CN204027420U - A kind of Air-Cooling Island auto-flushing and spike cooling system - Google Patents

A kind of Air-Cooling Island auto-flushing and spike cooling system Download PDF

Info

Publication number
CN204027420U
CN204027420U CN201420450234.1U CN201420450234U CN204027420U CN 204027420 U CN204027420 U CN 204027420U CN 201420450234 U CN201420450234 U CN 201420450234U CN 204027420 U CN204027420 U CN 204027420U
Authority
CN
China
Prior art keywords
air
contactor
cooling
flushing
alternating current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420450234.1U
Other languages
Chinese (zh)
Inventor
殷进军
赵亚梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN HENGTE ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
XI'AN HENGTE ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN HENGTE ELECTRONIC TECHNOLOGY Co Ltd filed Critical XI'AN HENGTE ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201420450234.1U priority Critical patent/CN204027420U/en
Application granted granted Critical
Publication of CN204027420U publication Critical patent/CN204027420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • B08B3/024Cleaning by means of spray elements moving over the surface to be cleaned

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model discloses a kind of Air-Cooling Island auto-flushing and spike cooling system, comprise the upper rail and the lower guideway that are arranged on respectively Air-Cooling Island cooling unit above and below, power plant, between upper rail and lower guideway, be provided with for giving the Air-Cooling Island cooling unit flusher that water spray rinses and lowers the temperature, the driving mechanism for driving flusher to move along upper rail and lower guideway is installed on flusher; Driving mechanism is connected with three phase mains by two A.C. contactors in parallel.The utility model can make Air-Cooling Island fin surface clean on the one hand, heat-transfer effect improves, and heat-exchange capacity improves, and can make generating set vacuum improve 3-5KPa simultaneously, generating set generating capacity in the situation that other operating modes are constant increases by 3%, unit Reducing Coal Consumption 5-8g/Kwh.For separate unit 300,000 thermal power generation units, by annual this technology, put into operation and calculate for 2880 hours, can save coal-fired expense more than 2,160,000 yuan, can reach 2,592 ten thousand Kwh by multiple electric weight, effectiveness of operation increases by 829.44 ten thousand yuan, and energy-saving effect can be good.

