castinplace pile, described survey basket comprises one group of equally distributed described suspention muscle, described suspention muscle and described basket ring. solderedly to connect, described polycrystalline substance is one group of reinforcing bar, described reinforcing bar one end is welded on described basket ring, the other end welds together, described
upper gap between reinforcing bar is greater than the concrete aggregate major diameter of job site.
the beneficial effects of the utility model:
1. the utility model structure is simple, draws materials conveniently, easy to use, is a kind of instrument measuring the empty pile length of castinplace pile, relative to traditional measuring method, can precisely controls empty pile length, namely ensure construction quality, saved cost in work progress.
the survey basket of the empty pile length of measurement castinplace pile described in the utility model is primarily of the survey basket of reinforcement welding and graduated lining rope two parts composition, surveying basket is that taper shape is welded by reinforcing bar bat and reinforcing bar circular boop, gap between reinforcing bar can enter concrete aggregate, and conical survey concrete aggregate when basket is convenient to decline and enter, during rising due to aggregate Action of Gravity Field fall into cone low, not easily flow out, can accurately reflect concrete surface actual elevation, substantially increase the construction quality of filling pile head.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present utility model.
accompanying drawing 2 is survey basket structural representations of accompanying drawing 1.
accompanying drawing 3 is top views of accompanying drawing 2.
fundamental diagram when accompanying drawing 4 is the utility model uses.
detailed description of the invention:
embodiment 1:
for measuring a survey basket for the empty pile length of castinplace pile, its composition comprises: lining rope 1, and described lining rope has scale, and lining rope lower end connects surveys basket 2, and described survey basket comprises suspention muscle 3 and basket ring 4, and described survey basket has the polycrystalline substance of taper.
embodiment 2
the described survey basket for measuring the empty pile length of castinplace pile, described survey basket comprises one group of equally distributed described suspention muscle, described suspention muscle and described basket ring. solderedly to connect, described polycrystalline substance is one group of reinforcing bar, described reinforcing bar one end is welded on described basket ring, the other end welds together, and the upper gap between described reinforcing bar is greater than the concrete aggregate major diameter of job site.
according to embodiment 1, hang muscle 3 and basket ring 4 polycrystalline substance is welded together to form survey basket by ready, survey basket and lining rope is connected firmly by scale.During use, the survey basket of empty for the measurement castinplace pile made pile length is slowly put into stake from Natural Water plane earth 8, and insert wall built-up laitance 7 successively, laitance 6, after finally inserting newly placed concrete 5, concrete aggregate enters survey basket.Basket to be measured no longer sinks, stretching lining rope, reads lining rope calibration record, will survey basket and propose, and measure aggregate height in basket, and can calculate concrete surface actual elevation.
Claims (2)
1. for measuring a survey basket for the empty pile length of castinplace pile, its composition comprises: lining rope, is characterized in that: described lining rope has scale, and lining rope lower end connects surveys basket, and described survey basket comprises suspention muscle and basket ring, and described survey basket has the polycrystalline substance of taper,
described survey basket is the conical structure be welded by reinforcing bar bat and reinforcing bar circular boop.
2. the survey basket for measuring the empty pile length of castinplace pile according to claim 1, it is characterized in that: described survey basket comprises one group of equally distributed described suspention muscle, described suspention muscle is connected with described basket boxing, described polycrystalline substance is one group of reinforcing bar, described reinforcing bar one end is welded on described basket ring, the other end welds together, and the upper gap between described reinforcing bar is greater than the concrete aggregate major diameter of job site.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420377537.5U CN204125976U (en) | 2014-07-09 | 2014-07-09 | For measuring the survey basket of the empty pile length of castinplace pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420377537.5U CN204125976U (en) | 2014-07-09 | 2014-07-09 | For measuring the survey basket of the empty pile length of castinplace pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204125976U true CN204125976U (en) | 2015-01-28 |
Family
ID=52382344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420377537.5U Expired - Fee Related CN204125976U (en) | 2014-07-09 | 2014-07-09 | For measuring the survey basket of the empty pile length of castinplace pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204125976U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668534A (en) * | 2021-08-31 | 2021-11-19 | 中铁十四局集团第三工程有限公司 | Novel combined slag extractor and use method thereof |
-
2014
- 2014-07-09 CN CN201420377537.5U patent/CN204125976U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668534A (en) * | 2021-08-31 | 2021-11-19 | 中铁十四局集团第三工程有限公司 | Novel combined slag extractor and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204212189U (en) | For pound piling with hole slurry protected sediment layer thickness determinator | |
CN204043662U (en) | A kind of Simple measurement device measuring the excavation slope gradient | |
CN106644048A (en) | Auxiliary explosion vibration tester and explosion vibration test method | |
CN204125976U (en) | For measuring the survey basket of the empty pile length of castinplace pile | |
CN107063213B (en) | It is a kind of suitable for the earth's surface monitoring point in loess geology tunnel and installation aiding device and method | |
CN204385727U (en) | Spiral grouting preformed pile | |
CN101942829A (en) | Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof | |
CN106013267B (en) | A kind of vertical anti-pulling concrete model stake and its method of construction and application | |
CN103267464A (en) | Tool for measuring concrete pouring height | |
CN206695789U (en) | Convenient placement formula inclinometer pipe | |
CN206034512U (en) | Bored concrete pile of driling under water construction monitoring devices | |
CN205776201U (en) | A kind of anti-float anchor rod constructing structure | |
CN201794070U (en) | Implanted anti-corrosion precast pile applied to saline soil foundation | |
CN209025119U (en) | A kind of simple rotary digging drilling hole bored concrete pile static load test device | |
CN205154205U (en) | A vertical pre -reinforcing handles structure for massif tunnel excavation | |
CN207516369U (en) | Concrete slump detection device | |
CN203606228U (en) | Earthen archaeological site anchoring indoor test system | |
CN204385780U (en) | A kind of ultra-deep slurry drilled pile pile head elevation control device | |
CN208346808U (en) | A kind of device controlling Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation | |
CN204475341U (en) | A kind of device controlling prestressed concrete pipe pile verticality | |
CN209470638U (en) | A kind of portable floor calibrator | |
CN202194161U (en) | Detecting device for concrete at top of drilled pile | |
CN207515676U (en) | Plate thickness monitoring instrument when concrete floor pours | |
CN207109806U (en) | The artificial friction pile of noiseless no airborne dust and short time limit | |
CN215211046U (en) | Detection device for pile body concrete pouring height of cast-in-situ bored pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150128 Termination date: 20150709 |
|