CN204080749U - The flexible trash block system in a kind of plant without storage - Google Patents

The flexible trash block system in a kind of plant without storage Download PDF

Info

Publication number
CN204080749U
CN204080749U CN201420565651.0U CN201420565651U CN204080749U CN 204080749 U CN204080749 U CN 204080749U CN 201420565651 U CN201420565651 U CN 201420565651U CN 204080749 U CN204080749 U CN 204080749U
Authority
CN
China
Prior art keywords
wire rope
electric winch
steel bracket
pulley
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420565651.0U
Other languages
Chinese (zh)
Inventor
周二保
肖何
章忠安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATANG CHENCUN HYDROPOWER PLANT
Original Assignee
DATANG CHENCUN HYDROPOWER PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATANG CHENCUN HYDROPOWER PLANT filed Critical DATANG CHENCUN HYDROPOWER PLANT
Priority to CN201420565651.0U priority Critical patent/CN204080749U/en
Application granted granted Critical
Publication of CN204080749U publication Critical patent/CN204080749U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the flexible trash block system in a kind of plant without storage, comprise motor, A.C. contactor, also comprise n root steel bracket (1), n >=2, m root wire rope (2), m >=3, nylon wire (3), electric winch (4) and pulley (5), wherein, described wire rope (2) is arranged on the pulley (5) of steel bracket (1), wire rope (2) is arranged nylon wire (3), electric winch (4) connecting steel wire ropes (2), motor, A.C. contactor are electrically connected with electric winch (4).The utility model structure is simple, and civil engineering is few, does not change dam hydraulic structure original structure, is convenient to field conduct; Easy operation easy to use, maintenance and repair can be carried out in conjunction with unit annual overhaul, and construction investment is lower, and economy is suitable for again.Execute-in-place simple and convenient, the problem that labour intensity is large, security risk is large of manually removing contamination before effectively solving dam.