Description

A kind of Air-Cooling Island auto-flushing and spike cooling system
Technical field
The utility model technology belongs to power industry field of energy-saving technology, is specifically related to a kind of Air-Cooling Island auto-flushing and spike cooling system.
Background technology
Air cooled generator group Air-Cooling Island is subject to such environmental effects at present, cause that Air-Cooling Island fin surface is dirty, fouling, affected greatly the cooling effect of Air-Cooling Island, also affected the operational efficiency of the economy of generating set, particularly hot summer environment, heat transfer effect reduction due to Air-Cooling Island, cause unit vacuum significantly to reduce, backpressure rising, has seriously restricted unit on-load ability, energy consumption significantly increases, and to enterprise, causes great waste.Therefore, design a kind of new system, thoroughly solve the dirty problem in surface that Air-Cooling Island radiating fin causes due to environmental pollution, in summer, under hot environment, play cooling effect, make Air-cooled Unit generator operation at full capacity, just seem particularly important simultaneously.Air-Cooling Island auto-flushing, cooling system working method should be: manual mode and automated manner.Full-automatic mode should be: meet 2-4 face simultaneously and rinse simultaneously, by PLC Long-distance Control flushing pump, demineralized water, through upper hose, electrically operated valve, rubber hose, flusher, carries out high pressure washing to air cooling tube bank surface, reaches the effect of scale removal dust removal.Due to large-area flushing work, Air-Cooling Island cooling surface temperature is sharply reduced simultaneously, play dust removal and the two-in-one effect of cooling, thoroughly solve the difficult problem that current air cooled generator group runs on the one hand at this.
Utility model content
The purpose of this utility model is to address the above problem, a kind of Air-Cooling Island auto-flushing and spike cooling system are provided, this system mainly solves the impact that current air cooling island of air cooling unit fin is subject to external environment, cause the fin dirty fouling in surface, radiating effect variation, and then cause the problem of thermal power generation unit generating capacity and economic benefit variation.When flushing device puts into operation, due to the reasonable distribution of the utility model to washing water quantity, can play the effect that effect is put forward in cooling simultaneously.
In order to realize the problems referred to above, the technical scheme that the utility model adopts is: comprise the upper rail and the lower guideway that are arranged on respectively Air-Cooling Island cooling unit above and below, power plant, upper rail and lower guideway are positioned at the side of Air-Cooling Island cooling unit, and the flusher for rinsing and lower the temperature to Air-Cooling Island cooling unit water spray is installed between upper rail and lower guideway, and the water inlet end of flusher is connected with high-pressure water pipe by high-pressure water valve; Driving mechanism for driving flusher to move along upper rail and lower guideway is installed on flusher; Driving mechanism is connected with three phase mains by two A.C. contactors in parallel.
Described flusher comprises the flushing support being installed between upper rail and lower guideway, the top and bottom of rinsing support are installed on upper rail and lower guideway by guide wheel respectively, are provided with some for the shower nozzles to Air-Cooling Island cooling unit water spray on flushing support; The output of driving mechanism is connected with the lower end of rinsing support, rinses support and along upper rail and lower guideway, moves under the driving of driving mechanism.
The hollow structure pipe bar that described flushing support is lower ending opening, shower nozzle is connected with the cavity that rinses internal stent, rinses support bottom and is sealedly connected with hose, and hose is connected with high-pressure water pipe by high-pressure water valve.
Described driving mechanism comprises alternating current generator, and the AC electrical reductor that is arranged on alternating current generator output, moves for dragging flushing support; On alternating current generator, be also provided with the frequency converter for speed regulating control alternating current generator; Alternating current generator is connected with three phase mains with the second contactor by the first contactor in parallel.
The two ends, left and right of described lower guideway are separately installed with left limit switch and right limit switch; Left limit switch is connected with the second contactor with the first contactor respectively with right limit switch, for when flushing support moves to the position of left limit switch or right limit switch, disconnects the power supply of alternating current generator, and alternating current generator is stopped.
Described left limit switch and right limit switch are two and drive two limit switches that close.
On the first described contactor and the second contactor, be respectively arranged with for starting alternating current generator, drive and rinse left start button and the right start button that support moves to the left or to the right.
Between described three phase mains and the first contactor and the second contactor, be provided with for each contact of control circuit dead electricity, the first contactor and the second contactor being resetted and making the danger button of alternating current generator dead electricity stall.
Between described three phase mains and the first contactor and the second contactor, and between the first contactor and the second contactor and alternating current generator, be provided with switch and for the protection of the motor power insurance of circuit with control power safety.
Compared with prior art, the utlity model has following beneficial effect:
The utility model can make Air-Cooling Island fin surface clean on the one hand, heat-transfer effect improves, heat-exchange capacity increases substantially, simultaneously owing to can playing cooling effect, make the vacuum index of air cooled generator group under summer hot environment improve 3-5Kpa, generating set generating capacity in the situation that other operating modes are constant increases by 3%, unit Reducing Coal Consumption 5-8g/Kwh.For separate unit 300,000 thermal power generation units, by annual this technology, put into operation and calculate for 2880 hours, can save coal-fired expense more than 2,160,000 yuan, can reach 2,592 ten thousand Kwh by multiple electric weight, effectiveness of operation increases by 829.44 ten thousand yuan, and energy-saving effect can be good.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is circuit theory diagrams of the present utility model.
Wherein, 1 is upper rail; 2 is lower guideway; 3 for rinsing support; 4 is shower nozzle; 5 is high-pressure water pipe; 6 is high-pressure water valve; 7 is hose.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in more detail:
Referring to Fig. 1, the utility model comprises upper rail 1 and the lower guideway 2 that is arranged on respectively Air-Cooling Island cooling unit above and below, power plant, upper rail 1 and lower guideway 2 are positioned at the side of Air-Cooling Island cooling unit, and the flusher for rinsing and lower the temperature to Air-Cooling Island cooling unit water spray is installed between upper rail 1 and lower guideway 2, and the water inlet end of flusher is connected with high-pressure water pipe 5 by high-pressure water valve 6; Driving mechanism for driving flusher to move along upper rail 1 and lower guideway 2 is installed on flusher; Driving mechanism is connected with three phase mains by two A.C. contactors in parallel.
Flusher comprises the flushing support 3 being installed between upper rail 1 and lower guideway 2, the top and bottom of rinsing support 3 are installed on upper rail 1 and lower guideway 2 by guide wheel respectively, are provided with some for the shower nozzles 4 to Air-Cooling Island cooling unit water spray on flushing support 3; The output of driving mechanism is connected with the lower end of rinsing support 3, rinses support 3 and along upper rail 1 and lower guideway 2, moves under the driving of driving mechanism.The hollow structure pipe bar that flushing support 3 is lower ending opening, shower nozzle 4 is connected with the cavity that rinses support 3 inside, rinses support 3 bottom end seal and is connected with hose 7, and hose 7 is connected with high-pressure water pipe 5 by high-pressure water valve 6.
As shown in Figure 2, driving mechanism comprises alternating current generator M, and the AC electrical reductor that is arranged on alternating current generator M output, moves for dragging flushing support 3; On alternating current generator M, be also provided with the frequency converter for speed regulating control alternating current generator M; Alternating current generator M is connected with three phase mains with the second contactor KM2 by the first contactor KM1 in parallel.The two ends, left and right of lower guideway 2 are separately installed with left limit switch XC1 and right limit switch XC2; Left limit switch XC1 is connected with the second contactor KM2 with the first contactor KM1 respectively with right limit switch XC2, for when flushing support 3 moves to the position of left limit switch XC1 or right limit switch XC2, the power supply that disconnects alternating current generator M, stops alternating current generator M.Left limit switch XC2 and right limit switch XC1 are two and drive two limit switches that close.On the first contactor KM1 and the second contactor KM2, be respectively arranged with for starting alternating current generator M, drive and rinse left start button SB1 and the right start button SB2 that support 3 moves to the left or to the right.Between three phase mains and the first contactor KM1 and the second contactor KM2, be provided with for each contact of control circuit dead electricity, the first contactor KM1 and the second contactor KM2 being resetted and making the danger button SB3 of alternating current generator M dead electricity stall.Between three phase mains and the first contactor KM1 and the second contactor KM2, and between the first contactor KM1 and the second contactor KM2 and alternating current generator M, be provided with switch FR and for the protection of the motor power insurance FU1 of circuit with control power safety FU2.
Principle of the present utility model and the course of work:
The utility model is taken into account and is solved summer environment sweltering heat, generating set vacuum significantly reduces, cause the not upper load of generating set band, can not meet the practical problem of electrical network actual demand, when rinse-system carries out, play the surface temperature of cooling Air-Cooling Island fin, can play the effect that improves generating set vacuum, meet generating set generating at full capacity under the environment of sweltering heat in summer, meet the demand of electrical network, mentality of designing is novel.
Referring to Fig. 1, the utility model is respectively installed a set of automatic flushing apparatus to the one side of each heat-sink unit of Air-Cooling Island, and this installs parallel, employing gear reduction unit drives, one side left and right is rinsed back and forth, and single programming washing time is 10 minutes, also can adjust the time according to actual conditions in addition; After operation remote operation cleaning procedure, two unit one sides rinse and carry out simultaneously, after this program executes, automatically switch to lower two unit one sides and rinse beginning simultaneously, meanwhile, also can adjust according to actual needs flushing element number.Also can adjust cleaning procedure according to equipment situation.The complete time of the whole cleaning procedures of single unit according to demand the number of devices of side specifically do not rinse design 160-240 minute not etc.System is by upper and lower guide rail and rinse support, mechanical transfer (comprising reductor etc.) forms.Upper and lower guide rail level is arranged on the above and below of each cooling unit, rinsing support is placed on upper and lower guide rail, by an AC electrical reductor machine, dragged, can according to the speed left and right horizontal of setting, move along upper and lower guide rail, motor carries out speed regulating control by frequency converter;
