CN104242155A - Pushing device for double-splitting guide line - Google Patents

Pushing device for double-splitting guide line Download PDF

Info

Publication number
CN104242155A
CN104242155A CN201410542839.8A CN201410542839A CN104242155A CN 104242155 A CN104242155 A CN 104242155A CN 201410542839 A CN201410542839 A CN 201410542839A CN 104242155 A CN104242155 A CN 104242155A
Authority
CN
China
Prior art keywords
rectangular frame
double
guide line
lead screw
pulley fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410542839.8A
Other languages
Chinese (zh)
Inventor
俸世荣
曹博文
崔红军
刘芮
雷铭
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puer Supply Power Bureau of Yunnan Power Grid Co Ltd filed Critical Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority to CN201410542839.8A priority Critical patent/CN104242155A/en
Publication of CN104242155A publication Critical patent/CN104242155A/en
Pending legal-status Critical Current

Links

Landscapes

  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Abstract

The invention provides a pushing device for a double-splitting guide line. The device comprises an operating handle (5), a lead screw (4) which is arranged at the end part of the operating handle (5), and pulley fixing devices (1) which are symmetrically arranged at two end heads of the lead screw (4) through the lead screw (4); each pulley fixing device (1) comprises a rectangular frame (1.1), and two pulleys (2) which are arranged in parallel into the rectangular frame (1.1); the pulleys (2) are fixed to the rectangular frame (1.1) through a spring pin (3); the pulley fixing devices (1) are connected with the lead screw (4) through a lead screw sleeve (4.1). The pushing device for the double-splitting guide line has the advantages of being convenient to carry and simple to operate, and the guide line is uneasily damaged.

Description

Double bundle conductor propulsion plant
Technical field
The present invention's invention belongs to electric power apparatus examination field, particularly the replacing of 220kV and above dual bundle conductor of power transmission line conductor spacer and installation.
Background technology
In order to ensure that bundle conductor wire harness spacing remains unchanged to meet electric property, reduce surface voltage gradient, and in a short-circuit situation, unlikely generation electromagnetic force between wire harness, cause the collision that attracts each other, though or cause the attraction collision of moment, accident can return to normal condition after eliminating, and thus separated by a distancely in span has installed conductor spacer.Installation interval rod also can play certain inhibitory action to the vibration of secondary span and aeolian vibration.In addition in running, conductor spacer easily damages, and some gear needs to install conductor spacer additional apart from after operation a period of time, and in the process changing conductor spacer, need a kind of wire fixing device, this wire propulsion plant solves the problem of this work.
Existing double bundle conductor fixing means and shortcoming:
Install or change at present double bundle conductor in the work of conductor spacer, usual employing driving band staff arrives assigned work position, then by the mode that rope or safety belt bundle, to keep the spacing of double bundle conductor thus to change or installation interval rod.But when running into large gear distance, be often difficult to tension rope, cause staff's physical demands excessive, the work high above the ground time is longer, increases the risk factor of this work.
Summary of the invention
Object of the present invention provides a kind of not easy to operate by having under the condition of Work tool to overcome the defect of above-mentioned prior art existence just, not easily causes wire to damage, reduces the double bundle conductor propulsion plant of the activity duration of work high above the ground personnel.
Double bundle conductor propulsion plant, the present invention is characterised in that, comprises operating handle and is located at the screw mandrel of operating handle end and is symmetricly set on the pulley fixing device of screw mandrel two ends by screw mandrel; Wherein, pulley fixing device comprises a rectangular frame and is disposed side by side on two pulleys in rectangular frame, and pulley is fixed on rectangular frame by spring pin; Pulley fixing device is connected with screw mandrel by screw rod bushing.
Beneficial effect of the present invention is: the pulley fixing device that the present invention connects two band assembly pulleys by screw mandrel is formed, and two pulleys of assembly pulley are used for fixing cord, and pull bar uses stringing lead.The present invention makes whole operation convenient, not easily causes wire to damage, can effectively reduce personal injury risk in installation process; Do not need during installation by other Work tools, can Fast Installation in installation process.The present invention can finish the work under not by the condition of Work tool, and easy to operate; Reduce the activity duration of work high above the ground personnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Embodiment
See Fig. 1, double bundle conductor propulsion plant, the present invention is characterised in that, comprises operating handle 5 and is located at the screw mandrel 4 of operating handle 5 end and is symmetricly set on the pulley fixing device 1 of screw mandrel 4 two ends by screw mandrel 4; Wherein, two pulleys 2 that pulley fixing device 1 comprises a rectangular frame 1.1 and is disposed side by side in rectangular frame 1.1, pulley 2 is fixed on rectangular frame 1.1 by spring pin 3; Pulley fixing device 1 is connected with screw mandrel 4 by screw rod bushing 4.1.
The selection of material of the present invention: finished product selects stainless steel material to make, its corrosion-resistant, corrosion resistant, light easy processing, the present invention can not use the free-hand installation of Work tool.

Claims (1)

1. double bundle conductor propulsion plant, it is characterized in that, comprise operating handle (5) and be located at the screw mandrel (4) of operating handle (5) end and be symmetricly set on the pulley fixing device (1) of screw mandrel (4) two ends by screw mandrel (4); Wherein, pulley fixing device (1) comprises a rectangular frame (1.1) and is disposed side by side on two pulleys (2) in rectangular frame (1.1), and pulley (2) is fixed on rectangular frame (1.1) by spring pin (3); Pulley fixing device (1) is connected with screw mandrel (4) by screw rod bushing (4.1).
CN201410542839.8A 2014-10-15 2014-10-15 Pushing device for double-splitting guide line Pending CN104242155A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410542839.8A CN104242155A (en) 2014-10-15 2014-10-15 Pushing device for double-splitting guide line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410542839.8A CN104242155A (en) 2014-10-15 2014-10-15 Pushing device for double-splitting guide line

Publications (1)

Publication Number Publication Date
CN104242155A true CN104242155A (en) 2014-12-24

Family

ID=52229752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410542839.8A Pending CN104242155A (en) 2014-10-15 2014-10-15 Pushing device for double-splitting guide line

Country Status (1)

Country Link
CN (1) CN104242155A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786149A (en) * 2016-12-22 2017-05-31 国家电网公司 Wire outlet driving
CN107809091A (en) * 2017-12-18 2018-03-16 国网河南省电力公司洛阳供电公司 A kind of double bundle conductor conductor spacer installs auxiliary rod

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997044875A1 (en) * 1996-05-17 1997-11-27 Vew Energie Aktiengesellschaft Field spacer for bunched conductors
CN202495706U (en) * 2012-01-19 2012-10-17 福建省电力有限公司厦门电业局 Electrified installation tool for double split conductor spacer
CN202721383U (en) * 2012-04-27 2013-02-06 山西省电力公司大同供电分公司 Slidable distance-limiting device for twin bundle conductor
CN203339624U (en) * 2013-07-27 2013-12-11 国家电网公司 Double bundled sub-conductor spacer for phase to ground spacer
CN204089041U (en) * 2014-10-15 2015-01-07 云南电网公司普洱供电局 Double bundle conductor propulsion plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997044875A1 (en) * 1996-05-17 1997-11-27 Vew Energie Aktiengesellschaft Field spacer for bunched conductors
CN202495706U (en) * 2012-01-19 2012-10-17 福建省电力有限公司厦门电业局 Electrified installation tool for double split conductor spacer
CN202721383U (en) * 2012-04-27 2013-02-06 山西省电力公司大同供电分公司 Slidable distance-limiting device for twin bundle conductor
CN203339624U (en) * 2013-07-27 2013-12-11 国家电网公司 Double bundled sub-conductor spacer for phase to ground spacer
CN204089041U (en) * 2014-10-15 2015-01-07 云南电网公司普洱供电局 Double bundle conductor propulsion plant

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786149A (en) * 2016-12-22 2017-05-31 国家电网公司 Wire outlet driving
CN106786149B (en) * 2016-12-22 2018-07-31 国家电网公司 Conducting wire outlet driving
CN107809091A (en) * 2017-12-18 2018-03-16 国网河南省电力公司洛阳供电公司 A kind of double bundle conductor conductor spacer installs auxiliary rod

Similar Documents

Publication Publication Date Title
CN206876514U (en) A kind of finished cable Apparatus for Bending at low-temp
CN104242155A (en) Pushing device for double-splitting guide line
CN204089041U (en) Double bundle conductor propulsion plant
CN103427370A (en) Strain insulator string live replacing device for high-voltage transmission line
CN102969676A (en) Cable laying device adopting guiding type control of fixed pulleys
CN203301063U (en) Bird nest removing apparatus
CN204689242U (en) A kind of base pipe automatic rolling device
CN202725887U (en) Special device for pull wire manufacture
CN103247972B (en) Wire tractor
CN203225480U (en) Pulley-type wire tensioner
CN204414015U (en) A kind of bolt disassembly device
CN204068045U (en) Transmission line wire conductor spacer maintenance aid
CN104075939B (en) Pulling force test clamp
CN204265112U (en) Portable wire wound bracket for earch wrie
CN204346826U (en) A kind of clamping guiding device of steel cord Residual torsion automatic checkout equipment
CN102447222A (en) Disconnecting switch overhaul lifting appliance
CN103015784B (en) Adjusting device for steel pylon component
CN206023136U (en) A kind of bypass lead-up cable fixing device
CN103904582B (en) Powered installation wind-driven cleaning ring for insulator instrument
CN204216495U (en) Strand mill formula take up reel
CN204038894U (en) A kind of driving system being applicable to the useless equipment of cities and towns dirt
CN203589667U (en) Guiding and wiring device for power cable take-up machine
CN202717467U (en) Elevator carriage crossbar safety tongs lifting mechanism
CN203800482U (en) Strain-resistant double-string insulator replacing tool
CN204079092U (en) A kind of concentric type jing character type wire installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224