CN204030151U - Peak valley socket - Google Patents

Peak valley socket Download PDF

Info

Publication number
CN204030151U
CN204030151U CN201420468846.3U CN201420468846U CN204030151U CN 204030151 U CN204030151 U CN 204030151U CN 201420468846 U CN201420468846 U CN 201420468846U CN 204030151 U CN204030151 U CN 204030151U
Authority
CN
China
Prior art keywords
peak
electricity
socket
time
over switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420468846.3U
Other languages
Chinese (zh)
Inventor
韩良
赵韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang YongChang Meter Co Ltd
Original Assignee
Zhejiang YongChang Meter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang YongChang Meter Co Ltd filed Critical Zhejiang YongChang Meter Co Ltd
Priority to CN201420468846.3U priority Critical patent/CN204030151U/en
Application granted granted Critical
Publication of CN204030151U publication Critical patent/CN204030151U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Details Of Connecting Devices For Male And Female Coupling (AREA)

Abstract

The utility model provides peak valley socket, belongs to Electro-metering equipment technical field.It is too complicated that it has solved the existing socket design of using at paddy electricity, and its function singleness, cannot solve in esse defect, can not meet user's the problems such as demand.This peak valley socket, in Socket casing, be provided with peak-trough electricity energising change over switch, also have the daylight-saving time abroad, device and setting control the controlling timer of power-on time during the changing of setting-up time in replaceable electricity using at the peak time period in summertime and common electricity using at the peak time period corresponding change time block, described peak-trough electricity energising change over switch is electrically connected with power supply and socket copper core respectively, time block during described changing in device and peak-trough electricity energising change over switch is electrically connected, and described controlling timer is electrically connected with the modular converter that peak-trough electricity is switched in change over switch.The utlity model has the power-off of peak electricity, the energising of paddy electricity, change-over time precisely, can divide the advantages such as period in summertime and common period.

Description

Peak valley socket
Technical field
The utility model belongs to Electro-metering equipment technical field, refers in particular to a kind of peak valley socket.
Background technology
According to national energy industry development plan, the power supply system of electricity price between peak and valley is widelyd popularize.
At present, many families are provided with peak and valley time ammeter, and come into operation, and this class electricity is list-directed is the whole piece circuit of family, the crest segment of different electrical equipment or paddy section Operational Zone cannot be separated, and therefore, the expenditure of the electricity charge is not significantly reduced.
In order to solve the problem that said structure exists, just Chinese patent literature discloses the socket that some paddy electricity section energisings are used now, but their structural design is too complicated, and its function singleness, cannot solve in esse defect, can not meet user's demand.
Summary of the invention
The purpose of this utility model is to provide a kind of peak valley socket.
The purpose of this utility model is achieved in that
Peak valley socket, it is characterized in that: in Socket casing, be provided with peak-trough electricity energising change over switch, also have the daylight-saving time abroad, device and setting control the controlling timer of power-on time during the changing of setting-up time in replaceable electricity using at the peak time period in summertime and common electricity using at the peak time period corresponding change time block, described peak-trough electricity energising change over switch is electrically connected with power supply and socket copper core respectively, time block during described changing in device and peak-trough electricity energising change over switch is electrically connected, and described controlling timer is electrically connected with the modular converter that peak-trough electricity is switched in change over switch.
In above-mentioned peak valley socket, described controlling timer comprises countdown module and time setting button.
In above-mentioned peak valley socket, countdown module is provided with a default countdown long value, and the time of pressing is set button and reduces countdown long value, when countdown long value is zero, by automatic redirect, is default value.
In above-mentioned peak valley socket, described modular converter is contactor or the plug-in strip with automatic trip function.
In above-mentioned peak valley socket, described socket is provided with the display screen that can show peak-trough electricity period, energising countdown, and the display chip of display screen is electrically connected to respectively time block in peak-trough electricity energising change over switch, device and controlling timer while changing.
The utility model compared to existing technology outstanding and useful technique effect is:
1, the utility model auto-breaking when peak electricity is automatically switched on when paddy electricity, uses the electrical equipment of this socket to move at Gu electricity Shi, and electrical equipment reduces the expense of power consumption thus, has saved the electricity consumption spending of the environment such as factory, family.
2, in peak-trough electricity energising change over switch of the present utility model, be provided with the time block of adjustable period, guarantee with peak-trough electricity with mark.
3, device more regulates the change-over time of peak-trough electricity energising change over switch for period in summertime and common period during of the present utility model changing, and has therefore avoided the period to change and has caused the different target problems of peak-trough electricity.
4, the utility model can arrange the energising duration of socket, and timing can guarantee the charging duration of charging device, has avoided the generation of all kinds of accidents.
5, controlling timer of the present utility model is set simply, and it has preset countdown section, and it is long that the time of can pressing is set button minimizing countdown, presses setting button and only subtracts and do not increase, the default countdown section of automatic recovery after countdown finishes in operation.
6, the utility model is owing to having possessed peak-trough electricity regularly start-stop, summertime and the replacing of common period, the controlled function of socket work duration, having reached assurance synchronizes with peak valley mark, saving electricity consumption expenditure, electrical equipment uses safer reliable, has also responded the call that national energy-saving reduces discharging.
Accompanying drawing explanation
Fig. 1 is structural principle schematic diagram of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, with specific embodiment, the utility model is further described, referring to Fig. 1:
Peak valley socket, device 2 and set and control the controlling timer 3 of power-on time while being provided with the changing of setting-up time in peak-trough electricity energising change over switch 1, replaceable electricity using at the peak time period in summertime and common electricity using at the peak time period corresponding change time block in Socket casing, described peak-trough electricity energising change over switch is electrically connected with power supply 4 and socket copper core 5 respectively, during described changing, device 2 is electrically connected with the time block 6 in peak-trough electricity energising change over switch, and described controlling timer 3 is electrically connected with the modular converter 7 in peak-trough electricity energising change over switch.
Described controlling timer comprises countdown module 8 and time setting button 9.
Described modular converter 7 is contactor or the plug-in strip with automatic trip function.
Described socket is provided with the display screen that can show peak-trough electricity period, energising countdown, and the display chip of display screen is electrically connected to respectively time block 6 in peak-trough electricity energising change over switch, device 2 and controlling timer 3 while changing.
Display screen can display working condition, and the present period, the countdown of work is long.
Above-described embodiment is only preferred embodiment of the present utility model, not limits according to this protection range of the present utility model, therefore: all equivalences of doing according to structure of the present utility model, shape, principle change, within all should being covered by protection range of the present utility model.

Claims (4)

1. peak valley socket, it is characterized in that: in Socket casing, be provided with peak-trough electricity energising change over switch (1), device (2) and set and control the controlling timer (3) of power-on time during the changing of setting-up time in replaceable electricity using at the peak time period in summertime and common electricity using at the peak time period corresponding change time block, described peak-trough electricity energising change over switch is electrically connected with power supply (4) and socket copper core (5) respectively, during described changing, device (2) is electrically connected with the time block (6) in peak-trough electricity energising change over switch, described controlling timer (3) is electrically connected with the modular converter (7) in peak-trough electricity energising change over switch.
2. peak valley socket according to claim 1, is characterized in that: described controlling timer comprises countdown module (8) and time setting button (9).
3. peak valley socket according to claim 1, is characterized in that: described modular converter (7) is contactor or the plug-in strip with automatic trip function.
4. peak valley socket according to claim 1, it is characterized in that: described socket is provided with the display screen that can show peak-trough electricity period, energising countdown, the display chip of display screen is electrically connected to respectively time block (6) in peak-trough electricity energising change over switch, device (2) and controlling timer (3) while changing.
CN201420468846.3U 2014-08-19 2014-08-19 Peak valley socket Expired - Fee Related CN204030151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420468846.3U CN204030151U (en) 2014-08-19 2014-08-19 Peak valley socket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420468846.3U CN204030151U (en) 2014-08-19 2014-08-19 Peak valley socket

Publications (1)

Publication Number Publication Date
CN204030151U true CN204030151U (en) 2014-12-17

Family

ID=52069981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420468846.3U Expired - Fee Related CN204030151U (en) 2014-08-19 2014-08-19 Peak valley socket

Country Status (1)

Country Link
CN (1) CN204030151U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167644A (en) * 2014-08-19 2014-11-26 浙江永昌仪表有限公司 Peak and valley socket
CN108957073A (en) * 2018-06-29 2018-12-07 宁波三星智能电气有限公司 A kind of intelligent electric meter settlement method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167644A (en) * 2014-08-19 2014-11-26 浙江永昌仪表有限公司 Peak and valley socket
CN104167644B (en) * 2014-08-19 2016-08-17 浙江永昌仪表有限公司 Peak valley socket
CN108957073A (en) * 2018-06-29 2018-12-07 宁波三星智能电气有限公司 A kind of intelligent electric meter settlement method
CN108957073B (en) * 2018-06-29 2020-09-08 宁波三星智能电气有限公司 Intelligent electric meter settlement method

Similar Documents

Publication Publication Date Title
CN202737259U (en) Intelligent timing socket
CN104167644B (en) Peak valley socket
CN204030151U (en) Peak valley socket
CN203115243U (en) Low-power-consumption control circuit of solenoid valve
CN204103816U (en) Motor load change automatic control electricity-saving device
CN201917867U (en) Hibernating and waking-up circuit of microprocessor
CN103618178A (en) Zero-standby zero power consumption energy-saving socket
CN202856098U (en) Electromagnetic clockwork spring type automatic power-off socket
CN201509092U (en) Charging device for electric tool
CN207123743U (en) Pig house environment low power-consumption intelligent monitoring device
CN201743516U (en) Rapid heating electric kettle base
CN205128164U (en) A control system for pneumatic discharge valve of milling machine
CN203012634U (en) Computer energy-saving device capable of automatically cutting off power supply
CN205157643U (en) Take energy -conserving accounting device's energy -conserving cabinet
CN215219455U (en) Base station energy-saving management intelligent control system
CN204680846U (en) A kind of power controls energy-saving socket table
CN204573728U (en) Multi-function desk lamp
CN203038070U (en) Electricity-saving device and energy-saving system using the same
CN201523126U (en) Timing energy-saving socket
CN203573908U (en) Fixed-time automatic switching-off energy-saving device
CN202633679U (en) Energy-saving socket for set top box
CN201515518U (en) Low power consumption standby circuit device of electromagnetic oven
CN202068493U (en) Remote control shutdown circuit for liquid crystal television set
CN203012630U (en) Computer timing switch device
CN2850196Y (en) Roadlamp electricity saver

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20180819