Description

The flexible trash block system in a kind of plant without storage
Technical field
The utility model relates to one and blocks dirty device, particularly blocks dirty device before a kind of water power dam.
Background technology
The main source of dirt before water power dam: one is upper water power plant tail water to household garbage, the blowdown gurry in the interval rural area of intake gate and market town, and two is the floating things on tributary, three is the weeds of grow prolifically on wild pasture and water in channel and bank slope.The kind of dirt mainly contains pasture and water, straw, bamboo wood, branch, round log, plastic waste material, spoil etc.A part for dirt is that floating state moves in current, and under normal circumstances, the floating dirt of this class can be stopped by the dirty ridge of blocking in power station substantially.But, in dirt more flood season or heavy rain period, because dirt comes that amount is large and rapidly, a large amount of floating thing is piled up before blocking the dirty ridge, and form abundant plate in blocks, thickness can reach several meters.When these dirts can not be removed in time, under the effect of current, a part can from before blocking and climbing under the dirty ridge and enter turbine-generator units trash rack for water inlet.Another part of dirt is in suspended state in current, and pass under water, their movement is arranged by flow velocity and fluidised form.Due to during unit normal power generation before water inlet flow velocity maximum, dirt moves after entering forebay immediately before trash rack for water inlet.Wherein bamboo wood, branch, pasture and water etc. are attracted on grizzly bar along with entering grid current, mutually entwine on top, grid face, make rapidly power station trashrack be blocked by dirt, not only make unit output greatly decline, and trashrack and water inlet also there will be certain vibration simultaneously.When blocking serious, a trashrack just must be cleared up in left and right every three days under normal circumstances.Rainstorm weather, because the dirt entering trashrack is many especially, almost cleaning every day once.Under extreme case, power station is forced to use dam upper cantilever crane and lifts by crane trashrack under moving water state, and by artificial rake except adsorbing the dirt be wrapped on grid face.Carry trashrack remove contamination period, trashrack bottom dirt often can have no stop enter water inlet.Little dirt flows through the hydraulic turbine and drains into downstream from draft tube, but large round log and tree root often by jam between fixing guide vane and movable guide vane, water turbine shear pin is cut off, and unit can not orderly closedown, is forced to the process of upper gate maintenance down.And fixing guide vane and movable guide vane are by foreign body from blocking, easily cause fluidised form in runner uneven, make unit generation irregular oscillation and abnormal sound.The normal power generation that above-mentioned situation has all had a strong impact on unit is run.
Conventional hydropower station is problem of removing contamination before solution dam, working method that general employing is manually removed contamination or trash rake is removed contamination.Manually remove contamination as personnel carry out dirt salvage on dirt-removing ship; labour intensity is large, operating environment is severe; easily there is personnel's heatstroke and drowning incident in long-time operation at sea; operating efficiency is not high yet; and must carry out in compressor emergency shutdown situation; indirectly add hydropower station loss, reduce power station economic benefit.Trash rake working method of removing contamination has comprehensive performance of removing contamination, can under various operating mode safety, reliably carry out, but device trash rake need consider hydroulic sturcture structure, size, space layout etc., engineering construction investment and risk larger.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of plant without storage flexible trash block system, and concrete technical scheme is as follows:
The flexible trash block system in a kind of plant without storage, comprises motor, A.C. contactor and button, also comprises n root steel bracket, n >=2, m root wire rope, m >=3, nylon wire, electric winch and pulley, wherein, described wire rope is arranged on the pulley of steel bracket, and nylon wire arranged by wire rope, electric winch connecting steel wire ropes, motor, A.C. contactor are electrically connected with electric winch.。
Further, described steel bracket is divided into two-layer up and down, and the identical bolt hole of x spacing is beaten, 7≤x≤15 with within the scope of 1 meter, lower floor upper end in lower end, upper strata.
Further, upper and lower two of described wire rope is connected with electric winch by the pulley be fixed on steel bracket, and middle steel cable is fixed between steel bracket.
The beneficial effect of technique scheme of the present utility model is as follows:
The utility model structure is simple, and civil engineering is few, does not change dam hydraulic structure original structure, is convenient to field conduct; Remove contamination in turbine-generator units not shutdown situation simultaneously, especially better for interception results such as pasture and water, branch, stalk, bamboo wood, reduce shutdown and to remove contamination power generation loss, add power station economic benefit; The personnel that have also been changed drag for careless clean-up operation mode on the water surface, and reduction personnel remove contamination workload before dam, ensure that personal safety; Easy operation easy to use, maintenance and repair can be carried out in conjunction with unit annual overhaul, and construction investment is lower, and economy is suitable for again.Execute-in-place simple and convenient, the problem that labour intensity is large, security risk is large of manually removing contamination before effectively solving dam.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the annexation schematic diagram of the utility model electric winch, wire rope and pulley;
Fig. 3 is the utility model steel bracket annexation schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, principle of the present utility model and feature are described.
Select the relatively little place of a span in front left right bank phytal zone, dam, plant without storage, be arranged vertically two steel brackets 1.As shown in Figure 3, steel bracket 1 is divided into two-layer up and down, 10 φ 18 bolts hole are opened every uniform distances within the scope of lower end, upper strata and lower floor's upper end length one meter, by bolt, upper and lower for steel bracket 1 layer is connected firmly, ensure that steel bracket 1 can adjust height within the scope of one meter by connecting different bolts hole, meet run-off river power station upper pond level when changing within the scope of one meter, nylon wire 3 can effectively tackle dirt before dam.After steel bracket 1 lower end fixation, 2 pulleys 5 arranged by every root steel bracket 1, pulley 5 height and between the upper and lower distance need be determined according to upstream water level scope and nylon wire size Selection, and the general distance water surface is about 50cm.
On two steel brackets 1, in selection, a wire rope 2 is fixed in lower sheave 5 centre position, and auxiliary nylon wire 3 is located.On dam, front bank and steel bracket 1 opposite position construct platform install an electric winch 4, upper and lower two wire rope of steel bracket are connected in electric winch 4 by pulley 5, are arranged on by nylon wire 3 after on wire rope 2 wire rope 2 end is fixing on electric winch.At an electric winch 4 other installation motor, the speed of the wire rope 2 that stretches by set of gears gear control electric winch 4, shrink.Motor, through certain electric loop, realizes motor break-in by A.C. contactor and button, controls hoist engine 4 and stretches or shrink wire rope 2.
As shown in Figure 2, upper and lower wire rope is a rope, is gone in ring arrange by pulley 5.Nylon wire 3 upper end is fixed on wire rope 2, lower wire rope and remaining wire rope 2 play auxiliary positioning effect, prevent from nylon wire in receipts network process from twining to stir, pass through after hoist engine work counterclockwise or rotate clockwise, drive wire rope 2 thus drive nylon wire 3 to move.
After Installation and Debugging complete, only need human users's contactor and button, just can realize hoist engine and drive wire rope 2, by soil transfer on nylon wire 3 to river bank, carry out labor cleaning.Clear up rear operation contactor and button, wire rope 2 has been returned to intercepting position.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. the flexible trash block system in plant without storage, comprise motor, A.C. contactor, it is characterized in that, also comprise n root steel bracket (1), n >=2, m root wire rope (2), m >=3, nylon wire (3), electric winch (4) and pulley (5), wherein
Described wire rope (2) is arranged on the pulley (5) of steel bracket (1), wire rope (2) is arranged nylon wire (3), electric winch (4) connecting steel wire ropes (2), motor, A.C. contactor are electrically connected with electric winch (4).
2. the flexible trash block system in plant without storage as claimed in claim 1, is characterized in that: described steel bracket (1) is divided into two-layer up and down, and the identical bolt hole of x spacing is beaten, 7≤x≤15 with within the scope of 1 meter, lower floor upper end in lower end, upper strata.
3. the flexible trash block system in plant without storage as claimed in claim 1, it is characterized in that: upper and lower two of described wire rope (2) is connected with electric winch (4) by the pulley (5) be fixed on steel bracket (1), and middle steel cable (2) is fixed between steel bracket.
CN201420565651.0U 2014-09-28 2014-09-28 The flexible trash block system in a kind of plant without storage Expired - Fee Related CN204080749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420565651.0U CN204080749U (en) 2014-09-28 2014-09-28 The flexible trash block system in a kind of plant without storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420565651.0U CN204080749U (en) 2014-09-28 2014-09-28 The flexible trash block system in a kind of plant without storage

