CN204040304U - For the prefabricated units wallboard in house - Google Patents

For the prefabricated units wallboard in house Download PDF

Info

Publication number
CN204040304U
CN204040304U CN201420358371.2U CN201420358371U CN204040304U CN 204040304 U CN204040304 U CN 204040304U CN 201420358371 U CN201420358371 U CN 201420358371U CN 204040304 U CN204040304 U CN 204040304U
Authority
CN
China
Prior art keywords
wallboard
steel mesh
mesh reinforcement
house
prefabricated units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420358371.2U
Other languages
Chinese (zh)
Inventor
郭嘉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Shun Shun waterproof Engineering Co., Ltd.
Original Assignee
Wenzhou Hailan Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hailan Industrial Design Co Ltd filed Critical Wenzhou Hailan Industrial Design Co Ltd
Priority to CN201420358371.2U priority Critical patent/CN204040304U/en
Application granted granted Critical
Publication of CN204040304U publication Critical patent/CN204040304U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

A kind of prefabricated units wallboard for house, be made up of pouring concrete, two-layer steel mesh reinforcement is provided with in described wallboard, tilting and be staggeredly provided with some braces between two-layer steel mesh reinforcement, the two ends of this brace are fixed together with steel mesh reinforcement respectively, and the upper and lower limit of described wallboard is provided with some connecting through holes.The utility model has that cost is low, intensity is high, lightweight, cement affinity are good, operating efficiency high.It adopts mould shape to produce, and polishing is carried out on surface, and therefore appearance and size is accurate, installs very simple; This wallboard does not ftracture after installing and can save white washed wall operation simultaneously, thus improves construction quality, and substantially reduces construction period.

Description

For the prefabricated units wallboard in house
Technical field
The utility model relates to a kind of building wall board, especially relates to a kind of prefabricated units wallboard for house.
Background technology
Loam brick is ruined field because of it and is fetched earth seriously, and energy consumption is large, and block is little, and efficiency of construction is low, and masonry is from great, and the shortcomings such as the body of wall shock resistance difference of building by laying bricks or stones, country expressly prohibits the use.At present, air-entrained concrete building block, as a kind of materials for wall of novel environment friendly, starts to replace loam brick.But in use, it is found that air-entrained concrete building block also exists that cost is high, low strength, contraction is large, wet guilding is poor, with the shortcoming such as the bad adhesion of mortar, the body of wall of building by laying bricks or stones easily ftracture, therefore hinder it to a certain extent and apply.
Utility model content
The utility model object is to provide a kind of prefabricated units wallboard for house, to solve the technical problems such as cost existing for existing materials for wall is high, low strength, efficiency of construction are low, easy to crack.
The utility model mainly solves above-mentioned technical problem by following technical proposals: it is made up of pouring concrete, two-layer steel mesh reinforcement is provided with in described wallboard, tilting and be staggeredly provided with some braces between two-layer steel mesh reinforcement, the two ends of this brace are fixed together with steel mesh reinforcement respectively, the upper and lower limit of described wallboard is provided with some connecting through holes, and described steel mesh reinforcement is made up of the hand-drawn wire of longitudinal diameter to be the reinforcing bar of 12mm and horizontal diameter be 5mm.
As preferably, the spacing between described connecting through hole is 600mm, and described left end connecting hole is 300mm apart from the distance on the left side with the distance on right-hand member connecting hole distance the right.
The utility model has that cost is low, intensity is high, lightweight, cement affinity are good, operating efficiency high.It adopts mould shape to produce, and polishing is carried out on surface, and therefore appearance and size is accurate, installs very simple; This wallboard does not ftracture after installing and can save white washed wall operation simultaneously, thus improves construction quality, and substantially reduces construction period.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the technical solution of the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Fig. 1 is structural representation of the present utility model.This wallboard 6 is made up of pouring concrete, is provided with two-layer steel mesh reinforcement 2,3 in wallboard 6, and steel mesh reinforcement is tied up (or welding) by the hand-drawn wire 4 of longitudinal diameter to be the reinforcing bar 5 of 12mm and horizontal diameter be 5mm and formed.The spacing of above-mentioned two steel mesh reinforcements is 50mm-60mm, and steel mesh reinforcement is 5-10mm apart from the distance of surfaces of wall.
Tilting and be staggeredly provided with some braces 1 between two-layer steel mesh reinforcement 2,3, the two ends of this brace 1 are fixed together with (weld or tie up) respectively with the sideline of steel mesh reinforcement, be provided with some connecting through holes 7 on the upper and lower limit of wallboard.This connecting through hole 7 can be used as the basic point be connected and fixed with column, beam.
In order to allow the uniform force of wallboard, the spacing the best between described connecting through hole 7 is 600mm.Meanwhile, during in order to ensure the splicing of two blocks of wallboards, the spacing between two connecting through holes 7 of its joint portion is similarly 600mm, and described left end connecting hole 71 is all arranged to 300mm apart from the distance on the left side and right-hand member connecting hole 72 apart from the distance on the right.
When the utility model is produced, first two-layer steel mesh reinforcement 2,3 and brace 1 are all tied up fixing after, be placed in template, then by pouring concrete in template, after concrete setting, namely form removal, finally become this innovative panellised wall by its surface finish.

