CN204101700U CN201420595624.8U CN201420595624U CN204101700U CN 204101700 U CN204101700 U CN 204101700U CN 201420595624 U CN201420595624 U CN 201420595624U CN 204101700 U CN204101700 U CN 204101700U
Authority
CN
China
Prior art keywords
generator
motor
testing device
shaft coupling
frequency converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420595624.8U
Other languages
Chinese (zh)
Inventor
陈建忠
王卫国
薛继彪
胡彪
雷世超
袁维运
刘勇
鱼亚萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201420595624.8U priority Critical patent/CN204101700U/en
Application granted granted Critical
Publication of CN204101700U publication Critical patent/CN204101700U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to generator-motor testing device technical field, it is a kind of generator-motor testing device, it comprises frequency converter, motor, shaft coupling and generator, be electrically connected by cable between the signal output part of frequency converter and the signal input part of motor, the transmission output shaft of motor and the connector of shaft coupling one end are fixedly installed togather, and the transmission input shaft of generator and the connector of the shaft coupling other end are fixedly installed togather.The utility model reasonable and compact in structure, quick and easy for installation, realize generator test run electrification, start easily, reduce labour intensity, reduce noise, decrease environmental pollution, improve working environment, really accomplish that production environmental protection, noise are little, no pollution, throughout the year can work well, be desirable generator testing device, make generator trial run work efficiently more convenient, be specially adapted to the generator test run test unit used during petroleum drilling is produced.

Description

Generator-motor testing device
Technical field
the utility model relates to generator-motor testing device technical field, it is a kind of generator-motor testing device, be specially adapted to the generator-motor testing device used during petroleum drilling is produced, the generator that oil field drilling drilling team uses specifically carries out the generator-motor testing device of electrokinetic tests after repairing.
Background technology
in petroleum drilling is produced, drill crew needs generator to provide electric energy, drives the various electrical equipments produced and in life, generator in use there will be various fault, part fault must be returned factory and could repair, and in addition, generator big or middle is repaiied and also must be returned factory and carry out.These return the generator of repair in shop reason, must test, measure various output parameter after repairing, traditional generator-motor test testing device, must assemble an intact diesel engine to drive generator.This traditional generator-motor testing device exists that noise is large, environmental pollution problem greatly, not environmentally, and meanwhile, the startup of diesel engine is pretty troublesome, particularly winter, the more difficult startup of diesel engine.
Summary of the invention
the utility model provides a kind of generator-motor testing device, overcomes the deficiency of above-mentioned prior art, it effectively can solve traditional generator-motor testing device and has that noise is large, environmental pollution greatly, not environmentally, the troublesome problem of diesel engine starting in winter.
the technical solution of the utility model is realized by following measures: a kind of generator-motor testing device, comprise frequency converter, motor, shaft coupling and generator, be electrically connected by cable between the signal output part of frequency converter and the signal input part of motor, the transmission output shaft of motor and the connector of shaft coupling one end are fixedly installed togather, and the transmission input shaft of generator and the connector of the shaft coupling other end are fixedly installed togather.
here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
above-mentioned frequency converter, motor and generator are fixedly mounted in skid.
the utility model reasonable and compact in structure, quick and easy for installation, realize generator test run electrification, start easily, reduce labour intensity, reduce noise, decrease environmental pollution, improve working environment, really accomplish that production environmental protection, noise are little, no pollution, throughout the year can work well, be desirable generator testing device, make generator trial run work efficiently more convenient, be specially adapted to the generator test run test unit used during petroleum drilling is produced.
Accompanying drawing explanation
accompanying drawing 1 is the syndeton schematic diagram of the utility model most preferred embodiment.
coding in accompanying drawing is respectively: 1 is frequency converter, and 2 is motor, and 3 is cable, and 4 is shaft coupling, and 5 is generator.
Embodiment
the utility model by the restriction of following embodiment, can not determine concrete embodiment according to the technical solution of the utility model and actual conditions.
in the utility model, for convenience of description, the description of the relative position relation of each parts is all be described according to the Butut mode of Figure of description 1, as: the position relationship of upper and lower, left and right etc. determines according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the utility model is further described:
as shown in Figure 1, this generator-motor testing device comprises frequency converter 1, motor 2, shaft coupling 4 and generator 5, be electrically connected by cable 3 between the signal output part of frequency converter 1 and the signal input part of motor 2, the transmission output shaft of motor 2 and the connector of shaft coupling 4 one end are fixedly installed togather, and the transmission input shaft of generator 5 and the connector of shaft coupling 4 other end are fixedly installed togather.The utility model motor 2 replaces Diesel Driven generator, controlled by frequency converter 1 by electric energy, carry out drive motor 2 through cable 3, motor 2 is connected with generator 5 by shaft coupling 4, and then driving generator 5, the rotating speed of motor 2 is consistent with generator 5 rotating speed, because motor 2 is controlled by frequency converter 1, if due to various factors impact, rotating speed and the rated speed of generator 5 are variant, known by electromotor velocity computing formula n=60f/p, the output speed of motor 2 can be changed by the output frequency size of adjustment frequency converter 1 in frequency converter 1 allowed band, the output speed of motor 2 is made to reach the rated speed of generator 5 completely, measure the various output parameters of generator 5, meet the requirement of test, really reach the object of generator 5 test run, quick and easy for installation, realize generator 5 test run electrification, start easily, reduce labour intensity, reduce noise, decrease environmental pollution, improve working environment, really accomplish production environmental protection, noise is little, no pollution, it is desirable generator testing device, throughout the year can the device of work well.
according to actual needs, above-mentioned generator-motor testing device can be made further optimization and/or improvements:
as shown in Figure 1, frequency converter 1 and motor 2 are fixedly mounted in skid.Frequency converter 1, motor 2 and generator 5 are fixedly mounted in skid, more convenient to install and transport, especially when the generator 5 used for drill crew is tested after repairing, can as required roping to on-the-spot, interim installation is not needed yet, only need to connect device power supply (DPS), then the connector of the transmission input shaft of generator 5 and shaft coupling 4 is fixed together, make generator trial run work efficiently more convenient, be specially adapted to the generator test run test unit used during petroleum drilling is produced.
the utility model is quick and easy for installation, realize generator 5 test run electrification, start easily, reduce labour intensity, reduce noise, decrease environmental pollution, improve working environment, really accomplish that production environmental protection, noise are little, no pollution, throughout the year can work well, be desirable generator 5 testing device, make generator 5 trial run work efficiently more convenient, be specially adapted to the generator test run test unit used during petroleum drilling is produced.
above technical characteristic constitutes most preferred embodiment of the present utility model, and it has stronger adaptability and best implementation result, can increase and decrease non-essential technical characteristic according to actual needs, meet the demand of different situations.

