CN204043536U - Be applicable to the blasting system of rockmass high slope - Google Patents
Be applicable to the blasting system of rockmass high slope Download PDFInfo
- Publication number
- CN204043536U CN204043536U CN201420301225.6U CN201420301225U CN204043536U CN 204043536 U CN204043536 U CN 204043536U CN 201420301225 U CN201420301225 U CN 201420301225U CN 204043536 U CN204043536 U CN 204043536U
- Authority
- CN
- China
- Prior art keywords
- blasting
- charge
- blasting charge
- hole
- cartridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005422 blasting Methods 0.000 title claims abstract description 87
- 239000002360 explosive Substances 0.000 claims abstract description 8
- 239000000839 emulsion Substances 0.000 claims description 3
- 239000011435 rock Substances 0.000 abstract description 24
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000004880 explosion Methods 0.000 abstract description 3
- 230000011218 segmentation Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000035939 shock Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Abstract
Be applicable to the blasting system of rockmass high slope, comprise blasting cartridge, the blasting charge, primacord; The length of described blasting cartridge is identical with the degree of depth in big gun hole in high slope, and the top of blasting cartridge is sealed by explosion-proof packed layer; The described blasting charge is divided into the blasting charge at the bottom of hole and the unsettled blasting charge; At the bottom of described hole, the blasting charge is arranged on the bottom of blasting cartridge, and the quantity of the unsettled blasting charge is multiple, is successively set on the blasting charge at the bottom of hole and between explosion-proof packed layer; Described primacord is the blasting charge at the bottom of connecting hole and the unsettled blasting charge successively.The utility model utilizes the segmentation of the blasting charge to install, form batch (-type) explosion, can significantly stop and cushion the energy of explosive blasting release, thus greatly reduce the impact of blast to surrounding rock body, avoid and a large amount of crack is produced to the rock of big gun hole half periphery, thus the stability of country rock after significantly increasing rock mass engineering project Blasting Excavation, economic benefit is huge.
Description
Technical field
The utility model relates to a kind of blasting system being applicable to rockmass high slope.
Background technology
Along with the development of science and technology, the continuous quickening of China's pace of construction, various construction project is as water power, railway, highway and mine etc., constantly develop in depth, large-scale high gradient slope continues to bring out, the stability problem of thing followed rockmass high slope also highlights day by day, and the stability of rockmass high slope dynamical problem embodies in many aspects.
In Practical Project rock mass, rock side slope is not many times one piece of entirety, and there is many joints and crack in the middle of it, this is combined by various structural plane and structure, and this also form the difference composition structure of side slope.Common rock mass structure type can be divided into: block structure, mosaic texture, cataclastic texture, layer structure, stratiform cataclastic texture, prose style free from parallelism structure.The intensity of jointed rock mass, distortion and stability mainly affect by structural plane.For the rock mass of different types of structure, the character of its vibrations reaction is also different.Blocky structural rock mass good integrity, the deformation behaviour under dynamic action is close to Homogeneous Elastic Solid, and stability is better.Mosaic texture rock mass may cause avalanche and the falling rocks of local under shock effect, but generally unstable failure can not occur.Rock-mass with cataclastic texture reacts than stronger under shock effect, likely chipping Structure Rock loosen thus cause large-scale avalanche, falling rocks and small-scale slip.By roofing control, under effect of vibration, also may there is large-scale landslide and fluent in Bedded Rocks.
From the shock-effect that slope construction Excavation blasting produces, the important external factor of stability of slope, more and more receives the concern of people as an influence.
Utility model content
The technical problem that the utility model solves is that providing a kind of can significantly stop and reduce the blasting system that be applicable to high slope of explosive charge to the enormous impact that rock mass produces, to solve the landslide of causing in rockmass high slope digging process and fluent problem mentioned in above-mentioned background technology.
To achieve these goals, the technical problem that the utility model solves realizes by the following technical solutions:
Be applicable to the blasting system of high slope, comprise blasting cartridge, the blasting charge, primacord; The length of described blasting cartridge is identical with the degree of depth in big gun hole in high slope, and the top of blasting cartridge is sealed by explosion-proof packed layer; The described blasting charge is divided into the blasting charge at the bottom of hole and the unsettled blasting charge; At the bottom of described hole, the blasting charge is arranged on the bottom of blasting cartridge, and the quantity of the unsettled blasting charge is multiple, be successively set on the blasting charge at the bottom of hole and explosion-proof packed layer sealing between; Described primacord is the blasting charge at the bottom of connecting hole and the unsettled blasting charge successively.
