CN204058351U - For the broken wall hammer that hot furnace wall is safeguarded - Google Patents

For the broken wall hammer that hot furnace wall is safeguarded Download PDF

Info

Publication number
CN204058351U
CN204058351U CN201420494097.1U CN201420494097U CN204058351U CN 204058351 U CN204058351 U CN 204058351U CN 201420494097 U CN201420494097 U CN 201420494097U CN 204058351 U CN204058351 U CN 204058351U
Authority
CN
China
Prior art keywords
hammer
adapter sleeve
broken wall
furnace wall
vertical axes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420494097.1U
Other languages
Chinese (zh)
Inventor
李强
闫小平
王晓川
崔光
赵云翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuanhua Iron and Steel Group Co Ltd
Original Assignee
Xuanhua Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuanhua Iron and Steel Group Co Ltd filed Critical Xuanhua Iron and Steel Group Co Ltd
Priority to CN201420494097.1U priority Critical patent/CN204058351U/en
Application granted granted Critical
Publication of CN204058351U publication Critical patent/CN204058351U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A kind of broken wall hammer safeguarded for hot furnace wall, belong to coke oven repair tool technical field, its technical scheme is, it comprises base, vertical axes, adapter sleeve, broken wall hammer, turning handle and push-pull rod, the lower end of described vertical axes is fixed on base, and on a vertical axis, the hammer handle rear end of described broken wall hammer is fixed on the sidewall of adapter sleeve described adapter sleeve pine cover, one end of described turning handle is fixedly connected with the sidewall of adapter sleeve, and the other end is hinged by the front end of vertical bearing pin and push-pull rod.The utility model utilizes push-pull rod and turning handle to drive adapter sleeve to rotate around vertical axes, and then drives broken wall hammer to beat the furnace wall brick of damage.Utilize this device, hot repair operator just can remove the furnace wall brick damaged easily without the need to entering coking chamber, not only greatly reduce the labour intensity of operator, and can ensure the personnel safety of operator.

Description

For the broken wall hammer that hot furnace wall is safeguarded
Technical field
The utility model relates to and a kind ofly to use in the hot maintenance process of coke oven, can fast dismantling except the device of coking chamber sick brick within the walls, belong to coke oven repair tool technical field.
Background technology
In coking by coke oven process, coaling, to discharge of the coke and switch fire door all can cause in-furnace temperature to change repeatedly, the thermal stresses caused thus will inevitably damage the furnace wall brick of coking chamber, especially, after body of heater enters aging, therefore usually there is fusion hole in the furnace wall brick of coking chamber, cause coal gas blowby, chimney over-emitting black exhaust, not only wasted energy but also contaminate environment, and therefore must carry out sectional repair to furnace wall, and re-started after the silica brick producing fusion hole is removed and build by laying bricks or stones.
For avoiding excessive temperature differentials to damage normal furnace wall, when carrying out sectional repair to furnace wall, the furnace wall brick that coke furnace carbonization chamber has damaged removed by needs under comparatively high temps (about 400 DEG C).Traditional method for dismounting puts on proximity suit by hot repair operator, and putting on the helmet and asbestos gloves, to enter width be the furnace wall brick that the indoor iron hammer of hot charing of about 450mm beats damage.Because working space is narrow, operator can only adopt the posture of semi-crouch of leaning to one side, and operation easier and labour intensity are comparatively large, and operator are easy to be burnt.
Utility model content
The purpose of this utility model is the drawback for prior art, provides a kind of broken wall hammer safeguarded for hot furnace wall, to reduce the dismounting difficulty damaging furnace wall brick, ensures the personnel safety of operator.
Problem described in the utility model realizes with following technical proposals:
A kind of broken wall hammer safeguarded for hot furnace wall, formation comprises base, vertical axes, adapter sleeve, broken wall hammer, turning handle and push-pull rod, the lower end of described vertical axes is fixed on base, described adapter sleeve pine cover on a vertical axis, the hammer handle rear end of described broken wall hammer is fixed on the sidewall of adapter sleeve, one end of described turning handle is fixedly connected with the sidewall of adapter sleeve, and the other end is hinged by the front end of vertical bearing pin and push-pull rod.
The above-mentioned broken wall hammer safeguarded for hot furnace wall, also comprises altitude mixture control sleeve in formation, and described altitude mixture control sleeve set is on a vertical axis and between base and adapter sleeve.
The above-mentioned broken wall hammer safeguarded for hot furnace wall, the hammer handle of described turning handle and broken wall hammer is located in the same horizontal plane, and angle is therebetween 80 ° ~ 100 °.
The utility model utilizes push-pull rod and turning handle to drive adapter sleeve to rotate around vertical axes, and then drives broken wall hammer to beat the furnace wall brick of damage.Utilize this device, hot repair operator just can remove the furnace wall brick damaged easily without the need to entering coking chamber, not only greatly reduce the labour intensity of operator, and can ensure the personnel safety of operator.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Each label in figure: 1, base; 2, altitude mixture control sleeve; 3, adapter sleeve; 4, vertical axes, 5, broken wall hammer, 6, turning handle, 7, bearing pin, 8, connecting joint, 9, push-pull rod.
Embodiment
Referring to Fig. 1, the utility model comprises base 1, altitude mixture control sleeve 2, adapter sleeve 3, vertical axes 4, broken wall hammer 5, turning handle 6, bearing pin 7, connecting joint 8 and push-pull rod 9.Base 1 is welded into channel-section steel, the width of base 1 is slightly less than coking chamber insied width, vertical axes 4 is welded on base 1, adapter sleeve 3 is enclosed within vertical axes 4, the hammer handle of broken wall hammer 5 is fixed on adapter sleeve 3, one end of turning handle 6 is welded on adapter sleeve 3, and the other end is hinged with the connecting joint 8 being welded on push-pull rod 9 front end by bearing pin 7.Select suitable altitude mixture control sleeve 2 according to the height that need beat furnace wall and be enclosed within vertical axes 4.
Remove coking chamber within the walls sick brick time, with push-pull rod 9 broken wall hammer 5 pushed the corresponding position in coking chamber together with base 1, altitude mixture control sleeve 2, adapter sleeve 3, vertical axes 4, turning handle 6 etc., the tup making brokenly wall hammer 5 into shape aims at the sick brick of the furnace wall that need beat, push-and-pull push-pull rod 9 repeatedly, until operator enter coking chamber cleaning chute again after being removed by sick brick, after cleaning terminates, furnace wall is repaired.
The utility model structure is simple, easy to operate, and working efficiency is high, not only reduces the labour intensity of hot repair operator, and avoids the injury entering coking chamber and cause operator.

Claims (3)

1. the broken wall hammer safeguarded for hot furnace wall, it is characterized in that, it comprises base (1), vertical axes (4), adapter sleeve (3), broken wall hammer (5), turning handle (6) and push-pull rod (9), the lower end of described vertical axes (4) is fixed on base (1), described adapter sleeve (3) pine is enclosed within vertical axes (4), the hammer handle rear end of described broken wall hammer (5) is fixed on the sidewall of adapter sleeve (3), one end of described turning handle (6) is fixedly connected with the sidewall of adapter sleeve (3), and the other end is hinged with the front end of push-pull rod (9) by vertical bearing pin (7).
2. a kind of broken wall hammer safeguarded for hot furnace wall according to claim 1, it is characterized in that, also comprise altitude mixture control sleeve (2) in formation, described altitude mixture control sleeve (2) is sleeved on vertical axes (4) and goes up and be positioned between base (1) and adapter sleeve (3).
3. a kind of broken wall hammer safeguarded for hot furnace wall according to claim 1 and 2, it is characterized in that, the hammer handle of described turning handle (6) and broken wall hammer (5) is located in the same horizontal plane, and angle is therebetween 80 ° ~ 100 °.
CN201420494097.1U 2014-08-29 2014-08-29 For the broken wall hammer that hot furnace wall is safeguarded Expired - Fee Related CN204058351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420494097.1U CN204058351U (en) 2014-08-29 2014-08-29 For the broken wall hammer that hot furnace wall is safeguarded

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420494097.1U CN204058351U (en) 2014-08-29 2014-08-29 For the broken wall hammer that hot furnace wall is safeguarded

Publications (1)

Publication Number Publication Date
CN204058351U true CN204058351U (en) 2014-12-31

Family

ID=52199903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420494097.1U Expired - Fee Related CN204058351U (en) 2014-08-29 2014-08-29 For the broken wall hammer that hot furnace wall is safeguarded

Country Status (1)

Country Link
CN (1) CN204058351U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111500299A (en) * 2020-05-07 2020-08-07 攀钢集团西昌钢钒有限公司 Coke oven wall breaking and dismantling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111500299A (en) * 2020-05-07 2020-08-07 攀钢集团西昌钢钒有限公司 Coke oven wall breaking and dismantling device

Similar Documents

Publication Publication Date Title
CN202226816U (en) Graphite scrapping pusher ram for coke oven carbonization chamber
CN104357067B (en) Maintenance of coke oven method
CN109294601B (en) Rapid repairing method for bottom of carbonization chamber of coke oven
CN204058351U (en) For the broken wall hammer that hot furnace wall is safeguarded
CN205556724U (en) A smooth hammer of improved generation for quick replacement blast -furnace tuyere
CN204848914U (en) Demolish blast furnace stave's portal frame device
CN109181716A (en) A kind of coke oven furnace wall perforation fast repairing method
CN113150800A (en) Coke oven inspection robot
CN110330986B (en) Method for replacing bottom bricks of carbonization chamber of coke oven
CN104949139B (en) Thermal hardware with slag removal equipment
CN208104288U (en) The furnace wall that coke furnace carbonization chamber carries out in production repairs Special combined tools
CN203798180U (en) Calcium carbide furnace calcium carbide sensible heat recovery device
CN108277025A (en) The furnace wall method for repairing and mending and Special combined tools that coke furnace carbonization chamber carries out in production
CN104031660B (en) Coke oven hot repair coking chamber wall broken hole position brick slag method for cleaning
CN211575887U (en) Roasting furnace burner block extractor
CN209371283U (en) A kind of station boiler coke cleaning tool
CN202576338U (en) Device for cleaning coke oven vertical flue
CN208366072U (en) A kind of converter steel scrap apparatus for baking
CN200949091Y (en) Carbonizing stove apparatus capable of firing high-heating charcoal
CN205099623U (en) Coke oven carbomorphism room graphite sweeper
CN219239573U (en) Coke pushing device of coke pushing vehicle
CN202450039U (en) Furnace baking device for dry quenching furnace
CN202993871U (en) Movable flue gas recovering system
CN202379941U (en) Repairing hanger basket of expansion joints at inlet and outlet of coke dry quenching (CDQ) primary deduster
CN215560059U (en) High-temperature coke cleaning tool retained in coke oven

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20160829