Publications (1)

Publication Number Publication Date
CN204080749U true CN204080749U (en) 2015-01-07

Family

ID=52173484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420565651.0U Expired - Fee Related CN204080749U (en) 2014-09-28 2014-09-28 The flexible trash block system in a kind of plant without storage

Country Status (1)

Country Link
CN (1) CN204080749U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790363A (en) * 2015-04-28 2015-07-22 绍兴文理学院 Winch-lifted automatic intercepting device for river floatage
CN111832830A (en) * 2020-07-21 2020-10-27 河南郑大水利科技有限公司 Tail water level-based big data optimization operation method for radial flow type hydropower station
CN112144490A (en) * 2020-09-04 2020-12-29 华北水利水电大学 River channel cleaning system adopting telescopic trash rack

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790363A (en) * 2015-04-28 2015-07-22 绍兴文理学院 Winch-lifted automatic intercepting device for river floatage
CN111832830A (en) * 2020-07-21 2020-10-27 河南郑大水利科技有限公司 Tail water level-based big data optimization operation method for radial flow type hydropower station
CN111832830B (en) * 2020-07-21 2022-12-16 河南郑大水利科技有限公司 Tail water level-based big data optimization operation method for radial flow type hydropower station
CN112144490A (en) * 2020-09-04 2020-12-29 华北水利水电大学 River channel cleaning system adopting telescopic trash rack

Similar Documents

Publication Publication Date Title
CN204959707U (en) Ecological fishway of multiple -step type
CN204080749U (en) The flexible trash block system in a kind of plant without storage
CN107034861B (en) Mixed fishway capable of adapting to upstream large-water-level amplitude variation
CN107140743B (en) Self-protection ecological floating bed suitable for flood-carrying river channel
CN200971489Y (en) Turning gate
CN110747818A (en) Sewage collection treatment device for semi-gear type sewage barrier
CN205492149U (en) Fish device is blocked in fish gathering pond
CN204570641U (en) Dirty device is blocked in power station
CN108782478A (en) Jellyfish intercepts finishing device and its application method
CN108265686A (en) A kind of van-type steel blocks dirty drift
CN102400452A (en) Dirt preventing facility and construction method thereof
CN215052778U (en) Hydraulic engineering water inlet hydraulic collection floats thing net bars clearly
CN209114454U (en) A kind of multi-functional sluice based on the transformation of single function sluice
JP2011226108A (en) Water level following removal device of water flow floats using stream energy
CN204662391U (en) A kind of river floater automatic intercepting device of hoist engine lifting
CN114753304A (en) Hydraulic engineering slope protection device with buffer gear
CN106869089A (en) A kind of clear sand device of river course gate sediment trapping
CN208136878U (en) A kind of van-type steel blocks dirty drift
CN208917805U (en) River sea offshore estuary source rubbish intercepts and collects serial control system
CN108661021B (en) System for controlling interception and collection of source garbage at coastal entrance of river
CN202390815U (en) Antifouling facility
CN207582444U (en) A kind of continuous type river contaminants-collecting apparatus
CN112400819A (en) Fish trapping system and method suitable for mountainous rivers in fish elevator engineering
CN107034866B (en) Method and device for cleaning garbage on water surface at water inlet of unit of hydraulic power plant
CN211142985U (en) Sewage collection treatment device for semi-gear type sewage barrier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20150928