CN202194161U - Detecting device for concrete at top of drilled pile - Google Patents

Detecting device for concrete at top of drilled pile Download PDF

Info

Publication number
CN202194161U
CN202194161U CN2011203273252U CN201120327325U CN202194161U CN 202194161 U CN202194161 U CN 202194161U CN 2011203273252 U CN2011203273252 U CN 2011203273252U CN 201120327325 U CN201120327325 U CN 201120327325U CN 202194161 U CN202194161 U CN 202194161U
Authority
CN
China
Prior art keywords
concrete
detecting device
pile
drilled pile
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203273252U
Other languages
Chinese (zh)
Inventor
任金林
李从华
易明伟
郭光权
陈登祥
王志祥
姚松柏
王玉林
冯海珍
程桂芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN2011203273252U priority Critical patent/CN202194161U/en
Application granted granted Critical
Publication of CN202194161U publication Critical patent/CN202194161U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a detecting device for concrete at the top of a drilled pile. The detecting device is characterized by being provided with a steel tube on which a length scale ruler is arranged, wherein the front end of the steel tube is fixedly provided with a slag fishing bucket and the slag fishing bucket takes a steel bar net piece as a bucket wall. With the detecting device, the height of the concrete pouring head in concrete pouring is detected, pouring exceeding or insufficient pouring is avoided, and therefore the construction progress is ensured.

Description

Bored piles top concrete appliance
Technical field
The utility model relates to a kind of bored piles top concrete Height control testing tool.
Background technology
Fig. 1 a and Fig. 1 b are depicted as a kind of perfusion pile-formation process of drilled pile; Be that conduit 1 vertically is inserted into apart from 2 about 40cm places, bottom, stake hole; Concrete pours in the hole from conduit 1 gradually, and the mud extruding is discharged from the top, hole, when layer of concrete 3 constantly is increased to top of concrete 4 arrival design altitudes; Because extruding, mud layer 5 concentration that are positioned on the top of concrete are bigger.How passing through the height that mud layer 5 accurately records top of concrete 4 is to guarantee the concrete ultra necessity of irritating or owing to irritate that do not take place.
Such as; It is domestic to be positioned at Weinan City Heyang County, Shaanxi Province to the west of the construction 11# mark the Yellow River before the Line for Passenger Transportation station, China domestic big western railway road, and water level is higher, complicated geology; Be stream plasticity sand; For guaranteeing drilled pile construction pile crown concrete quality, design is carried out the ultra 1m that irritates of pile crown again manual work and is abolished during concrete spouting behind excavation of foundation pit.This project pile foundation degree of depth is big, and maximum effective length is 92m, hole depth 102m, and the stake apex distance is bigger from the casing apical side height, generally more than 5m, is 9m to the maximum.Adopt the perfusion pile-formation process; When top of concrete arrives design altitude, the mud layer of 9m thickness is then arranged in the hole approximately, and concentration is bigger; Adopt conventional measuring method because lining rope is too soft; Can't pass through mud layer, thus energy measurement top of concrete height not, so cause ultra irritate or owe to irritate all can influence programming.
The utility model content
The utility model is for avoiding above-mentioned existing in prior technology weak point, a kind of bored piles top concrete appliance is provided, be used to pour into pile-formation process can pass through mud layer accurately examine the top of concrete height.
The utility model technical solution problem adopts following technical scheme:
The design feature of the utility model bored piles top concrete appliance is that a steel pipe that has the length graduated scale is set, and fixedly installs a slag bucket at the front end of said steel pipe, and said slag bucket is to be headwall with the reinforced mesh.
In pile foundation concrete spouting process, when treating concrete, utilize steel pipe to pass through the mud layer of irritating a top approximately apart from design altitude 1~2m, salvage with the slag bucket of steel pipe front end and irritate head position concrete, and detect filling head height degree with this.
Compared with present technology, the utility model beneficial effect is embodied in:
1, the utility model makes the concrete filling head height degree in the pile foundation concrete spouting process be able to detect, and avoids the ultra filling of irritating or owe, the assurance construction speed.
2, the utility model is simple in structure, few with; Its testing process is easy to operate, easy to implement.
Description of drawings
Fig. 1 a is a perfusion initial state sketch map in the drilled pile perfusion formation of pile;
Fig. 1 b irritates the head height degree in the drilled pile perfusion formation of pile to reach the design altitude view;
Fig. 2 is the utility model structural representation;
Fig. 3 is the utility model user mode sketch map;
Label among the figure: 1 conduit; Bottom, 2 holes; 3 layer of concrete; 4 top of concrete; 5 mud layers; 6 steel pipes; 7 slag buckets;
The specific embodiment
As shown in Figures 2 and 3, a steel pipe 6 that has the length graduated scale is set, fixedly installs a slag bucket 7 at the front end of steel pipe 6, slag bucket 7 is to be headwall with the reinforced mesh.
Steel pipe 6 adopts the steel pipe of φ 32mm, δ 3mm, and slag bucket 7 adopts the round steel of φ 10mm to process reinforced mesh, has the rigidity and the intensity of passing through mud layer to guarantee it, and 7 one-tenth sieves of slag bucket shape is so that the discharge of mud.
Method for using is: when the design altitude of drilled pile concrete spouting to the top of arrival stake soon, strengthen the hole depth measuring frequency.When prediction concrete end face has risen to design elevation; Utilize this concrete appliance with slag bucket directly to design altitude position, stake top; And then outside the proposition drilled pile,, just can judge concrete and whether pour into to design elevation through the slag specimen of getting in the slag bucket is analyzed.If do not arrive, commander led on-the-spotly continue concrete perfusion, and repeat sample analysis, can think that concrete has poured into put in place that until salvage up-to-standard concrete in design elevation position, stake top the scene can stop concrete spouting.

Claims (1)

1. concrete appliance in bored piles top is characterized in that being provided with a steel pipe (6) that has the length graduated scale, fixedly installs a slag bucket (7) at the front end of said steel pipe (6), and said slag bucket (7) is to be headwall with the reinforced mesh.
CN2011203273252U 2011-09-02 2011-09-02 Detecting device for concrete at top of drilled pile Expired - Fee Related CN202194161U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203273252U CN202194161U (en) 2011-09-02 2011-09-02 Detecting device for concrete at top of drilled pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203273252U CN202194161U (en) 2011-09-02 2011-09-02 Detecting device for concrete at top of drilled pile

Publications (1)

Publication Number Publication Date
CN202194161U true CN202194161U (en) 2012-04-18

Family

ID=45949080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203273252U Expired - Fee Related CN202194161U (en) 2011-09-02 2011-09-02 Detecting device for concrete at top of drilled pile

Country Status (1)

Country Link
CN (1) CN202194161U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015427A (en) * 2012-12-28 2013-04-03 中铁二十四局集团有限公司 Hole pile underwater concrete pouring positioning device and positioning device thereof
CN105155519A (en) * 2015-09-29 2015-12-16 中国一冶集团有限公司 Rotary-excavating under-reamed bored pile constructing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015427A (en) * 2012-12-28 2013-04-03 中铁二十四局集团有限公司 Hole pile underwater concrete pouring positioning device and positioning device thereof
CN105155519A (en) * 2015-09-29 2015-12-16 中国一冶集团有限公司 Rotary-excavating under-reamed bored pile constructing method

Similar Documents

Publication Publication Date Title
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN203905005U (en) Underwater cast-in-place concrete pile elevation control device
CN208251108U (en) Caisson pile concrete elevation measurement and superfilled control structure
CN202194162U (en) Unchoking device for acoustic pipe for drilled pile
CN108547331B (en) Cast-in-place pile concrete elevation measurement and over-grouting control method
CN104110028A (en) Grouting pile construction method for dry operation drilling and waterless pouring of concrete
CN107246007A (en) A kind of construction method CFG
CN103195066B (en) Excessive concrete pouring detector for underwater cast-in-place piles and method for using excessive concrete pouring detector
CN102912806A (en) Construction method of precipitation well
CN204919631U (en) Automatic monitoring underwater concrete fills device of elevation
CN109443436A (en) Slope runoff overall process automated watch-keeping facility
CN202194161U (en) Detecting device for concrete at top of drilled pile
CN203256733U (en) Device for detecting pile top concrete elevation of cast-in-place pile
CN201367588Y (en) Underwater concrete sampler
CN202672149U (en) Height controller for underwater concrete grouting pile
CN202433000U (en) Underwater concrete pouring lifting height tester
CN103498453B (en) Appropriate control check device and method for pouring fullness of concrete of top arch of tunnel
CN103267464A (en) Tool for measuring concrete pouring height
CN204551416U (en) A kind of bored pile pile crown concrete sampler
CN203487516U (en) Timely control and check device for concrete pouring fullness of tunnel top arch
CN206034512U (en) Bored concrete pile of driling under water construction monitoring devices
CN202595721U (en) Punched and bored pile sampler
CN202730765U (en) Sampler for underwater concrete pouring of cast-in-situ bored pile
CN109372036A (en) Cast-in-place concrete pile pile head elevation control device and its application method
CN204385780U (en) A kind of ultra-deep slurry drilled pile pile head elevation control device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20200902

CF01 Termination of patent right due to non-payment of annual fee