On flushing support, be evenly distributed 45-60 shower nozzle, when high-pressure water valve is opened, one or two unit rinse one by one in order by the program of setting, and shower nozzle is sprayed water simultaneously, realizes the flushing of cooling unit and cooling; Water under high pressure from high-pressure hydraulic pump is connected to the lower end of flusher through high-pressure water valve, hose;
At the left and right two ends of each unit lower guideway mounting limit switch, for limiting the left and right moving range of flusher, to control loop, send instruction simultaneously.
Air-Cooling Island auto-flushing, cooling system enter PLC and control, and can realize Long-distance Control, operation.In centralized control room, should be able to realize the automatic starting and stopping work of Air-Cooling Island self-stripping system, system runtime system fault-signal and running status should feed back to central control room in time.System is simple to operate, fault immediate feedback.System possesses two kinds of operational modes: fully automatic mode and manual mode, and system is when fully automatic mode, and flushing device moves left and right flusher automatically, automatically switches to next program flushing and carry out after a local cleaning procedure finishes.This auto-flushing program all adopts DCS interface, a distant place automatically to control.This design has been improved numerous disadvantages of current domestic flusher service condition, equipment is reliable, we have taken into account Air-cooled Unit spike in summer cooling effect simultaneously, can guarantee generating set energy normal full load operation under hot environment in summer, and input cost is lower.
The utility model can move left and right horizontal according to actual needs the cooling that is designed to move up and down along heat-sink unit and rinse forms of motion.
Referring to Fig. 2, control circuit figure of the present utility model:
The utility model adopt L1 L2 L3 three phase mains, and be connected to power switch QS, from L1 coupling, connect control power supply, by controlling power safety FU2 and controlling power switch FR, be connected with the second contactor KM2 with the first contactor KM1.After the flushing support 3 of take below moves right, to left movement, be example again, the course of work of the present utility model of explaining:
1) start to the right:
First by bottom left start button SB1, left start button SB1 normally closed interlock first disconnects, the interlocking of realization to the second contactor KM2, simultaneously left start button SB1 normally open contact is closed, thus the first contactor KM1 coil obtains electric, and then make the auxiliary contact of the first contactor KM1 closed, realize self-sustaining, in addition, the main contact of the first contactor KM1 is closed, the locking contact of the first contactor KM1 disconnects, and realizes the interlocking to the second contactor KM2; After the auxiliary contact closure and main contact closure of the first contactor KM1, alternating current generator M starts, and works to the right continuously; When rinsing support 3, move right after right limit switch XC2, right limit switch XC2 disconnects, alternating current generator M stall.
2) start left:
First by bottom right start button SB2, right start button SB2 normally closed interlock first disconnects, the interlocking of realization to the first contactor KM1, simultaneously right start button SB2 normally open contact is closed, thus the second contactor KM2 coil obtains electric, and then make the auxiliary contact of the second contactor KM2 closed, realize self-sustaining, in addition, the main contact of the second contactor KM2 is closed, the locking contact of the second contactor KM2 disconnects, and realizes the interlocking to the first contactor KM1; After the auxiliary contact closure and main contact closure of the second contactor KM2, alternating current generator M starts, and works left continuously; When rinsing support 3, move to left after left limit switch XC1, left limit switch XC1 disconnects, alternating current generator M stall;
3) emergent stopping is controlled:
When running into emergency and need to stop immediately, press danger button SB3, whole control circuit dead electricity, each contact of contactor resets, the stall of alternating current generator M dead electricity;
4) it should be noted that:
4-1) main circuit must commutation (be that V is mutually constant, U phase is exchanged mutually with W), could realize control;
4-2) during wiring, contactor self-locking contact can not be exchanged, otherwise can only crawl;
4-3) control coil of contactor is 380V;
4-4) power switch FR should select 380V switch.
5) if realize left and right Automatic continuous and swing, can by left limit switch XC1 often open node and right start button SB2 is in parallel, by right limit switch XC2 often open node and left start button SB1 is in parallel.
6) if realize in dcs DCS, local control box need not become, only the control instruction of dcs DCS need be controlled to auxiliary reclay, by auxiliary reclay often open node and left start button SB1 right start button SB2 in parallel.
If realized with dcs DCS, case can adopt rotating control module (rotating that can realize the following motor of 7.5KW is controlled) on the spot, the direct Access Control module of dcs DCS instruction realizes above-mentioned functions (without auxiliary reclay), and dcs DCS directly exports 24V control instruction and directly drives rotating control module.
Above content is only explanation technological thought of the present utility model; can not limit protection domain of the present utility model with this; every technological thought according to the utility model proposes, any change of doing on technical scheme basis, within all falling into the protection domain of the utility model claims.

