CN205605979U - Structure convenient to pipeline is changed - Google Patents

Structure convenient to pipeline is changed Download PDF

Info

Publication number
CN205605979U
CN205605979U CN201620392854.3U CN201620392854U CN205605979U CN 205605979 U CN205605979 U CN 205605979U CN 201620392854 U CN201620392854 U CN 201620392854U CN 205605979 U CN205605979 U CN 205605979U
Authority
CN
China
Prior art keywords
clip
pipeline
chute
spout
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620392854.3U
Other languages
Chinese (zh)
Inventor
卢邦福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Lulin Building Material Factory
Original Assignee
Chongqing Lulin Building Material Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Lulin Building Material Factory filed Critical Chongqing Lulin Building Material Factory
Priority to CN201620392854.3U priority Critical patent/CN205605979U/en
Application granted granted Critical
Publication of CN205605979U publication Critical patent/CN205605979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

This patent belongs to the fastener field, specifically discloses structure convenient to pipeline is changed, and mainly used fixes the pipeline on the wall body, detains including fixed, and fixed centre of detaining is equipped with elastic bellying of arcuation, and fixed both sides of detaining are equipped with the through -hole, installation piece, the back of installation piece be equipped with with wall fixing's adhesive linkage, be equipped with the spout that runs through whole installation piece on the front of installation piece, sliding fit has two sliders in the spout, sets firmly spacing that prevents that slider and spout break away from on the spout, spacing notch department that is located the spout has all set firmly the screw rod on two sliders, pass the through -hole on two screw rods respectively, two screw rods threaded connection respectively have the nut, the nut is located the fixed outside of detaining. Aim at provides the structure convenient to pipeline is changed that can improve the installation effectiveness.

Description

It is easy to the structure of piping foundation
Technical field
This utility model relates to connector field, is specifically related to a kind of structure being easy to piping foundation.
Background technology
When pipeline is fixed on body of wall by needs, people generally use, and are drilled with blind hole on body of wall, counterbore is positioned at the both sides of pipeline, then re-uses a semicircular clip, is fastened on body of wall by pipeline, the two ends of clip are provided with through hole, allow blind hole align with through hole.Finally bolt or latch are passed through hole, then hammer on body of wall in blind hole, clip is fixed on body of wall.
When after piping foundation, if the diameter of new pipeline and old pipeline differs, it is necessary to change clip, more preferably after clip, through hole on clip cannot align with the blind hole on body of wall, with regard to needing again again to hole body of wall, reduces work efficiency.Now it is badly in need of a kind of structure being easy to piping foundation that can improve installation effectiveness.
Utility model content
The purpose of this utility model is to provide a kind of structure being easy to piping foundation that can improve installation effectiveness.
The base case that this programme provides is: is easy to the structure of piping foundation, is mainly used in being fixed on body of wall pipeline, including:
Clip, the centre of clip is provided with the elastic lobe of arcuation, and the both sides of clip are provided with through hole;
Installation sheet, the back side of installation sheet is provided with the adhesive linkage fixing with body of wall, the front of installation sheet is provided with the chute running through whole installation sheet, being sliding combined with two slide blocks in chute, chute is installed with the positive stop strip that anti-limited slip block departs from chute, positive stop strip is positioned at the notch of chute, screw rod all it is installed with on two slide blocks, being each passed through through hole on two screw rods, two screw rods are the most threaded nut, and nut is positioned at the outside of clip.
The operation principle of this programme and advantage are that installation sheet can be fixed on body of wall by adhesive linkage;Slide block coordinates with slide, the spacing of adjusting slider, and the screw rod on slide block can be made the most all to fit with the pipeline fixed;The anti-limited slip block of positive stop strip comes off from chute, and when clip is fixed on screw rod by nut, positive stop strip can allow slide block play more preferable fixation;Lobe, can adjust the spacing of two through holes on clip, it is ensured that two through holes can align with screw rod all the time according to the spacing of two slide blocks.The regulation of lobe, can be by changing the common cooperation of the radian of lobe, regulation clip position on screw rod, to meet through hole and the condition of screw rod alignment
This programme is easy to the structure of piping foundation, by the spacing of two slide blocks in regulation chute, makes screw rod fit with pipeline all the time, old pipeline is being removed, during new pipeline is installed, save the step that new pipeline is retightened, reach to improve the purpose of installation effectiveness.
Preferred version one: based on the preferred version of scheme, the two ends of clip are installed with filler strip.Filler strip contacts with each other with chute, and filler strip can reduce the contact area of clip and chute, and between filler strip and clip, interaction force is less, it is not easy to be corroded.
Preferred version two: the preferably preferred version of: the inner side of lobe is installed with rubber blanket.Rubber blanket can increase the frictional force between clip and pipeline, and rubber blanket can play cushioning effect between clip and pipeline simultaneously, allows clip preferably be fixed by pipeline.
Preferred version three: the preferably preferred version of two: slide block forms bolt with screw rod, and slide block is the head of bolt.Bolt have material be easy to get, the feature of simple in construction, meanwhile, other procedure of processing is being not required here, and the head of bolt is being connected with screw rod the most firm, it is possible to meeting the condition of fixed-piping.
Accompanying drawing explanation
Fig. 1 is the structural representation that this utility model is easy to the constructive embodiment of piping foundation;
Fig. 2 is the structural representation after pipeline is fixed on the wall by Fig. 1.
Detailed description of the invention
Below by detailed description of the invention, this utility model is described in further detail:
Reference in Figure of description includes: pipeline 1, body of wall 10, installation sheet 2, chute 21, screw rod 20, nut 24, clip 3, filler strip 33, through hole 32.
Embodiment is the most as shown in Figure 1: be easy to the structure of piping foundation, it is mainly used in being fixed on body of wall 10 pipeline 1, including: clip, the centre of clip is provided with the elastic lobe of arcuation, the both sides of clip are provided with through hole, the two ends of clip are installed with filler strip, and the inner side of lobe is installed with rubber blanket;Installation sheet, the back side of installation sheet is provided with the adhesive linkage fixing with body of wall, the front of installation sheet is provided with the chute running through whole installation sheet, is sliding combined with two bolts in chute, and the head of bolt is in chute, the positive stop strip that the head preventing bolt departs from it is installed with chute on chute, positive stop strip is positioned at the notch of chute, and two screw rods are each passed through through hole, and two screw rods are the most threaded nut, nut is positioned at the outside of clip, and clip is fixed on bolt by nut.
Clip 3, the centre of clip 3 is provided with the elastic lobe of arcuation, and the both sides of clip are provided with the through hole 32 passed for screw rod 20, and the two ends of clip 3 are installed with filler strip 33, and the inner side of lobe is installed with rubber blanket.
Time specifically used, as shown in Figure 2: first, installation sheet 2 is fixed on metope by the adhesive linkage at installation sheet 2 back side.It follows that allow pipeline 1 fit with chute 21, the then position of the head of slide bolt so that the head of bolt is positioned at the both sides of pipeline 1.Then, clip 3 is fastened on pipeline 1, and the screw rod 20 of the through hole 32 of lobe both sides with bolt is aligned.It follows that allow the screw rod 20 of bolt pass through hole 32, and with nut 24, clip 3 is fixed, prevent clip from departing from, thus reach to fix on the wall pipeline 1.
When old pipeline 1 is removed by needs, unscrew nut 24, allow clip 3 depart from bolt.The oldest pipeline 1 can be disassembled from body of wall 10.When the new diameter of pipeline 1 differs with the diameter of old pipeline 1, can be adapted to the diameter of new pipeline 1 by the spacing of two bolts of regulation, lobe has elasticity, it is possible to after the spacing of two bolts changes, it is ensured that through hole 32 energy of clip 3 and bolt alignment.
Above-described is only embodiment of the present utility model, and in scheme, the known general knowledge such as concrete structure and characteristic too much describes at this.Should be understood that; for a person skilled in the art, on the premise of without departing from this utility model structure, it is also possible to make some deformation and improvement; these also should be considered as protection domain of the present utility model, and these are all without affecting effect and the practical applicability that this utility model is implemented.The protection domain that this application claims should be as the criterion with the content of its claim, and the detailed description of the invention in description etc. records the content that may be used for explaining claim.

Claims (4)

1. it is easy to the structure of piping foundation, is mainly used in being fixed on body of wall pipeline, it is characterised in that including:
Clip, the centre of clip is provided with the elastic lobe of arcuation, and the both sides of clip are provided with through hole;
Installation sheet, the back side of installation sheet is provided with the adhesive linkage fixing with body of wall, the front of installation sheet is provided with the chute running through whole installation sheet, being sliding combined with two slide blocks in chute, chute is installed with the positive stop strip that anti-limited slip block departs from chute, positive stop strip is positioned at the notch of chute, screw rod all it is installed with on two slide blocks, being each passed through through hole on two screw rods, two screw rods are the most threaded nut, and nut is positioned at the outside of clip.
The structure being easy to piping foundation the most according to claim 1, it is characterised in that the two ends of clip are installed with filler strip.
The structure being easy to piping foundation the most according to claim 2, it is characterised in that the inner side of lobe is installed with rubber blanket.
The structure being easy to piping foundation the most according to claim 3, it is characterised in that slide block forms bolt with screw rod, and slide block is the head of bolt.
CN201620392854.3U 2016-05-04 2016-05-04 Structure convenient to pipeline is changed Expired - Fee Related CN205605979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620392854.3U CN205605979U (en) 2016-05-04 2016-05-04 Structure convenient to pipeline is changed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620392854.3U CN205605979U (en) 2016-05-04 2016-05-04 Structure convenient to pipeline is changed

Publications (1)

Publication Number Publication Date
CN205605979U true CN205605979U (en) 2016-09-28

Family

ID=56968771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620392854.3U Expired - Fee Related CN205605979U (en) 2016-05-04 2016-05-04 Structure convenient to pipeline is changed

Country Status (1)

Country Link
CN (1) CN205605979U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737133A (en) * 2018-12-26 2019-05-10 西安庆安电气控制有限责任公司 A kind of guard ring and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737133A (en) * 2018-12-26 2019-05-10 西安庆安电气控制有限责任公司 A kind of guard ring and its installation method

Similar Documents

Publication Publication Date Title
CN204959685U (en) Arc flood control device
CN205605979U (en) Structure convenient to pipeline is changed
CN205591586U (en) Can finely tune bracing piece for building of a tie distance
CN204025925U (en) A kind of novel dual card cuff structure
CN205480099U (en) Anti -knock connecting base
CN204573800U (en) A kind of lamp affixed to the ceiling adopting one-bolt fastening
CN209025129U (en) A kind of reamer flexible fastening link block
CN203051436U (en) Locking nut
CN203743628U (en) Buckling lock hoop for pipe connection of dust-removing device
CN208329249U (en) A kind of replaceable insertion early warning type mild steel damper
CN206859838U (en) A kind of breast board fixing device
CN206889418U (en) A kind of mounting structure of column braces
CN202484007U (en) Fixing device for pipe fitting
CN206595575U (en) A kind of switch cubicle
CN206523577U (en) Arrester test car
CN205777329U (en) A kind of Residential fire air bleeding valve
CN204983446U (en) Adjustable installation component of arc glass
CN202596280U (en) Connecting piece for drilling-free door crack-penetrating lockset
CN209510389U (en) A kind of hangers victory assembling device
CN209323272U (en) A kind of fastener device for the urban track traffic that anti-seismic performance is good
CN109056881A (en) A kind of reamer flexible fastening link block
CN209413711U (en) A kind of sliding door track of easy access
CN208588057U (en) A kind of central air-conditioning pipe connection hooping structure
CN203684677U (en) Quickly-disassembled self-sealing crossing bolt
CN204106182U (en) One encircles type metal bone fracture plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20170504