CN204025925U - A kind of novel dual card cuff structure - Google Patents

A kind of novel dual card cuff structure Download PDF

Info

Publication number
CN204025925U
CN204025925U CN201420463695.2U CN201420463695U CN204025925U CN 204025925 U CN204025925 U CN 204025925U CN 201420463695 U CN201420463695 U CN 201420463695U CN 204025925 U CN204025925 U CN 204025925U
Authority
CN
China
Prior art keywords
clip
construction bolt
duplex
circular arc
dual card
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420463695.2U
Other languages
Chinese (zh)
Inventor
李健
田静
吕春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AECC Shenyang Engine Research Institute
AVIC Shenyang Engine Design and Research Institute
Original Assignee
AVIC Shenyang Engine Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC Shenyang Engine Design and Research Institute filed Critical AVIC Shenyang Engine Design and Research Institute
Priority to CN201420463695.2U priority Critical patent/CN204025925U/en
Application granted granted Critical
Publication of CN204025925U publication Critical patent/CN204025925U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

A kind of novel dual card cuff structure, installation for structural members such as pipelines is fixed, it is characterized in that, first clip is by the biased supporting leg of second clip, the installment state of duplex clip side is slided to along lengthening semitubular rivet, first clip rotates around semitubular rivet, first construction bolt is opened circular arc through the side of first clip and to be slitted hole, side through first clip is opened circular arc and to be slitted hole, eventually pass through the mounting hole of second clip, pipeline being fixed on cover has first clip of upper rubber cushion and cover to have between second clip of lower rubber cushion, first clip process is identical, duplex clip is connected on fitting seat simultaneously, construction bolt is tightened, at first clip and first clip lower than the assembly process completing duplex clip fixed tube road during limit rib.This programme construction bolt only need partly be back-outed, and the integration that can complete second clip is biased decomposes, rapid and convenient; After decomposing, construction bolt will be fixed on fitting seat by integrated clip, without scattered, improves assembling and maintainability.

Description

A kind of novel dual card cuff structure
Technical field
The utility model relates to aeroengine field, provides a kind of novel dual card cuff structure, and the installation that this structure is used for the structural members such as pipeline is fixed.
Background technique
Aeroengine uses yoke configurations to carry out installation to pipeline and fixes, this structure need meet the installation requirement such as fixing, damping, frequency modulation of pipeline, simultaneously the reliability of clip will directly affect the work that can pipeline safe and reliable, and motor often uses a large amount of clip to fix pipeline, need consider that the impact on assembling is decomposed in clip assembling.
Conventional construction, as shown in Fig. 1-1, Fig. 1-2, duplex clip uses bolt to be connected by second clip upper, and there is metal felt damping anti-abration structure in clip and pipeline contact face, the installation being completed pipeline by the realization compression pipeline that tights a bolt is fixed, and adopts locking plate to prevent bolt from getting loose.This structure is because bolt is through the mounting hole of second complete closed pattern upper, all need bolt to be screwed into completely or to back-out to decompose the mounting or dismounting that second clip completes pipeline in assembling Sum decomposition process, simultaneously due to separated state after second clip upper before assembly Sum decomposition, cause clip more than scattered, easy loss is not easy to management, this kind of structure dismounting is wasted time and energy, and can not meet the requirement of motor to assembling, maintainability.
For this reason, need the novel dual card cuff structure of a kind of model utility of model utility, realizing being convenient to assemble Sum decomposition, to improve assembling and maintainability while pipeline installs fixed function.
Model utility content
The purpose of this utility model is to provide a kind of novel dual card cuff structure, has mounting or dismounting convenient, and integration without scattered, and can provide the installation of high efficient and reliable to fix for pipeline.
The technical solution of the utility model is: provide a kind of novel dual card cuff structure, it is characterized in that, comprise second clip 1, first clip 2 and construction bolt 3, first clip 2 is by the biased supporting leg 7 of second clip 1, the installment state of duplex clip side is slided to along lengthening semitubular rivet 9, first clip 2 rotates around semitubular rivet 9, this process of first clip 4 is identical, first construction bolt 3 is opened circular arc through the side of first clip 4 and to be slitted hole 11, open circular arc through the side of first clip 2 again to slit hole 11, eventually pass through the mounting hole of second clip 1, pipeline 13 being fixed on cover has first clip 2 of upper rubber cushion 6 and cover to have between second clip 1 of lower rubber cushion 12, this process of first clip 4 is identical, duplex clip is connected on fitting seat 14 simultaneously, construction bolt 3 is tightened, at first clip 2 and first clip 4 lower than the assembly process completing duplex clip fixed tube road during limit rib 8.
Decomposition process: construction bolt 3 need partly be back-outed, make first clip 4 higher than limit rib 8, depart from the constraint of limit rib 8, first clip 4 departs from the restriction of construction bolt 3 by other circular arc hole 11 of slitting of opening, the decomposing state of duplex clip opposite side is slided to along lengthening semitubular rivet 9, first clip 4 has been rotated decomposition around lengthening semitubular rivet 9, and first this decomposition process of clip 2 is identical.
Wherein biased supporting leg 7 is that the mounting hole one on second clip 1 being lengthened semitubular rivet 9 is biased, and this is biased when need ensure that first clip 2 and first clip 4 slide into decomposing state, first clip 2 and first clip 4 can be made to break away from the constraint of construction bolt 3 by other circular arc hole 11 of slitting of opening.
Wherein other to open circular arc hole 1 of slitting be by completely unlimited for the bolt mounting holes side of first clip 2 and first clip 4, for the biased decomposition of first clip 2 and first clip 4.
Wherein limit rib 8 is convexes that side is arranged on second clip 1, for limiting the installment state of first clip 2 and first clip 4.
Advantage of the present utility model: second clip integral hinges structure upper; Construction bolt only need partly be back-outed, and the integration that can complete second clip is biased decomposes, rapid and convenient; And after decomposing, construction bolt will be fixed on fitting seat by integrated clip, without scattered, improves assembling and maintainability.
Accompanying drawing explanation
Fig. 1-1: traditional novel dual card cuff structure installment state schematic diagram
Fig. 1-2: traditional novel dual card cuff structure decomposing state schematic diagram
Fig. 2-1: novel dual card cuff structure left view
Fig. 2-2: novel dual card cuff structure right elevation
Fig. 2-3: novel dual card cuff structure plan view
Fig. 3-1: integrated Quick assembling-disassembling structure installment state schematic diagram
Fig. 3-2: integrated Quick assembling-disassembling structure decomposing state schematic diagram
Embodiment
A kind of novel dual card cuff structure, comprises assembly structure, decomposition texture, is specially:
Assembly structure: first clip 2 is by the biased supporting leg 7 of second clip 1, the installment state of duplex clip side is slided to along lengthening semitubular rivet 9, first clip 2 rotates around semitubular rivet 9, this process of first clip 4 is identical, first construction bolt 3 is opened circular arc through the side of first clip 4 and to be slitted hole 11, open circular arc through the side of first clip 2 again to slit hole 11, eventually pass through the mounting hole of second clip 1, pipeline 13 being fixed on cover has first clip 2 of upper rubber cushion 6 and cover to have between second clip 1 of lower rubber cushion 12, this process of first clip 4 is identical, duplex clip is connected on fitting seat 14 simultaneously, construction bolt 3 is tightened, at first clip 2 and first clip 4 lower than the assembly process completing duplex clip fixed tube road during limit rib 8.
Decomposition texture: construction bolt 3 need partly be back-outed, make first clip 4 higher than limit rib 8, depart from the constraint of limit rib 8, first clip 4 departs from the restriction of construction bolt 3 by other circular arc hole 11 of slitting of opening, the decomposing state of duplex clip opposite side is slided to along lengthening semitubular rivet 9, first clip 4 has been rotated decomposition around lengthening semitubular rivet 9, and first this decomposition process of clip 2 is identical.
Be characterized in that construction bolt 3 need partly be back-outed and can realize the decomposition of duplex clip.
Be characterized in biased to decompose: construction bolt 3 part is back-outed, make first clip 2 and first clip 4 open circular arc hole 11 of slitting by side and slide to duplex clip side along lengthening semitubular rivet 9 and complete decomposition.
Be characterized in that the integration of duplex clip is without scattered: during decomposition, construction bolt 3 part has been back-outed decomposition, will be fixed on fitting seat 14 by second clip 1, after decomposing, second clip 1 and first clip 2, second clip 1 and first clip 4 are by lengthening semitubular rivet 9 chain connection simultaneously, connected as one with first clip 2, first clip 4 by second clip 1, after duplex clip is decomposed, integration is without scattered.

Claims (4)

1. a novel dual card cuff structure, it is characterized in that, comprise second clip (1), first clip (2) and construction bolt (3), assembly structure: first clip (2) is by the biased supporting leg (7) of second clip (1), the installment state of duplex clip side is slided to along lengthening semitubular rivet (9), first clip (2) rotates around semitubular rivet (9), this process of first clip (4) is identical, construction bolt (3) is first opened circular arc through the side of first clip (4) and to be slitted hole (11), open circular arc through the side of first clip (2) again to slit hole (11), eventually pass through the mounting hole of second clip (1), pipeline (13) being fixed on cover has first clip (2) of upper rubber cushion (6) and cover to have between second clip (1) of lower rubber cushion (12), this process of first clip (4) is identical, duplex clip is connected on fitting seat (14) simultaneously, construction bolt (3) is tightened, at first clip (2) and first clip (4) lower than the assembly process completing duplex clip fixed tube road time limit rib (8).
2. novel dual card cuff structure according to claim 1, it is characterized in that, described second clip (1) is provided with biased supporting leg (5), makes first clip (2) can slide into side along lengthening semitubular rivet (9) and completes decomposition.
3. novel dual card cuff structure according to claim 1, it is characterized in that, described second clip (1) is provided with limit rib (8) structure, for completing the limit mounting of first clip (2) and first clip (4).
4. novel dual card cuff structure according to claim 1, it is characterized in that, described first clip (2) and first clip (4) are provided with side and open circular arc and to slit hole (11), and the assembling Sum decomposition of first clip (2) and first clip (4) is opened circular arc hole (11) of slitting by side and completed.
CN201420463695.2U 2014-08-15 2014-08-15 A kind of novel dual card cuff structure Expired - Fee Related CN204025925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420463695.2U CN204025925U (en) 2014-08-15 2014-08-15 A kind of novel dual card cuff structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420463695.2U CN204025925U (en) 2014-08-15 2014-08-15 A kind of novel dual card cuff structure

Publications (1)

Publication Number Publication Date
CN204025925U true CN204025925U (en) 2014-12-17

Family

ID=52065789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420463695.2U Expired - Fee Related CN204025925U (en) 2014-08-15 2014-08-15 A kind of novel dual card cuff structure

Country Status (1)

Country Link
CN (1) CN204025925U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107512233A (en) * 2017-10-25 2017-12-26 江阴市蒋氏汽摩部件有限公司 A kind of wire clamp for fixed car wire harness
CN110165610A (en) * 2018-02-11 2019-08-23 中国航发商用航空发动机有限责任公司 A kind of the cable yoke configurations and its mounting structure of adjustable diameter
CN112525461A (en) * 2020-07-06 2021-03-19 东北大学 Vibration test bed of multiform clamp pipe test system and frequency response test method thereof
CN113983238A (en) * 2021-10-29 2022-01-28 沪东中华造船(集团)有限公司 Corrugated pipe installation adjusting device on ship and using method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107512233A (en) * 2017-10-25 2017-12-26 江阴市蒋氏汽摩部件有限公司 A kind of wire clamp for fixed car wire harness
CN107512233B (en) * 2017-10-25 2019-05-17 江阴市蒋氏汽摩部件有限公司 A kind of wire clamp for fixed car harness
CN110165610A (en) * 2018-02-11 2019-08-23 中国航发商用航空发动机有限责任公司 A kind of the cable yoke configurations and its mounting structure of adjustable diameter
CN112525461A (en) * 2020-07-06 2021-03-19 东北大学 Vibration test bed of multiform clamp pipe test system and frequency response test method thereof
CN113983238A (en) * 2021-10-29 2022-01-28 沪东中华造船(集团)有限公司 Corrugated pipe installation adjusting device on ship and using method thereof

Similar Documents

Publication Publication Date Title
CN204025925U (en) A kind of novel dual card cuff structure
CN205190969U (en) Hinge is from lock pipe strap
CN204942767U (en) A kind of dual card cuff structure
CN204025918U (en) A kind of novel simply connected yoke configurations
CN204312867U (en) A kind of simply connected yoke configurations
CN204949794U (en) Connection structure of watchband and dial plate
CN204025919U (en) A kind of simply connected yoke configurations
CN204025926U (en) A kind of dual card cuff structure
CN207338971U (en) A kind of installation auxiliary device of switchgear
CN204628821U (en) A kind of novel non-dual card cuff structure of taking root
CN204325680U (en) The portable plate lock-bit structure of Computerized flat knitting machine
CN103762933B (en) A kind of solar energy power generating mounting structure
CN205605979U (en) Structure convenient to pipeline is changed
CN205029014U (en) Antenna shell with lock joint spare
CN105089390B (en) Novel bolt
CN204236274U (en) A kind of back of seat mounting bracket with rotating mechanism
CN204145482U (en) The safe intercom of a kind of new structure
CN202251275U (en) Interlocking connecting structure of sheet metal part
CN103510772A (en) Novel plug pin structure
CN202721353U (en) Back upper sealing plate structure with electric lock and matched with metal armored switch cabinet
CN103422751A (en) Automobile door hinge with elliptical installation screw holes
CN205179568U (en) Fasten isolated plant fast temporarily
CN207327981U (en) Wheels of mobile robot
CN204311887U (en) A kind of latch
CN203214525U (en) Improved structure of fasteners of refrigerator components

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20160815

CF01 Termination of patent right due to non-payment of annual fee