CN204089041U - Double bundle conductor propulsion plant - Google Patents

Double bundle conductor propulsion plant Download PDF

Info

Publication number
CN204089041U
CN204089041U CN201420594360.4U CN201420594360U CN204089041U CN 204089041 U CN204089041 U CN 204089041U CN 201420594360 U CN201420594360 U CN 201420594360U CN 204089041 U CN204089041 U CN 204089041U
Authority
CN
China
Prior art keywords
screw mandrel
fixing device
rectangular frame
pulley
bundle conductor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420594360.4U
Other languages
Chinese (zh)
Inventor
俸世荣
曹博文
崔红军
刘芮
雷铭
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puer Supply Power Bureau of Yunnan Power Grid Co Ltd filed Critical Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority to CN201420594360.4U priority Critical patent/CN204089041U/en
Application granted granted Critical
Publication of CN204089041U publication Critical patent/CN204089041U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

Double bundle conductor propulsion plant, is comprised operating handle (5) and is located at the screw mandrel (4) of operating handle (5) end and is symmetricly set on the pulley fixing device (1) of screw mandrel (4) two ends by screw mandrel (4); Wherein, pulley fixing device (1) comprises a rectangular frame (1.1) and is disposed side by side on two pulleys (2) in rectangular frame (1.1), and pulley (2) is fixed on rectangular frame (1.1) by spring pin (3); Pulley fixing device (1) is connected with screw mandrel (4) by screw rod bushing (4.1).The utility model has easy to carry, simple to operate, not easily the advantage of damage wires.

Description

Double bundle conductor propulsion plant
Technical field
The present utility model belongs to electric power apparatus examination field, particularly the replacing of 220kV and above dual bundle conductor of power transmission line conductor spacer and installation.
Background technology
In order to ensure that bundle conductor wire harness spacing remains unchanged to meet electric property, reduce surface voltage gradient, and in a short-circuit situation, unlikely generation electromagnetic force between wire harness, cause the collision that attracts each other, though or cause the attraction collision of moment, accident can return to normal condition after eliminating, and thus separated by a distancely in span has installed conductor spacer.Installation interval rod also can play certain inhibitory action to the vibration of secondary span and aeolian vibration.In addition in running, conductor spacer easily damages, and some gear needs to install conductor spacer additional apart from after operation a period of time, and in the process changing conductor spacer, need a kind of wire fixing device, this wire propulsion plant solves the problem of this work.
Existing double bundle conductor fixing means and shortcoming:
Install or change at present double bundle conductor in the work of conductor spacer, usual employing driving band staff arrives assigned work position, then by the mode that rope or safety belt bundle, to keep the spacing of double bundle conductor thus to change or installation interval rod.But when running into large gear distance, be often difficult to tension rope, cause staff's physical demands excessive, the work high above the ground time is longer, increases the risk factor of this work.
Summary of the invention
The purpose of this utility model provides a kind of not easy to operate by having under the condition of Work tool to overcome the defect of above-mentioned prior art existence just, not easily causes wire to damage, reduces the double bundle conductor propulsion plant of the activity duration of work high above the ground personnel.
Double bundle conductor propulsion plant, the utility model is characterised in that, comprises operating handle and is located at the screw mandrel of operating handle end and is symmetricly set on the pulley fixing device of screw mandrel two ends by screw mandrel; Wherein, pulley fixing device comprises a rectangular frame and is disposed side by side on two pulleys in rectangular frame, and pulley is fixed on rectangular frame by spring pin; Pulley fixing device is connected with screw mandrel by screw rod bushing.
The beneficial effects of the utility model are: the pulley fixing device that the utility model connects two band assembly pulleys by screw mandrel is formed, and two pulleys of assembly pulley are used for fixing cord, and pull bar uses stringing lead.The present invention makes whole operation convenient, not easily causes wire to damage, can effectively reduce personal injury risk in installation process; Do not need during installation by other Work tools, can Fast Installation in installation process.The utility model can be finished the work under not by the condition of Work tool, and easy to operate; Reduce the activity duration of work high above the ground personnel.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Embodiment
See Fig. 1, double bundle conductor propulsion plant, the utility model is characterised in that, comprises operating handle 5 and is located at the screw mandrel 4 of operating handle 5 end and is symmetricly set on the pulley fixing device 1 of screw mandrel 4 two ends by screw mandrel 4; Wherein, two pulleys 2 that pulley fixing device 1 comprises a rectangular frame 1.1 and is disposed side by side in rectangular frame 1.1, pulley 2 is fixed on rectangular frame 1.1 by spring pin 3; Pulley fixing device 1 is connected with screw mandrel 4 by screw rod bushing 4.1.
The utility model the selection of material: finished product selects stainless steel material to make, its corrosion-resistant, corrosion resistant, light easy processing, the utility model can not use the free-hand installation of Work tool.

Claims (1)

1. double bundle conductor propulsion plant, it is characterized in that, comprise operating handle (5) and be located at the screw mandrel (4) of operating handle (5) end and be symmetricly set on the pulley fixing device (1) of screw mandrel (4) two ends by screw mandrel (4); Wherein, pulley fixing device (1) comprises a rectangular frame (1.1) and is disposed side by side on two pulleys (2) in rectangular frame (1.1), and pulley (2) is fixed on rectangular frame (1.1) by spring pin (3); Pulley fixing device (1) is connected with screw mandrel (4) by screw rod bushing (4.1).
CN201420594360.4U 2014-10-15 2014-10-15 Double bundle conductor propulsion plant Expired - Lifetime CN204089041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420594360.4U CN204089041U (en) 2014-10-15 2014-10-15 Double bundle conductor propulsion plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420594360.4U CN204089041U (en) 2014-10-15 2014-10-15 Double bundle conductor propulsion plant

Publications (1)

Publication Number Publication Date
CN204089041U true CN204089041U (en) 2015-01-07

Family

ID=52181713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420594360.4U Expired - Lifetime CN204089041U (en) 2014-10-15 2014-10-15 Double bundle conductor propulsion plant

Country Status (1)

Country Link
CN (1) CN204089041U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242155A (en) * 2014-10-15 2014-12-24 云南电网公司普洱供电局 Pushing device for double-splitting guide line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242155A (en) * 2014-10-15 2014-12-24 云南电网公司普洱供电局 Pushing device for double-splitting guide line

Similar Documents

Publication Publication Date Title
CN203481420U (en) Grounding wire device used for power transmission line overhauling
CN204089041U (en) Double bundle conductor propulsion plant
CN103427370A (en) Strain insulator string live replacing device for high-voltage transmission line
CN104242155A (en) Pushing device for double-splitting guide line
CN202268654U (en) Stay wire bend elbow booster
CN203367873U (en) A walking-pulley cleaner
CN202817596U (en) Protection tool for clearing sundries on power transmission line
CN203225480U (en) Pulley-type wire tensioner
CN103219673A (en) Pulley-type tightener
CN103247972B (en) Wire tractor
CN203061758U (en) Telescopic gripping mechanism of cylinder gasket
CN202977160U (en) Electric remote control lead traction apparatus for transformer high-voltage bushing
CN203251019U (en) A line strain clamp winding device
CN204247725U (en) Wire drawing machine pointing machine
CN204265112U (en) Portable wire wound bracket for earch wrie
CN104075939B (en) Pulling force test clamp
CN203398490U (en) Sliding contact line with traction device
CN102437538A (en) Cable tube-piercing traction device
CN202487790U (en) Pre-twisted full tension force splicing strip
CN202570837U (en) Winding mechanism on inverted plum blossom-type winding machine
CN202678853U (en) Cross-linked cable stripping cutter
CN205076558U (en) Wire and cable tension adjusting device
CN206023136U (en) A kind of bypass lead-up cable fixing device
CN104201602A (en) Charged replacement method for whole string of insulators of ultra-high-voltage transmission line, and hardware fitting thereof
CN202717467U (en) Elevator carriage crossbar safety tongs lifting mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150107