Claims (9)

1. an Air-Cooling Island auto-flushing and spike cooling system, it is characterized in that: comprise the upper rail (1) and the lower guideway (2) that are arranged on respectively Air-Cooling Island cooling unit above and below, power plant, upper rail (1) and lower guideway (2) are positioned at the side of Air-Cooling Island cooling unit, and the flusher for rinsing and lower the temperature to Air-Cooling Island cooling unit water spray is installed between upper rail (1) and lower guideway (2), and the water inlet end of flusher is connected with high-pressure water pipe (5) by high-pressure water valve (6); On flusher, install and be used for driving flusher along the driving mechanism of upper rail (1) and lower guideway (2) motion; Driving mechanism is connected with three phase mains by two A.C. contactors in parallel.
2. Air-Cooling Island auto-flushing according to claim 1 and spike cooling system, it is characterized in that: described flusher comprises the flushing support (3) being installed between upper rail (1) and lower guideway (2), the top and bottom of flushing support (3) by guide wheel, are installed on upper rail (1) respectively and lower guideway (2) is upper, are provided with some for the shower nozzles (4) to Air-Cooling Island cooling unit water spray on flushing support (3); The output of driving mechanism is connected with the lower end of rinsing support (3), rinses support (3) and along upper rail (1) and lower guideway (2), moves under the driving of driving mechanism.
3. Air-Cooling Island auto-flushing according to claim 2 and spike cooling system, it is characterized in that: described flushing support (3) is the hollow structure pipe bar of lower ending opening, shower nozzle (4) cavity inner with rinsing support (3) is connected, rinse support (3) bottom end seal and be connected with hose (7), hose (7) is connected with high-pressure water pipe (5) by high-pressure water valve (6).
4. according to the Air-Cooling Island auto-flushing described in claim 2 or 3 and spike cooling system, it is characterized in that: described driving mechanism comprises alternating current generator (M), and the AC electrical reductor that is arranged on alternating current generator (M) output, moves for dragging flushing support (3); On alternating current generator (M), be also provided with the frequency converter for speed regulating control alternating current generator (M); Alternating current generator (M) is connected with three phase mains with the second contactor (KM2) by the first contactor (KM1) in parallel.
5. Air-Cooling Island auto-flushing according to claim 4 and spike cooling system, is characterized in that: the two ends, left and right of described lower guideway (2) are separately installed with left limit switch (XC1) and right limit switch (XC2); Left limit switch (XC1) is connected with the second contactor (KM2) with the first contactor (KM1) respectively with right limit switch (XC2), for when flushing support (3) moves to the position of left limit switch (XC1) or right limit switch (XC2), the power supply that disconnects alternating current generator (M), stops alternating current generator (M).
6. Air-Cooling Island auto-flushing according to claim 5 and spike cooling system, is characterized in that: described left limit switch (XC2) is two with right limit switch (XC1) and drives two limit switches that close.
7. Air-Cooling Island auto-flushing according to claim 4 and spike cooling system, it is characterized in that: on described the first contactor (KM1) and the second contactor (KM2), be respectively arranged with for starting alternating current generator (M), drive and rinse left start button (SB1) and the right start button (SB2) that support (3) moves to the left or to the right.
8. Air-Cooling Island auto-flushing according to claim 4 and spike cooling system, is characterized in that: between described three phase mains and the first contactor (KM1) and the second contactor (KM2), be provided with for each contact of control circuit dead electricity, the first contactor (KM1) and the second contactor (KM2) being resetted and making the danger button (SB3) of alternating current generator (M) dead electricity stall.
9. Air-Cooling Island auto-flushing according to claim 4 and spike cooling system; it is characterized in that: between described three phase mains and the first contactor (KM1) and the second contactor (KM2), and between the first contactor (KM1) and the second contactor (KM2) and alternating current generator (M), be provided with switch (FR) and for the protection of motor power insurance (FU1) and the control power safety (FU2) of circuit.
CN201420450234.1U 2014-08-11 2014-08-11 A kind of Air-Cooling Island auto-flushing and spike cooling system Active CN204027420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420450234.1U CN204027420U (en) 2014-08-11 2014-08-11 A kind of Air-Cooling Island auto-flushing and spike cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420450234.1U CN204027420U (en) 2014-08-11 2014-08-11 A kind of Air-Cooling Island auto-flushing and spike cooling system