Further, at the bottom of described hole, the height of explosive in blasting cartridge is between 0.9-1.1mm.
Further, the described unsettled blasting charge is emulsion, and the weight of the unsettled blasting charge is 150g.
Further, described explosion-proof packed layer is sealed in the height in blasting cartridge is between 0.9-1.1mm.
beneficial effect
The utility model utilizes the segmentation of the blasting charge to install, form batch (-type) explosion, can significantly stop and cushion the energy of explosive blasting release, thus greatly reduce the impact of blast to surrounding rock body, avoid and a large amount of crack is produced to the rock of big gun hole half periphery, thus the stability of country rock after significantly improving rock mass engineering project Blasting Excavation, economic benefit is huge.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is high slope steel for shot profile.
Detailed description of the invention
In order to make actualizing technology means of the present utility model, creation characteristic, reach object and effect is easy to understand, below in conjunction with concrete diagram, set forth the utility model further.
As shown in Figure 1, be applicable to the blasting system of high slope, comprise blasting cartridge 1, the blasting charge, primacord 5; The length of described blasting cartridge 1 is identical with the degree of depth in big gun hole in high slope, and the top of blasting cartridge 1 is sealed by explosion-proof packed layer 4, and the height of explosion-proof packed layer 4 in blasting cartridge 1 is between 0.9-1.1mm; The described blasting charge is divided into the blasting charge 2 at the bottom of hole and the unsettled blasting charge 3; At the bottom of described hole, the blasting charge 2 is arranged on the bottom of blasting cartridge 1, at the bottom of hole, the height of the blasting charge 2 in blasting cartridge 1 is between 0.9-1.1mm, and the unsettled blasting charge 3 is emulsion, and weight is 150g, the quantity of the unsettled blasting charge 3 is multiple, to be successively set at the bottom of hole between the blasting charge 2 and explosion-proof packed layer 4; Described primacord 5 is the blasting charge 2 at the bottom of connecting hole and the unsettled blasting charge 3 successively.
As shown in Figure 2, first in the high slope needing excavation, big gun hole is bored, big gun hole is divided into main quick-fried big gun hole 6, buffering big gun hole 7 and presplitting big gun hole 8, then, degree of depth difference according to big gun hole selects the utility model with big gun hole adaptation, and the present invention is put into big gun hole, and primacord 5 is outside in big gun hole, pull primacord 5 to ignite the utility model, and then the high slope that needs are excavated is separated landing according to design direction.
The utility model is by installing explosive segmentation, and with a primacord, each section of blasting charge is connected, thus form batch (-type) explosion, can significantly stop and cushion the energy of explosive blasting release, thus greatly reduce the impact of blast to surrounding rock body, avoid and a large amount of crack is produced to the rock of big gun hole half periphery, thus the stability of country rock after significantly improving rock mass engineering project Blasting Excavation, economic benefit is huge.
More than show and describe general principle of the present utility model, principal character and advantage of the present utility model.The technical staff of the industry should understand, the utility model is not restricted to the described embodiments, what describe in above-described embodiment and description just illustrates principle of the present utility model, under the prerequisite not departing from the utility model spirit and scope, the utility model also has various changes and modifications, such as: explosive cartridge suggestion fragility pvc pipe (rainy day construction) or paper web all can, primacord is the blasting charge at the bottom of connecting hole and the unsettled blasting charge successively, after pulling primacord, ignite from the top down or outside in, the concrete time interval considers that Test in Situ characteristic and construction are specifically determined, etc..These changes and improvements all fall within the scope of claimed the utility model.Claimed scope of the present utility model is defined by appending claims and equivalent thereof.
Claims (1)
1. be applicable to the blasting system of rockmass high slope, comprise blasting cartridge, the blasting charge, primacord; It is characterized in that, the length of described blasting cartridge is identical with the degree of depth in big gun hole in high slope, and the top of blasting cartridge is sealed by explosion-proof packed layer; The described blasting charge is divided into the blasting charge at the bottom of hole and the unsettled blasting charge; At the bottom of described hole, the blasting charge is arranged on the bottom of blasting cartridge, and the quantity of the unsettled blasting charge is multiple, is successively set on the blasting charge at the bottom of hole and between explosion-proof packed layer; Described primacord is the blasting charge at the bottom of connecting hole and the unsettled blasting charge successively.
