CN203682952U - Wall-leaning lifting rack - Google Patents

Wall-leaning lifting rack Download PDF

Info

Publication number
CN203682952U
CN203682952U CN201420022891.6U CN201420022891U CN203682952U CN 203682952 U CN203682952 U CN 203682952U CN 201420022891 U CN201420022891 U CN 201420022891U CN 203682952 U CN203682952 U CN 203682952U
Authority
CN
China
Prior art keywords
rectangular base
wall
raising legs
sleeve pipe
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420022891.6U
Other languages
Chinese (zh)
Inventor
王月萍
程寒飞
徐云辉
吴天福
刘通
刘腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201420022891.6U priority Critical patent/CN203682952U/en
Application granted granted Critical
Publication of CN203682952U publication Critical patent/CN203682952U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Abstract

The utility model discloses a wall-leaning lifting rack and mainly aims to provide a wall-leaning lifting rack which is fixed and kept balanced on a wall. The wall-leaning lifting rack comprises a rectangular base, a base fixing device, and four upright posts which are respectively arranged at four right-angled positions of the rectangular base, wherein sleeves are respectively arranged on two opposite sides of the rectangular base; telescopic pipes are arranged in the sleeves; the telescopic pipes slide along the direction of the central axis of the sleeve; a positioning clamping block is arranged on the rectangular base; two upright posts along the direction of the central axis of the sleeve are connected together to form a diagonal member; two diagonal members are connected to the four upright posts; a winch is arranged between two upright posts in the four upright posts; a pulley is arranged between the two diagonal members. The wall-leaning lifting rack is fixed and balanced on high, narrow and long walls and wide walls, and equipment needing to be lifted is subjected to lifting operation.

Description

Lean on wall raising legs
Technical field
The utility model relates to a kind of wall raising legs that leans on.
Background technology
Current most of sewage treatment plant exposes to the sun at the employing end and carries out aeration aerating; the end device that exposes to the sun is all to adopt that full pond is unified to be arranged; hundreds of tubular type or plate-type aerator are fixedly mounted on the base fabric pipe of pond, break or stop up once there is aeration membrane, need to change or keep in repair time; must shut down and oxidation ditch be emptied; give out light by the sewage of thousands of cubes in oxidation ditch, can repair or replace, greatly wasted the time; also wasted manpower and financial resources, energy-saving and emission-reduction are real is empty talk.If hundreds of tubular type or plate-type aerator are divided into some cellular installations at the bottom of aeration basin; aeration tube or aeration plate once certain unit occur to stop up or damage and need to change; only needing that this aeration unit is mentioned to the pond water surface by lift system just can repair or replace above; and do not need to shut down emptying, really reach save time, energy-conservation.
Mostly in situation, partition wall in oxidation ditch is high 5~6 meters, ten meters of wide 40~50cm, long number, has height, narrow, long feature, and raising legs is installed, the condition utmost point fixing, balance does not possess, and safety can not get ensureing.
Utility model content
For the problems referred to above, the utility model provides a kind of partial wall raising legs of fixing and keep balance on body of wall.
For achieving the above object, the utility model leans on wall raising legs, comprise rectangular base, base fixing device, be separately positioned on four root posts of four square position of described rectangular base, the relative both sides of wherein said rectangular base arrange respectively sleeve pipe, in described sleeve pipe, telescopic pipe are set, described telescopic pipe slides along the central axis direction of described sleeve pipe, is also provided with the spacing fixing location clamp of described telescopic pipe in described rectangular base; Described base fixing device comprises at least two the first clamps that are evenly arranged on described rectangular base leading section, the adjacent end, the both sides with described sleeve pipe is set that described rectangular base leading section is rectangular base, another adjacent end of the both sides with described sleeve pipe is set of described rectangular base is rectangular base rearward end; Along the common digonal link that connects of two described columns of described sleeve pipe central axis direction, two described digonal links on four described columns, are connected altogether, described rectangular base leading section two described in column or described rectangular base rearward end two described in be provided with a winch between column, one pulley is set between digonal link described in two, one steel rope is connected with described winch by described pulley, and described steel rope is the first steel rope.
Further, described base fixing device also comprises two second clamps that are separately positioned on described telescopic pipe afterbody, and described telescopic pipe afterbody is rectangular base leading section end farthest described in distance on described telescopic pipe.
Particularly, described the first clamp and described the second clamp are detachable clamp.
Preferably, connect the second steel rope on described digonal link, described the second steel wire is provided with the second eccentric fixture block, and described the first steel rope is provided with the first eccentric fixture block.
Further, described base fixing device also comprises at least two fixed orifices that are arranged on described rectangular base rearward end.
In addition, the bottom of described rectangular base arranges wheel.
The second clamp on the first clamp and telescopic pipe in rectangular base for the utility model, is firmly fixed together rectangular base and wall stability, has realized partial wall raising legs fixing and maintenance balance on high, narrow, long body of wall; The first clamp and fixed orifice in rectangular base for the utility model, realized partial wall raising legs fixing and maintenance balance on broader body of wall.The utility model is used in combination with winch and pulley, has realized and will need lifting means to be promoted to correct position.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model leans on the rectangular base of wall raising legs;
Fig. 2 is that the embodiment 1 of the partial wall raising legs of the utility model promotes the schematic diagram that needs lifting means;
Fig. 3 is the schematic diagram that the embodiment 2 of the partial wall raising legs of the utility model promotes aeration unit;
Fig. 4 is the structural representation that the utility model leans on the embodiment 3 of wall raising legs and the rectangular base of embodiment 4.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is further described.
Embodiment 1
As shown in Figure 1, 2, partial wall raising legs of the present embodiment comprises by rectangular base 1, is separately positioned on two the first clamp 4a on rectangular base 1 and telescopic pipe 3 and two the second clamp 4b, is arranged on four root posts 6 in four holes 14 of rectangular base 1.Wherein, the relative both sides of rectangular base 1 arrange sleeve pipe 2, are provided with the telescopic pipe 3 sliding along sleeve pipe 2 central axis directions in sleeve pipe 2, are also provided with the location clamp 5 that telescopic pipe 3 is fixed in rectangular base 1; The first clamp 4a and the second clamp 4b are the base fixing device in the present embodiment, and the first clamp 4a and the second clamp 4b are detachable clamp; Between two root posts 6, be provided with a winch 7, along the common digonal link 8 that connects of two root posts of sleeve pipe 2 central axis directions, like this, two digonal links on four root posts, are connected altogether, one pulley 9 is set between digonal link 8 described in two, on described winch and described pulley, a steel rope is set jointly, described steel rope is the first steel rope 10.
Install while fixing, two the first clamp 4a in rectangular base 1 and body of wall one side are tightly fitted, because telescopic pipe 3 can be in the spacing of the interior front and back of sleeve pipe 2 slide control the first clamp 4a and the second clamp 4b according to the width of body of wall 12, telescopic pipe 3 in adjusting sleeve pipe 2, two second clamp 4b on telescopic pipe 3 and the opposite side of body of wall 12 are tightly fitted, with location clamp 5, telescopic pipe 3 is positioned to clamping again, realize the fixing of rectangular base 1 and body of wall 12.After rectangular base 1 fixes, respectively four root posts 6 are inserted in four holes 14 of rectangular base 1, then digonal link 8, winch 7 and pulley 9 are installed.Finally, four root posts, two digonal links and rectangular base form a rigid support.
When work, will need lifting means 13 use the first steel ropes 10 to fix, start winch 8, pull and need lifting means 13 to correct position by the first steel rope 10 on pulley 9.
Partial wall raising legs in the present embodiment, utilize the second clamp on the first clamp and the telescopic pipe in rectangular base that rectangular base is fixed on body of wall, in lifting process, rigid support is because the effect of under tension has the trend of toppling, but because two the first clamps and two the second clamps are clamped body of wall both sides opposing capsizing moment, rigid support does not just have the possibility of toppling, and makes the partial wall raising legs in the present embodiment can keep good stability and balance.Partial wall raising legs in the present embodiment utilizes being again used in combination of winch and pulley to need lifting means to be promoted to suitable position, makes lifting work become simple.
The first clamp in the present embodiment is set to two, is firmly fixed on body of wall for effectively ensureing that rectangular base is stable, and the quantity of the first clamp of setting should be at least two.Partial wall raising legs in the present embodiment is adapted at carrying out lifting work on height, narrow, long body of wall.
Embodiment 2
As shown in Figure 3, the difference of the partial wall raising legs in partial wall raising legs and embodiment 1 in the present embodiment is only: the first steel rope 10 is provided with the first eccentric fixture block 11, on digonal link 8, connect the second steel rope 15, the second steel ropes 15 and be provided with the second eccentric fixture block 16.
Installation fixation procedure in the present embodiment is identical with the installation fixation procedure in embodiment 1, no longer sets forth here.
When work, fix the lifting arm 18 of aeration unit 17 with the first eccentric fixture block 11, now the first steel rope 10 between the first eccentric fixture block 11 and pulley 9 is in tight state, start winch, pull lifting arm 18 by the first steel rope 10 on pulley 9, because aeration unit 17 is positioned at the bottom of cesspool, also inconvenience is fixed on the first eccentric fixture block 11 lowest positions of lifting arm 18, so promote after a period of time, aeration unit 17 is not also promoted to the cesspool water surface, just cannot upwards promote again, now, the second eccentric fixture block 16 is fixed on lifting arm 18, make the second steel rope 15 between the second eccentric fixture block 16 and digonal link 8 in tight state, then unclamp the first eccentric fixture block 11, the first eccentric fixture block 11 is moved to the lower end position of lifting arm 18, make the first steel rope 10 in tight state, unclamp the second eccentric fixture block 16, continue to promote aeration unit 17, be used alternatingly like this first eccentric fixture block 11 and the second eccentric fixture block 16, make aeration unit 17 finally be promoted to the water surface, conveniently change and maintenance work.
Partial wall raising legs in the present embodiment utilizes the combined action of the first eccentric fixture block and the second eccentric fixture block, aeration unit is promoted to the water surface of cesspool, changes or maintenance work.In the prior art, must shut down emptying cesspool, can repair or replace aeration unit, greatly waste the time, also waste manpower and financial resources.Partial wall raising legs in use the present embodiment is promoted to the water surface by aeration unit and repairs or replaces, just need not cesspool is emptying, and energy-conservation again while saving like this.
In this enforcement, because the second clamp on the first clamp and telescopic pipe in rectangular base is fixed on rectangular base on body of wall, can resist rigid support due to the trend of toppling that under tension effect produces, make the partial wall raising legs in the present embodiment can keep good stability and balance.The first clamp in the present embodiment is set to two, is firmly fixed on body of wall for effectively ensureing that rectangular base is stable, and the quantity of the first clamp of setting should be at least two.
When partial wall raising legs in use the present embodiment promotes aeration unit, adopt two partial wall formula combination raising legss jointly to carry out lifting work, the pulling force that makes so each partial wall raising legs be subject to reduces by half, and is convenient to promote, and has extended the service life of partial wall raising legs.Partial wall raising legs in the present embodiment is adapted at carrying out lifting work on height, narrow, long body of wall.
Embodiment 3
As shown in Figure 4, the difference of the partial wall raising legs in partial wall raising legs and embodiment 1 in the present embodiment is: the present embodiment replaces and in embodiment 1, is arranged on the second clamp 4b on telescopic pipe by being arranged on two fixed orifices 19 in rectangular base, that is to say, base fixing device in the present embodiment comprises two the first clamps that rectangular base leading section is set and two fixed orifices 19 that are arranged on rectangular base rearward end, described rectangular base rearward end be in described rectangular base with described rectangular base leading section end separately, the both sides that sleeve pipe is set of described rectangular base leading section and rectangular base rearward end and rectangular base are adjacent, base fixing device in the present embodiment no longer comprises the second clamp 4b being arranged on telescopic pipe.
Partial wall raising legs in the present embodiment is adapted at using on broader body of wall, and because body of wall is broader, the width of body of wall is greater than the width of rectangular base.Install while fixing, the first clamp 4a of rectangular base and a side of body of wall are tightly fitted, rectangular base is fixed on the top metope of body of wall by fixed orifice 19 with gim peg, described gim peg is pin or bolt.
The fixed orifice of base fixing device that leans on wall raising legs in the present embodiment is set to two, and for effectively guaranteeing being fixed on body of wall of rectangular base firm stable, the number of the fixed orifice of setting should be at least two.
Partial wall raising legs that is arranged so that of the fixed orifice in the present embodiment can use on broad body of wall, has increased the practicality of partial wall raising legs.
Embodiment 4
As shown in Figure 4, the difference of the partial wall raising legs in partial wall raising legs and embodiment 2 in the present embodiment is: the present embodiment replaces and in embodiment 2, is arranged on the second clamp 4b on telescopic pipe by being arranged on two fixed orifices 19 in rectangular base, that is to say, base fixing device in the present embodiment comprises two the first clamps that rectangular base leading section is set and two fixed orifices 19 that are arranged on the rearward end of rectangular base, described rectangular base leading section is relative with rearward end, the both sides that sleeve pipe is set of described rectangular base leading section and rectangular base rearward end and rectangular base are adjacent, base fixing device in the present embodiment no longer comprises the second clamp being arranged on telescopic pipe.
Partial wall raising legs in the present embodiment is adapted at using on broader body of wall, and because body of wall is broader, the width of body of wall is greater than the width of rectangular base.Install while fixing, the first clamp 4a of rectangular base and a side of body of wall are tightly fitted, rectangular base is fixed on the top metope of body of wall by fixed orifice 19 with gim peg, described gim peg is pin or bolt.
The fixed orifice of base fixing device that leans on wall raising legs in the present embodiment is set to two, and for effectively guaranteeing being fixed on body of wall of rectangular base firm stable, the number of the fixed orifice of setting should be at least two.
Partial wall raising legs that is arranged so that of the fixed orifice in the present embodiment can use on broad body of wall, has increased the practicality of partial wall raising legs.
The bottom of leaning on the rectangular base of wall raising legs in embodiment 1~4 has all configured four wheels, the arranging of wheel can make to lean on wall raising legs and move forward and backward body of wall is cofree, to lean on wall raising legs moves to optional position and carries out lifting work, such design has not only facilitated operation, save cost, and there is very strong practicality.
Above; it is only preferred embodiment of the present utility model; but protection domain of the present utility model is not limited to this; any be familiar with those skilled in the art the utility model disclose technical scope in; the variation that can expect easily or replacement, within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain that claim was defined.

Claims (5)

1. a partial wall raising legs, it is characterized in that: comprise rectangular base, base fixing device, be separately positioned on four root posts of four square position of described rectangular base, the relative both sides of wherein said rectangular base arrange respectively sleeve pipe, in described sleeve pipe, telescopic pipe are set, and in described sleeve pipe, telescopic pipe are set, described telescopic pipe slides before and after the central axis direction of described sleeve pipe, is also provided with the spacing fixing location clamp of described telescopic pipe in described rectangular base;
Described base fixing device comprises at least two the first clamps that are evenly arranged on described rectangular base leading section, the adjacent end, the both sides with described sleeve pipe is set that described rectangular base leading section is rectangular base, another adjacent end of the both sides with described sleeve pipe is set of described rectangular base is rectangular base rearward end;
Along the common digonal link that connects of two described columns of described sleeve pipe central axis direction, two described digonal links on four described columns, are connected altogether, described rectangular base leading section two described in column or described rectangular base rearward end two described in be provided with a winch between column, one pulley is set between digonal link described in two, one steel rope is connected with described winch by described pulley, and described steel rope is the first steel rope.
2. partial wall raising legs according to claim 1, it is characterized in that: described base fixing device also comprises two second clamps that are separately positioned on described telescopic pipe afterbody, described telescopic pipe afterbody is rectangular base leading section end farthest described in distance on described telescopic pipe.
3. partial wall raising legs according to claim 2, is characterized in that: on described digonal link, connect the second steel rope, described the second steel wire is provided with the second eccentric fixture block, and described the first steel rope is provided with the first eccentric fixture block.
4. partial wall raising legs according to claim 1, it is characterized in that: described base fixing device also comprises at least two fixed orifices that are arranged on described rectangular base rearward end, described rectangular base rearward end be in described rectangular base with described rectangular base leading section end separately.
5. partial wall raising legs according to claim 1, is characterized in that: the bottom of described rectangular base arranges wheel.
CN201420022891.6U 2014-01-14 2014-01-14 Wall-leaning lifting rack Expired - Lifetime CN203682952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420022891.6U CN203682952U (en) 2014-01-14 2014-01-14 Wall-leaning lifting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420022891.6U CN203682952U (en) 2014-01-14 2014-01-14 Wall-leaning lifting rack

Publications (1)

Publication Number Publication Date
CN203682952U true CN203682952U (en) 2014-07-02

Family

ID=51004887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420022891.6U Expired - Lifetime CN203682952U (en) 2014-01-14 2014-01-14 Wall-leaning lifting rack

Country Status (1)

Country Link
CN (1) CN203682952U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401891A (en) * 2014-09-22 2015-03-11 山东建筑大学 Propeller strut type lifting transporter
CN105016259A (en) * 2015-08-04 2015-11-04 天津华清健坤膜科技有限公司 Immersed membrane casting platform and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401891A (en) * 2014-09-22 2015-03-11 山东建筑大学 Propeller strut type lifting transporter
CN104401891B (en) * 2014-09-22 2016-05-25 山东建筑大学 A kind of herringbone posture hoisting transporter
CN105016259A (en) * 2015-08-04 2015-11-04 天津华清健坤膜科技有限公司 Immersed membrane casting platform and using method thereof

Similar Documents

Publication Publication Date Title
CN211256683U (en) Bracket for bridge construction
CN203682952U (en) Wall-leaning lifting rack
CN203284242U (en) Suspension type microporous aeration device
CN101905923B (en) Overwater-installed submersible water impeller
CN207064822U (en) Jig for the installation of vertical shaft interior conduit
CN210623783U (en) Pipeline fixing device is used in municipal administration plumbing construction
CN105201208A (en) System for dismantling Y-type pier column oblique rod steel mold
CN205077842U (en) Multi -use architecture support
CN205235774U (en) Hollow fiber curtain formula membrane module detection device
CN204727654U (en) Vertical-lift micro-porous aerator
CN213061799U (en) Vehicle restriction device for bridge engineering
CN104445590B (en) The Float cylinder type of aerated mixing plant installs combined bay
CN202609988U (en) Double-layer flat membrane sewage treatment equipment
CN210543535U (en) Mud scraper with quick disassembly structure
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN201485204U (en) Gas tank hanging device
CN105178695A (en) Fence convenient to detect
CN201049914Y (en) Rigid pipe vertical suspension aeration system
CN208747762U (en) Exempt to tear open and can promote micro-pore aeration system
CN219860175U (en) Municipal administration water supply and drainage send pipe erection equipment
CN215926867U (en) Frock is built to V of falling
CN204940866U (en) Y type pier stud oblique fulcrum bar punching block removes system
CN217450718U (en) Combined fountain equipment
CN220099910U (en) Building foundation pouring pile
CN210457284U (en) Precast concrete trench cover plate hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140702