Claims (2)

1. the prefabricated units wallboard for house, be made up of pouring concrete, it is characterized in that being provided with two-layer steel mesh reinforcement in described wallboard, tilting and be staggeredly provided with some braces between two-layer steel mesh reinforcement, the two ends of this brace are fixed together with steel mesh reinforcement respectively, the upper and lower limit of described wallboard is provided with some connecting through holes, and described steel mesh reinforcement is made up of the hand-drawn wire of longitudinal diameter to be the reinforcing bar of 12mm and horizontal diameter be 5mm.
2. the prefabricated units wallboard for house according to claim 1, is characterized in that the spacing between described connecting through hole is 600mm, and described left end connecting hole is 300mm apart from the distance on the left side and the distance on right-hand member connecting hole distance the right.
CN201420358371.2U 2014-07-01 2014-07-01 For the prefabricated units wallboard in house Expired - Fee Related CN204040304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420358371.2U CN204040304U (en) 2014-07-01 2014-07-01 For the prefabricated units wallboard in house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420358371.2U CN204040304U (en) 2014-07-01 2014-07-01 For the prefabricated units wallboard in house

Publications (1)

Publication Number Publication Date
CN204040304U true CN204040304U (en) 2014-12-24

Family

ID=52240987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420358371.2U Expired - Fee Related CN204040304U (en) 2014-07-01 2014-07-01 For the prefabricated units wallboard in house

Country Status (1)

Country Link
CN (1) CN204040304U (en)

Similar Documents

Publication Publication Date Title
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN204531076U (en) Light steel latticework cast-in-place foamed concrete combined wall
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN103835521A (en) Brick wall reinforcing method and structure
CN105464382A (en) Building block and constructional column integrated construction method and constructional column formwork building block
CN108661202A (en) A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method
CN104404864A (en) Steel bar inner core double T-shaped plate
CN105178503A (en) Prefabricated external insulation wallboard
CN209723369U (en) Light sandwich concrete masonry is used for the structure and wall body structure of cold district
CN104005511B (en) High-performance water cement mortar plate built-in light ecological material T-shaped insulating bearing building block
CN103758254A (en) Plastic plate internal mould cement mortar wall body and construction method thereof
CN204040304U (en) For the prefabricated units wallboard in house
CN204023877U (en) A kind of house pre-cast building wallboard
CN203716343U (en) Plastic sheet internal mold cement mortar wall body
CN103590508A (en) Composite thermal insulating wall structure and construction method thereof
CN205444514U (en) Bearing light insulation intergral template
CN209053376U (en) A kind of porous brick external decoration wall cladding system
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN102535847A (en) Method for constructing gypsum self-insulation outer wall block masonry
CN206174194U (en) Heat retaining masonry structure
CN102322022A (en) Construction method for concrete of decorative housing of cable stayed bridge
CN204000958U (en) A kind of novel ater-casting place braced structures
CN106522483A (en) Supporting tool for controlling flatness of small-gradient sloping roof
CN213418106U (en) Building external wall heat insulation building block
CN203891299U (en) Hollow block connecting piece

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WU FAMING

Effective date: 20150703

Owner name: ZHANG JIAN

Free format text: FORMER OWNER: WENZHOU HAILAN INDUSTRIAL DESIGN CO., LTD.

Effective date: 20150703

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Jian

Inventor after: Wu Faming

Inventor before: Guo Jiachuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GUO JIACHUAN TO: ZHANG JIAN WU FAMING

TR01 Transfer of patent right

Effective date of registration: 20150703

Address after: 404100 No. 4-14-1, Tian Lu, sandy area, Chongqing

Patentee after: Zhang Jian

Patentee after: Wu Faming

Address before: Three Yang Ouhai District 325014 Zhejiang city of Wenzhou Province Huang Yu Cun street in front of the temple building 6 Building 1, second floor

Patentee before: Wenzhou sea blue industrial design Co., Ltd

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151016

Address after: 400030, Tian Lu 4-14-1, Shapingba District, Chongqing

Patentee after: Chongqing Shun Shun waterproof Engineering Co., Ltd.

Address before: 404100, Tian Lu 4-14-1, Shapingba District, Chongqing

Patentee before: Zhang Jian

Patentee before: Wu Faming

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20170701