Claims (2)

1. a generator-motor testing device, it is characterized in that comprising frequency converter, motor, shaft coupling and generator, be electrically connected by cable between the signal output part of frequency converter and the signal input part of motor, the transmission output shaft of motor and the connector of shaft coupling one end are fixedly installed togather, and the transmission input shaft of generator and the connector of the shaft coupling other end are fixedly installed togather.
2. generator-motor testing device according to claim 1, is characterized in that frequency converter, motor and generator are fixedly mounted in skid.
CN201420595624.8U 2014-10-15 2014-10-15 Generator-motor testing device Expired - Fee Related CN204101700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420595624.8U CN204101700U (en) 2014-10-15 2014-10-15 Generator-motor testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420595624.8U CN204101700U (en) 2014-10-15 2014-10-15 Generator-motor testing device

Publications (1)

Publication Number Publication Date
CN204101700U true CN204101700U (en) 2015-01-14

Family

ID=52270117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420595624.8U Expired - Fee Related CN204101700U (en) 2014-10-15 2014-10-15 Generator-motor testing device

Country Status (1)

Country Link
CN (1) CN204101700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244221A (en) * 2018-03-09 2019-09-17 中科合成油工程股份有限公司 Motor test run method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244221A (en) * 2018-03-09 2019-09-17 中科合成油工程股份有限公司 Motor test run method
CN110244221B (en) * 2018-03-09 2021-06-15 中科合成油工程有限公司 Motor test run method

Similar Documents

Publication Publication Date Title
CN105350926A (en) Super-capacitor energy storage type electric workover rig
CN105525869B (en) It can stored energy power system and energy storage type sidetracking drilling machine
CN204101700U (en) Generator-motor testing device
CN202913947U (en) Grid electrical drilling machine suitable for deep well drilling
CN204174622U (en) A kind of portable hydraulic power tightening machine
CN205477359U (en) But energy storage driving system and energy storage formula sidetracking rig
CN104863704A (en) Energy-saving engine
CN205713962U (en) Net electricity high-voltage alternating electric drive stepless speed regulation oil-well rig
CN203580673U (en) Novel hydraulic fixed-frequency vehicle-mounted frequency conversion alternating-current electricity self-generating system
CN205713959U (en) Net electricity high voltage AC frequency conversion electric drive oil-well rig
CN205049588U (en) A fault monitoring device for starter
CN105181989A (en) Fault monitoring device used for starter
CN102953677A (en) Drilling machine using motors as main power
CN104935117A (en) Torque testing device for output shaft of motor of oil pumping unit
CN202475128U (en) Single-support generator spindle
CN105840094A (en) High-voltage alternating-current electric driven stepless speed regulation petroleum drilling rig adopting network source
CN202913945U (en) Drilling machine with motor as main motive power
CN203376158U (en) Dynamic testing bench used for automatic mechanical gearbox of hybrid power vehicle
CN101581251B (en) On-vehicle machine set integrated with electricity generation and air compression
CN203362130U (en) Energy-saving transmission device of oil pumping machine
CN204623160U (en) The unpowered cementing truck in chassis
CN105840095A (en) High-voltage alternating-current variable-frequency electric driven petroleum drilling rig adopting network source
CN203434916U (en) Multi-parameter feedback dynamic control device of beam-pumping unit
CN204215265U (en) Diesel locomotive microcomputer and logic control device analog detection testing table
CN204400354U (en) A kind of heavy cable electric retracting-releasing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 838200 science and technology development department, Turpan Hami Drilling Company No. 805, Xincheng Road, Shanshan County, Turpan, the Xinjiang Uygur Autonomous Region

Patentee after: CNPC Xibu Drilling Engineering Company Limited

Address before: 834000, the Xinjiang Uygur Autonomous Region, Karamay Friendship Road No. 98 western drilling, Turpan Hami drilling company, Ministry of science and technology development

Patentee before: CNPC Xibu Drilling Engineering Company Limited

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20201015