CN204113710U - Underwater scooter band water installation system - Google Patents

Underwater scooter band water installation system Download PDF

Info

Publication number
CN204113710U
CN204113710U CN201420528695.6U CN201420528695U CN204113710U CN 204113710 U CN204113710 U CN 204113710U CN 201420528695 U CN201420528695 U CN 201420528695U CN 204113710 U CN204113710 U CN 204113710U
Authority
CN
China
Prior art keywords
fixedly connected
guide rod
support rail
positioning
propulsion device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420528695.6U
Other languages
Chinese (zh)
Inventor
郦智明
何迪永
蒋培三
郦姝绮
刘晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yongli environmental Limited by Share Ltd
Original Assignee
ZHEJIANG YONGLI ENVIRONMENTAL PROTECTION ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG YONGLI ENVIRONMENTAL PROTECTION ENGINEERING CO LTD filed Critical ZHEJIANG YONGLI ENVIRONMENTAL PROTECTION ENGINEERING CO LTD
Priority to CN201420528695.6U priority Critical patent/CN204113710U/en
Application granted granted Critical
Publication of CN204113710U publication Critical patent/CN204113710U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of underwater scooter band water installation system, being intended to solve when existing propulsion device is installed needs to carry out in the pond not having water, operation inconvenience, the deficiency that maintenance dismounting cost is high.This model utility comprises guide rod, lower support seat, upper bracket, lower support seat comprises support rail, vertical supporting rod, support rail one end is fixedly connected on guide rod, two vertical supporting rod upper ends are all fixedly connected on the other end of support rail, two vertical supporting rods link together in inverted v-shaped structure, all support rail is fixedly connected with between the lower end of two vertical supporting rods and lower end of the guide rod, upper bracket L shape structure comprises horizontal plane and vertical plane, horizontal plane and vertical plane are equipped with oval hole, oval hole on vertical plane is connected with the attachment post on basin side wall, oval hole on horizontal plane is connected with the attachment post on upper-end surface, pond, guide rod is slidably connected with scaffold, scaffold is fixedly connected with propulsion device.

Description

Underwater scooter band water installation system
Technical field
The utility model relates to a kind of environmental protection equipment, and more particularly, it relates to a kind of underwater scooter band water installation system easy for installation.
Background technique
In sewage treatment process, oxidation ditch treatment technique due to technical maturity, commissioning test is simple, processing cost is low, effective and obtain the favor of vast architect and applying unit.In oxidation ditch process, angle of rake effect helps the liquid in ditch ceaselessly to move to a direction with certain speed, the aerator that liquid is ceaselessly arranged fast in oxidation ditch obtains oxygen, cultivate microorganism, liquid flows rapidly and can prevent sludge settling in ditch on the other hand, forms anaerobism and affects treatment effect.Propulsion device to need to be arranged on position at the bottom of the pond in the pond in when using, the installation method commonly used at present is fixedly connected at the bottom of pond by propulsion device scaffold lower end, and this action need does not have when water and just can carry out in pond.The cesspool of normal operation generally can not out of service come installation propeller, such operation can increase cost greatly.
Chinese patent notification number CN202391752U, disclose a kind of Miniature water flow propeller for sewage treatment, comprise housing, support motor seat is provided with in housing, support motor seat is made up of one piece of right-angle folding bent plate, support motor seat is provided with speed-adjustable motor, and speed-adjustable motor is connected with the first synchronous rotating shaft group live axle; Supporting base is provided with below support motor seat, supporting base lower end arranges bearing support block, support motor seat, supporting base and bearing support block are respectively arranged with four mounting holes, be fixedly connected with by four stainless steel threaded stems, by nut at right angle setting two bearings on bearing support block, two bearings are all connected with threaded shaft, threaded shaft one end is connected with small propeller, the other end is connected with the second synchronous rotating shaft group live axle, and the first synchronous rotating shaft group live axle and the second synchronous rotating shaft group live axle are driven by Timing Belt.When propulsion device is installed and used, four stainless steel threaded stems need to be fixedly connected on Chi Dishang, for the cesspool run, and angle of rake installation inconvenience.
Model utility content
The utility model overcomes when existing propulsion device is installed to be needed to carry out in the pond not having water, operation inconvenience, the deficiency that maintenance dismounting cost is high, provide a kind of underwater scooter band water installation system, propulsion device can carry out dismounting when sewage normally runs in pond, and after not needing to bleed off the sewage in pond, carrying out dismounting again, disassembling operations is convenient, and maintenance dismounting cost is low.
In order to solve the problems of the technologies described above, the utility model is by the following technical solutions: a kind of underwater scooter band water installation system, comprise the vertical guide rod arranged, be fixedly connected on the lower support seat of lower end of the guide rod position, be fixedly connected on the upper bracket of guide rod upper end, lower support seat comprises support rail, vertical supporting rod, support rail one end is fixedly connected on guide rod, two vertical supporting rod upper ends are all fixedly connected on the other end of support rail, two vertical supporting rods link together in inverted v-shaped structure, all connecting rod is fixedly connected with between the lower end of two vertical supporting rods and lower end of the guide rod, upper bracket L shape structure comprises horizontal plane and vertical plane, horizontal plane and vertical plane are equipped with oval hole, oval hole on vertical plane is connected with the attachment post on basin side wall, oval hole on horizontal plane is connected with the attachment post on upper-end surface, pond, gap is provided with between upper bracket horizontal plane and upper-end surface, pond, guide rod is slidably connected with scaffold, scaffold is fixedly connected with propulsion device, propulsion device lower end is fixedly connected with the positioning device with support rail adaptation.
When propulsion device is installed, first the guide rod being fixedly connected with lower support seat and upper bracket is vertically placed in pond, until basin bottom encountered by guide rod, guide rod is put surely, oval hole on upper bracket vertical plane is installed to pond on the attachment post of upper end inner side surface, oval hole on horizontal plane is installed on the attachment post of upper-end surface, pond, then pre-fastening nut on the attachment post of upper bracket vertical plane position, subsequent on the attachment post of upper bracket horizontal plane position fastening nut, the lower end of guide rod is abutted firmly to be supported in tank floor, again by the nut screwing clamping on the attachment post of upper bracket vertical plane position.Finally scaffold angle of rake in connection is set on guide rod, generally hangs with rope and haul propulsion device propulsion device is slid down on lower support seat, located by positioning device, prevent propulsion device from moving left and right.Propulsion device can be started shooting after having transferred work.Whole installation process does not need manually to arrive tank floor and operates, and no matter whether has sewage in pond, all can carry out disassembling operations to propulsion device, easy to operate.When needs are to propulsion device detachable maintaining, only need propulsion device to be pulled upwardly, do not need to operate after the water discharge in pond again.The propulsion device of underwater scooter band water installation system can carry out dismounting when sewage normally runs in pond, and carries out dismounting after not needing to bleed off the sewage in pond again, and disassembling operations is convenient, and maintenance dismounting cost is low.
As preferably, positioning device comprises positioning plate, connecting plate, connecting plate is fixedly connected on angle of rake lower end, positioning plate is arranged on the below of connecting plate, positioning plate lower end is provided with in inverted V-arrangement positioning port, support rail cross section in square and a diagonal on horizontal position, locating notch is clamped on adjacent bi-side, support rail upper end.The V-arrangement positioning port of positioning plate lower end is clamped on adjacent bi-side, support rail upper end, effectively prevents propulsion device from moving left and right, and location is convenient, good positioning effect.