Publications (1)

Publication Number Publication Date
CN204027420U true CN204027420U (en) 2014-12-17

Family

ID=52067265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420450234.1U Active CN204027420U (en) 2014-08-11 2014-08-11 A kind of Air-Cooling Island auto-flushing and spike cooling system

Country Status (1)

Country Link
CN (1) CN204027420U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887399A (en) * 2019-10-22 2020-03-17 北京汇研中科科技发展有限公司 Air island of power plant is with high-efficient water-saving cleaning system of full intelligence
CN115533921A (en) * 2022-11-28 2022-12-30 北京汇研中科科技发展有限公司 Synchronous operation control system and method based on power plant energy-saving and efficiency-increasing robot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887399A (en) * 2019-10-22 2020-03-17 北京汇研中科科技发展有限公司 Air island of power plant is with high-efficient water-saving cleaning system of full intelligence
CN115533921A (en) * 2022-11-28 2022-12-30 北京汇研中科科技发展有限公司 Synchronous operation control system and method based on power plant energy-saving and efficiency-increasing robot

Similar Documents

Publication Publication Date Title
CN102983593B (en) Seamless handover control method for microgrid based on intelligent switch
CN106272927B (en) Concrete prefabricated beam automatic spray health-preservation device
CN202129234U (en) Full-automatic filter core cleaning machine
CN102495608B (en) DCS (Distributed Control System) based integrated-control system of coal-fired power plant
CN201335489Y (en) Energy-saving management device for central air conditioner
CN204027420U (en) A kind of Air-Cooling Island auto-flushing and spike cooling system
CN106159942A (en) MMC UPFC system and series side inverter stoppage in transit method thereof
CN205155927U (en) A feedwater governing system for angering power boiler
CN201503063U (en) Full-automatic unattended heat exchanger unit
CN203896280U (en) Automatically-controlled evaporation cooling and cleaning device for photovoltaic plate
CN207288118U (en) A kind of photovoltaic panel cleaning equipment
CN211209649U (en) Wisdom photovoltaic power generation device
CN205532994U (en) Running water power station
CN109980564A (en) A kind of box-type substation with defencive function
CN203770140U (en) Air compressor waste heat recycling system
CN203908397U (en) Automatic cleaning and spraying system for air cooling island
CN202014222U (en) Energy-saving frequency conversion compensation control cabinet
CN203518804U (en) Automatic washing cooling machine for heat sinks of transformers
CN113346544A (en) Photovoltaic energy storage device that draws water
CN203012459U (en) Wastewater treatment process monitoring system based on the energy-saving design
CN202413732U (en) Control circuit of tunnel type car washer
CN202503291U (en) Intelligent automatic voltage control system
CN202570681U (en) High-efficiency energy-saving circuit board cleaning device
CN203518198U (en) Auxiliary heating device
CN108873962A (en) For controlling the power-economizing method of GTCC power plant Main Transformer Cooler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant