CN204025925U - A kind of novel dual card cuff structure - Google Patents
A kind of novel dual card cuff structure Download PDFInfo
- Publication number
- CN204025925U CN204025925U CN201420463695.2U CN201420463695U CN204025925U CN 204025925 U CN204025925 U CN 204025925U CN 201420463695 U CN201420463695 U CN 201420463695U CN 204025925 U CN204025925 U CN 204025925U
- Authority
- CN
- China
- Prior art keywords
- clip
- construction bolt
- duplex
- circular arc
- dual card
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
A kind of novel dual card cuff structure, installation for structural members such as pipelines is fixed, it is characterized in that, first clip is by the biased supporting leg of second clip, the installment state of duplex clip side is slided to along lengthening semitubular rivet, first clip rotates around semitubular rivet, first construction bolt is opened circular arc through the side of first clip and to be slitted hole, side through first clip is opened circular arc and to be slitted hole, eventually pass through the mounting hole of second clip, pipeline being fixed on cover has first clip of upper rubber cushion and cover to have between second clip of lower rubber cushion, first clip process is identical, duplex clip is connected on fitting seat simultaneously, construction bolt is tightened, at first clip and first clip lower than the assembly process completing duplex clip fixed tube road during limit rib.This programme construction bolt only need partly be back-outed, and the integration that can complete second clip is biased decomposes, rapid and convenient; After decomposing, construction bolt will be fixed on fitting seat by integrated clip, without scattered, improves assembling and maintainability.
Description
Technical field
The utility model relates to aeroengine field, provides a kind of novel dual card cuff structure, and the installation that this structure is used for the structural members such as pipeline is fixed.
Background technique
Aeroengine uses yoke configurations to carry out installation to pipeline and fixes, this structure need meet the installation requirement such as fixing, damping, frequency modulation of pipeline, simultaneously the reliability of clip will directly affect the work that can pipeline safe and reliable, and motor often uses a large amount of clip to fix pipeline, need consider that the impact on assembling is decomposed in clip assembling.
Conventional construction, as shown in Fig. 1-1, Fig. 1-2, duplex clip uses bolt to be connected by second clip upper, and there is metal felt damping anti-abration structure in clip and pipeline contact face, the installation being completed pipeline by the realization compression pipeline that tights a bolt is fixed, and adopts locking plate to prevent bolt from getting loose.This structure is because bolt is through the mounting hole of second complete closed pattern upper, all need bolt to be screwed into completely or to back-out to decompose the mounting or dismounting that second clip completes pipeline in assembling Sum decomposition process, simultaneously due to separated state after second clip upper before assembly Sum decomposition, cause clip more than scattered, easy loss is not easy to management, this kind of structure dismounting is wasted time and energy, and can not meet the requirement of motor to assembling, maintainability.
For this reason, need the novel dual card cuff structure of a kind of model utility of model utility, realizing being convenient to assemble Sum decomposition, to improve assembling and maintainability while pipeline installs fixed function.
Model utility content
The purpose of this utility model is to provide a kind of novel dual card cuff structure, has mounting or dismounting convenient, and integration without scattered, and can provide the installation of high efficient and reliable to fix for pipeline.
The technical solution of the utility model is: provide a kind of novel dual card cuff structure, it is characterized in that, comprise second clip 1, first clip 2 and construction bolt 3, first clip 2 is by the biased supporting leg 7 of second clip 1, the installment state of duplex clip side is slided to along lengthening semitubular rivet 9, first clip 2 rotates around semitubular rivet 9, this process of first clip 4 is identical, first construction bolt 3 is opened circular arc through the side of first clip 4 and to be slitted hole 11, open circular arc through the side of first clip 2 again to slit hole 11, eventually pass through the mounting hole of second clip 1, pipeline 13 being fixed on cover has first clip 2 of upper rubber cushion 6 and cover to have between second clip 1 of lower rubber cushion 12, this process of first clip 4 is identical, duplex clip is connected on fitting seat 14 simultaneously, construction bolt 3 is tightened, at first clip 2 and first clip 4 lower than the assembly process completing duplex clip fixed tube road during limit rib 8.
Decomposition process: construction bolt 3 need partly be back-outed, make first clip 4 higher than limit rib 8, depart from the constraint of limit rib 8, first clip 4 departs from the restriction of construction bolt 3 by other circular arc hole 11 of slitting of opening, the decomposing state of duplex clip opposite side is slided to along lengthening semitubular rivet 9, first clip 4 has been rotated decomposition around lengthening semitubular rivet 9, and first this decomposition process of clip 2 is identical.
Wherein biased supporting leg 7 is that the mounting hole one on second clip 1 being lengthened semitubular rivet 9 is biased, and this is biased when need ensure that first clip 2 and first clip 4 slide into decomposing state, first clip 2 and first clip 4 can be made to break away from the constraint of construction bolt 3 by other circular arc hole 11 of slitting of opening.
Wherein other to open circular arc hole 1 of slitting be by completely unlimited for the bolt mounting holes side of first clip 2 and first clip 4, for the biased decomposition of first clip 2 and first clip 4.
Wherein limit rib 8 is convexes that side is arranged on second clip 1, for limiting the installment state of first clip 2 and first clip 4.
Advantage of the present utility model: second clip integral hinges structure upper; Construction bolt only need partly be back-outed, and the integration that can complete second clip is biased decomposes, rapid and convenient; And after decomposing, construction bolt will be fixed on fitting seat by integrated clip, without scattered, improves assembling and maintainability.
Accompanying drawing explanation
Fig. 1-1: traditional novel dual card cuff structure installment state schematic diagram
Fig. 1-2: traditional novel dual card cuff structure decomposing state schematic diagram
Fig. 2-1: novel dual card cuff structure left view
Fig. 2-2: novel dual card cuff structure right elevation
Fig. 2-3: novel dual card cuff structure plan view
Fig. 3-1: integrated Quick assembling-disassembling structure installment state schematic diagram
Fig. 3-2: integrated Quick assembling-disassembling structure decomposing state schematic diagram
Embodiment
A kind of novel dual card cuff structure, comprises assembly structure, decomposition texture, is specially:
Assembly structure: first clip 2 is by the biased supporting leg 7 of second clip 1, the installment state of duplex clip side is slided to along lengthening semitubular rivet 9, first clip 2 rotates around semitubular rivet 9, this process of first clip 4 is identical, first construction bolt 3 is opened circular arc through the side of first clip 4 and to be slitted hole 11, open circular arc through the side of first clip 2 again to slit hole 11, eventually pass through the mounting hole of second clip 1, pipeline 13 being fixed on cover has first clip 2 of upper rubber cushion 6 and cover to have between second clip 1 of lower rubber cushion 12, this process of first clip 4 is identical, duplex clip is connected on fitting seat 14 simultaneously, construction bolt 3 is tightened, at first clip 2 and first clip 4 lower than the assembly process completing duplex clip fixed tube road during limit rib 8.
Decomposition texture: construction bolt 3 need partly be back-outed, make first clip 4 higher than limit rib 8, depart from the constraint of limit rib 8, first clip 4 departs from the restriction of construction bolt 3 by other circular arc hole 11 of slitting of opening, the decomposing state of duplex clip opposite side is slided to along lengthening semitubular rivet 9, first clip 4 has been rotated decomposition around lengthening semitubular rivet 9, and first this decomposition process of clip 2 is identical.
Be characterized in that construction bolt 3 need partly be back-outed and can realize the decomposition of duplex clip.
Be characterized in biased to decompose: construction bolt 3 part is back-outed, make first clip 2 and first clip 4 open circular arc hole 11 of slitting by side and slide to duplex clip side along lengthening semitubular rivet 9 and complete decomposition.
Be characterized in that the integration of duplex clip is without scattered: during decomposition, construction bolt 3 part has been back-outed decomposition, will be fixed on fitting seat 14 by second clip 1, after decomposing, second clip 1 and first clip 2, second clip 1 and first clip 4 are by lengthening semitubular rivet 9 chain connection simultaneously, connected as one with first clip 2, first clip 4 by second clip 1, after duplex clip is decomposed, integration is without scattered.
Claims (4)
1. a novel dual card cuff structure, it is characterized in that, comprise second clip (1), first clip (2) and construction bolt (3), assembly structure: first clip (2) is by the biased supporting leg (7) of second clip (1), the installment state of duplex clip side is slided to along lengthening semitubular rivet (9), first clip (2) rotates around semitubular rivet (9), this process of first clip (4) is identical, construction bolt (3) is first opened circular arc through the side of first clip (4) and to be slitted hole (11), open circular arc through the side of first clip (2) again to slit hole (11), eventually pass through the mounting hole of second clip (1), pipeline (13) being fixed on cover has first clip (2) of upper rubber cushion (6) and cover to have between second clip (1) of lower rubber cushion (12), this process of first clip (4) is identical, duplex clip is connected on fitting seat (14) simultaneously, construction bolt (3) is tightened, at first clip (2) and first clip (4) lower than the assembly process completing duplex clip fixed tube road time limit rib (8).
2. novel dual card cuff structure according to claim 1, it is characterized in that, described second clip (1) is provided with biased supporting leg (5), makes first clip (2) can slide into side along lengthening semitubular rivet (9) and completes decomposition.
3. novel dual card cuff structure according to claim 1, it is characterized in that, described second clip (1) is provided with limit rib (8) structure, for completing the limit mounting of first clip (2) and first clip (4).
4. novel dual card cuff structure according to claim 1, it is characterized in that, described first clip (2) and first clip (4) are provided with side and open circular arc and to slit hole (11), and the assembling Sum decomposition of first clip (2) and first clip (4) is opened circular arc hole (11) of slitting by side and completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420463695.2U CN204025925U (en) | 2014-08-15 | 2014-08-15 | A kind of novel dual card cuff structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420463695.2U CN204025925U (en) | 2014-08-15 | 2014-08-15 | A kind of novel dual card cuff structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204025925U true CN204025925U (en) | 2014-12-17 |
Family
ID=52065789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420463695.2U Expired - Fee Related CN204025925U (en) | 2014-08-15 | 2014-08-15 | A kind of novel dual card cuff structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204025925U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107512233A (en) * | 2017-10-25 | 2017-12-26 | 江阴市蒋氏汽摩部件有限公司 | A kind of wire clamp for fixed car wire harness |
CN110165610A (en) * | 2018-02-11 | 2019-08-23 | 中国航发商用航空发动机有限责任公司 | A kind of the cable yoke configurations and its mounting structure of adjustable diameter |
CN112525461A (en) * | 2020-07-06 | 2021-03-19 | 东北大学 | Vibration test bed of multiform clamp pipe test system and frequency response test method thereof |
CN113983238A (en) * | 2021-10-29 | 2022-01-28 | 沪东中华造船(集团)有限公司 | Corrugated pipe installation adjusting device on ship and using method thereof |
-
2014
- 2014-08-15 CN CN201420463695.2U patent/CN204025925U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107512233A (en) * | 2017-10-25 | 2017-12-26 | 江阴市蒋氏汽摩部件有限公司 | A kind of wire clamp for fixed car wire harness |
CN107512233B (en) * | 2017-10-25 | 2019-05-17 | 江阴市蒋氏汽摩部件有限公司 | A kind of wire clamp for fixed car harness |
CN110165610A (en) * | 2018-02-11 | 2019-08-23 | 中国航发商用航空发动机有限责任公司 | A kind of the cable yoke configurations and its mounting structure of adjustable diameter |
CN112525461A (en) * | 2020-07-06 | 2021-03-19 | 东北大学 | Vibration test bed of multiform clamp pipe test system and frequency response test method thereof |
CN113983238A (en) * | 2021-10-29 | 2022-01-28 | 沪东中华造船(集团)有限公司 | Corrugated pipe installation adjusting device on ship and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204025925U (en) | A kind of novel dual card cuff structure | |
CN205190969U (en) | Hinge is from lock pipe strap | |
CN204942767U (en) | A kind of dual card cuff structure | |
CN204025918U (en) | A kind of novel simply connected yoke configurations | |
CN204312867U (en) | A kind of simply connected yoke configurations | |
CN204949794U (en) | Connection structure of watchband and dial plate | |
CN204025919U (en) | A kind of simply connected yoke configurations | |
CN204025926U (en) | A kind of dual card cuff structure | |
CN207338971U (en) | A kind of installation auxiliary device of switchgear | |
CN204628821U (en) | A kind of novel non-dual card cuff structure of taking root | |
CN204325680U (en) | The portable plate lock-bit structure of Computerized flat knitting machine | |
CN103762933B (en) | A kind of solar energy power generating mounting structure | |
CN205605979U (en) | Structure convenient to pipeline is changed | |
CN205029014U (en) | Antenna shell with lock joint spare | |
CN105089390B (en) | Novel bolt | |
CN204236274U (en) | A kind of back of seat mounting bracket with rotating mechanism | |
CN204145482U (en) | The safe intercom of a kind of new structure | |
CN202251275U (en) | Interlocking connecting structure of sheet metal part | |
CN103510772A (en) | Novel plug pin structure | |
CN202721353U (en) | Back upper sealing plate structure with electric lock and matched with metal armored switch cabinet | |
CN103422751A (en) | Automobile door hinge with elliptical installation screw holes | |
CN205179568U (en) | Fasten isolated plant fast temporarily | |
CN207327981U (en) | Wheels of mobile robot | |
CN204311887U (en) | A kind of latch | |
CN203214525U (en) | Improved structure of fasteners of refrigerator components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141217 Termination date: 20160815 |
|
CF01 | Termination of patent right due to non-payment of annual fee |