As preferably, positioning plate is provided with two pieces and front and back are arranged side by side, and be connected with the clamping plate in being inverted V-arrangement between the positioning port of two positioning plates, clamping plate are clamped on adjacent bi-side, support rail upper end.Carry out clamping position by two pieces of positioning plates and the clamping plate between them, holding area is large, further increases locating effect.
As preferably, propulsion device upper end is connected with upending frame, and upending frame is connected with lifting rope.Propulsion device hauls propulsion device by lifting rope upending frame of ining succession in the process risen and decline, and prevents propulsion device from rocking arbitrarily, makes angle of rake moving process more steadily reliable.
As preferably, scaffold comprises two pieces of mobile clips and is held in slide plate on guide rod, and a side margin of two slide plates is fixed together, and two slide plates are all connected with two rollers on the two-phase inner surface sides at opposite side edge.Two slide plates be oppositely arranged link together and are clamped on guide rod, and two rollers be connected on slide plate on the one hand serve spacing effect, and anti-limited slip plate slips away guide rod, substantially reduces the resistance in slide plate slides process on the other hand.
Compared with prior art, the beneficial effects of the utility model are: the propulsion device of underwater scooter band water installation system can carry out dismounting when sewage normally runs in pond, and after not needing to bleed off the sewage in pond, carrying out dismounting again, disassembling operations is convenient, and maintenance dismounting cost is low.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is the structural representation of positioning device of the present utility model;
Fig. 3 is the plan view of lower support seat of the present utility model;
In figure: 1, guide rod, 2, lower support seat, 3, upper bracket, 4, support rail, 5, vertical supporting rod, 6, connecting rod, 7, scaffold, 8, propulsion device, 9, positioning device, 10, positioning plate, 11, connecting plate, 12, positioning port, 13, clamping plate, 14, upending frame, 15, lifting rope, 16, slide plate, 17, roller.
Embodiment
Below by specific embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is further described specifically:
Embodiment: a kind of underwater scooter band water installation system (see accompanying drawing 1), comprise the vertical guide rod 1 arranged, be fixedly connected on the lower support seat 2 of lower end of the guide rod position, be fixedly connected on the upper bracket 3 of guide rod upper end, lower support seat (see accompanying drawing 3) comprises support rail 4, vertical supporting rod 5, support rail one end is fixedly connected on guide rod, two vertical supporting rod upper ends are all fixedly connected on the other end of support rail, two vertical supporting rods link together in inverted v-shaped structure, connecting rod 6 is all fixedly connected with between the lower end of two vertical supporting rods and lower end of the guide rod, upper bracket L shape structure comprises horizontal plane and vertical plane, horizontal plane and vertical plane are equipped with oval hole, oval hole on vertical plane is connected with the attachment post on basin side wall, oval hole on horizontal plane is connected with the attachment post on upper-end surface, pond, attachment post generally adopts connecting bolt.Gap is provided with between upper bracket horizontal plane and upper-end surface, pond; Guide rod is slidably connected with scaffold 7, scaffold is fixedly connected with propulsion device 8, propulsion device upper end is connected with upending frame 14, upending frame is connected with lifting rope 15, and propulsion device lower end is fixedly connected with the positioning device 9 with support rail adaptation.Positioning device (see accompanying drawing 2) comprises positioning plate 10, connecting plate 11, connecting plate is fixedly connected on angle of rake lower end, positioning plate is arranged on the below of connecting plate, positioning plate lower end is provided with in inverted V-arrangement positioning port 12, support rail cross section in square and a diagonal on horizontal position, locating notch is clamped on adjacent bi-side, support rail upper end.Positioning plate is provided with two pieces and front and back are arranged side by side, and be connected with the clamping plate 13 in being inverted V-arrangement between the positioning port of two positioning plates, clamping plate are clamped on adjacent bi-side, support rail upper end.The side margin that scaffold comprises slide plate 16, two slide plate that two pieces of mobile clips are held on guide rod is fixed together, and two slide plates are all connected with two rollers 17 on the two-phase inner surface sides at opposite side edge.
When propulsion device is installed, first the guide rod being fixedly connected with lower support seat and upper bracket is vertically placed in pond, until basin bottom encountered by guide rod, guide rod is put surely, oval hole on upper bracket vertical plane is installed to pond on the attachment post of upper end inner side surface, oval hole on horizontal plane is installed on the attachment post of upper-end surface, pond, then pre-fastening nut on the attachment post of upper bracket vertical plane position, subsequent on the attachment post of upper bracket horizontal plane position fastening nut, the lower end of guide rod is abutted firmly to be supported in tank floor, again by the nut screwing clamping on the attachment post of upper bracket vertical plane position.Finally scaffold angle of rake in connection is set on guide rod, generally hangs with rope and haul propulsion device propulsion device is slid down on lower support seat, located by positioning device, prevent propulsion device from moving left and right.Propulsion device can be started shooting after having transferred work.Whole installation process does not need manually to arrive tank floor and operates, and no matter whether has sewage in pond, all can carry out disassembling operations to propulsion device, easy to operate.When needs are to propulsion device detachable maintaining, only need propulsion device to be pulled upwardly, do not need to operate after the water discharge in pond again.The propulsion device of underwater scooter band water installation system can carry out dismounting when sewage normally runs in pond, and carries out dismounting after not needing to bleed off the sewage in pond again, and disassembling operations is convenient, and maintenance dismounting cost is low.
Above-described embodiment is one of the present utility model preferably scheme, not does any pro forma restriction to the utility model, also has other variant and remodeling under the prerequisite not exceeding the technological scheme described in claim.

Claims (5)

1. a underwater scooter band water installation system, it is characterized in that, comprise the vertical guide rod arranged, be fixedly connected on the lower support seat of lower end of the guide rod position, be fixedly connected on the upper bracket of guide rod upper end, lower support seat comprises support rail, vertical supporting rod, support rail one end is fixedly connected on guide rod, two vertical supporting rod upper ends are all fixedly connected on the other end of support rail, two vertical supporting rods link together in inverted v-shaped structure, all connecting rod is fixedly connected with between the lower end of two vertical supporting rods and lower end of the guide rod, upper bracket L shape structure comprises horizontal plane and vertical plane, horizontal plane and vertical plane are equipped with oval hole, oval hole on vertical plane is connected with the attachment post on basin side wall, oval hole on horizontal plane is connected with the attachment post on upper-end surface, pond, gap is provided with between upper bracket horizontal plane and upper-end surface, pond, guide rod is slidably connected with scaffold, scaffold is fixedly connected with propulsion device, propulsion device lower end is fixedly connected with the positioning device with support rail adaptation.
2. underwater scooter band water installation system according to claim 1, it is characterized in that, positioning device comprises positioning plate, connecting plate, connecting plate is fixedly connected on angle of rake lower end, positioning plate is arranged on the below of connecting plate, positioning plate lower end is provided with in inverted V-arrangement positioning port, support rail cross section in square and a diagonal on horizontal position, locating notch is clamped on adjacent bi-side, support rail upper end.
3. underwater scooter band water installation system according to claim 2, it is characterized in that, positioning plate is provided with two pieces and front and back are arranged side by side, and be connected with the clamping plate in being inverted V-arrangement between the positioning port of two positioning plates, clamping plate are clamped on adjacent bi-side, support rail upper end.
4. the underwater scooter band water installation system according to claim 1 or 2 or 3, it is characterized in that, propulsion device upper end is connected with upending frame, and upending frame is connected with lifting rope.
5. the underwater scooter band water installation system according to claim 1 or 2 or 3, it is characterized in that, scaffold comprises two pieces of mobile clips and is held in slide plate on guide rod, one side margin of two slide plates is fixed together, and two slide plates are all connected with two rollers on the two-phase inner surface sides at opposite side edge.
CN201420528695.6U 2014-09-15 2014-09-15 Underwater scooter band water installation system Active CN204113710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420528695.6U CN204113710U (en) 2014-09-15 2014-09-15 Underwater scooter band water installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420528695.6U CN204113710U (en) 2014-09-15 2014-09-15 Underwater scooter band water installation system

Publications (1)

Publication Number Publication Date
CN204113710U true CN204113710U (en) 2015-01-21

Family

ID=52331025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420528695.6U Active CN204113710U (en) 2014-09-15 2014-09-15 Underwater scooter band water installation system

Country Status (1)

Country Link
CN (1) CN204113710U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106889854A (en) * 2017-03-21 2017-06-27 周乐怡 Bottled water support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106889854A (en) * 2017-03-21 2017-06-27 周乐怡 Bottled water support
CN106889854B (en) * 2017-03-21 2018-06-12 周乐怡 Bottled water stent

Similar Documents

Publication Publication Date Title
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN205045898U (en) Portable filler aeration equipment
CN202988854U (en) Lifting aerator
CN204113710U (en) Underwater scooter band water installation system
CN204058252U (en) A kind of sheet mounting frame for glass coating machine
CN104445590B (en) The Float cylinder type of aerated mixing plant installs combined bay
CN204848426U (en) Be applied to split type MBR membrane frame of integrated water treatment facilities
JP4122712B2 (en) Solar power generation system for water treatment pond
CN104264631B (en) A kind of floating dirt blocking bar
CN209289144U (en) A kind of attaching/detaching apparatus of organic film
CN211521738U (en) Novel UASB water treatment facilities
CN210440467U (en) Guide roller bearing seat convenient to detach in cleaning tank
CN203682952U (en) Wall-leaning lifting rack
CN203792220U (en) Precast opening-butt device of pipelines
CN214495776U (en) Grid device for sewage treatment
CN201049914Y (en) Rigid pipe vertical suspension aeration system
CN105107249A (en) Sewage purification treatment system
CN213895248U (en) Quick underwater propulsor of sewage station sewage
CN200996915Y (en) Medical multi-smear dyeing supporter
CN202671300U (en) Membrane bio-reactor (MBR) membrane device fixing equipment
CN204940866U (en) Y type pier stud oblique fulcrum bar punching block removes system
CN204891357U (en) A remove miscellaneous equipment for chicken field sewage treatment system isolation tank
CN203002219U (en) Assisting device for membrane shell mounting/dismounting
CN202738642U (en) Water inlet screen door filtering device of parent fish breeding pool
CN218719328U (en) Water supply and drainage pipeline locating support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311800 Zhao village, Jiyang street, Zhuji, Zhejiang, Shaoxing

Patentee after: Zhejiang Yongli environmental Limited by Share Ltd

Address before: 311800 Zhejiang city of Shaoxing province Zhuji City Tao Zhai Cun Street No. 168

Patentee before: Zhejiang Yongli Environmental Protection Engineering Co.,Ltd.