2. the blasting system being applicable to rockmass high slope according to claim 1, is characterized in that, at the bottom of described hole, the height of explosive in blasting cartridge is between 0.9-1.1mm.
3. the blasting system being applicable to rockmass high slope according to claim 1, is characterized in that, the described unsettled blasting charge is emulsion, and the weight of the unsettled blasting charge is 150g.
4. the blasting system being applicable to rockmass high slope according to claim 1, is characterized in that, the described explosion-proof packed layer height be sealed in blasting cartridge is between 0.9-1.1mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420301225.6U CN204043536U (en) | 2014-06-09 | 2014-06-09 | Be applicable to the blasting system of rockmass high slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420301225.6U CN204043536U (en) | 2014-06-09 | 2014-06-09 | Be applicable to the blasting system of rockmass high slope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204043536U true CN204043536U (en) | 2014-12-24 |
Family
ID=52244189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420301225.6U Expired - Fee Related CN204043536U (en) | 2014-06-09 | 2014-06-09 | Be applicable to the blasting system of rockmass high slope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204043536U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104729369A (en) * | 2015-03-05 | 2015-06-24 | 中国水利水电第五工程局有限公司 | Smooth blasting method applied to soft rock and extremely soft rock |
CN110926287A (en) * | 2019-12-20 | 2020-03-27 | 深圳市蛇口招商港湾工程有限公司 | Cutting earth and rock excavation blasting method |
-
2014
- 2014-06-09 CN CN201420301225.6U patent/CN204043536U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104729369A (en) * | 2015-03-05 | 2015-06-24 | 中国水利水电第五工程局有限公司 | Smooth blasting method applied to soft rock and extremely soft rock |
CN110926287A (en) * | 2019-12-20 | 2020-03-27 | 深圳市蛇口招商港湾工程有限公司 | Cutting earth and rock excavation blasting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Huang et al. | Hydraulic fracturing after water pressure control blasting for increased fracturing | |
CN103953390B (en) | The water-retaining production Tight filling method of control overlying mining rock crack and subsidence | |
Wang et al. | Geomechanics model test research on automatically formed roadway by roof cutting and pressure releasing | |
CN103498680B (en) | Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate | |
CN107133381B (en) | Method for determining length of anchor rod for roadway support | |
CN103902780A (en) | Method for predicting deformation of solid-filled coal mining surfaces | |
CA2986062A1 (en) | Fully mechanized mining-filling mixed mining working face filling section length determination method | |
CN103527231B (en) | The roadway support test preparation method of analog simulation model | |
CN102777185A (en) | Inclined well shaft construction technology | |
CN104088662A (en) | Construction method of gob-side entry retaining wall of solid filling coal mining | |
CN115030722B (en) | Goaf lag filling efficient water retention coal mining method | |
CN204043536U (en) | Be applicable to the blasting system of rockmass high slope | |
CN104074534A (en) | Gob-side entry retaining method of fully-mechanized mining/full-mechanized caving mining working face | |
CN106761745A (en) | The outer sublevel open stope method of arteries and veins | |
CN104727847A (en) | Non chain pillar gob-side entry retaining method with filling wall self-erasure | |
Xu et al. | Numerical simulation of coupled gas flow in failure process of gassy coal-rock. | |
CN202543863U (en) | Rock plug body structure | |
Yin et al. | Simulation on the deformation and failure response features and stability of a slope from open pit mining to underground mining under the effecting of excavation goaf by the floor friction model | |
CN202938853U (en) | Coal mining area tunnel simulation blasting experiment apparatus | |
Wu et al. | Study on surrounding rock stability mechanism of gob-side entry retaining with prefabricated fracture | |
CN202648553U (en) | Cushion pad capable of greatly increasing stability in blasting excavation of rock slope | |
CN203729961U (en) | Device for improving drilling gas extraction efficiency | |
CN204646257U (en) | Coal seam group with near interval underlying seam back surpasses forestope grouting and reinforcing device | |
Xie et al. | Technique of top coal caving with vibration | |
CN113982581B (en) | Stability control method for overburden seepage isolation zone based on low-carbon mining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141224 Termination date: 20180609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |