CN204021981U - A kind of ore grinding fast-assembling harbour - Google Patents

A kind of ore grinding fast-assembling harbour Download PDF

Info

Publication number
CN204021981U
CN204021981U CN201420468242.9U CN201420468242U CN204021981U CN 204021981 U CN204021981 U CN 204021981U CN 201420468242 U CN201420468242 U CN 201420468242U CN 204021981 U CN204021981 U CN 204021981U
Authority
CN
China
Prior art keywords
harbour
assembling
ore grinding
pier
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420468242.9U
Other languages
Chinese (zh)
Inventor
方磊
徐玮
王虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Engineering Co Ltd Of Zhoushan Htc
Original Assignee
Traffic Engineering Co Ltd Of Zhoushan Htc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Engineering Co Ltd Of Zhoushan Htc filed Critical Traffic Engineering Co Ltd Of Zhoushan Htc
Priority to CN201420468242.9U priority Critical patent/CN204021981U/en
Application granted granted Critical
Publication of CN204021981U publication Critical patent/CN204021981U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a kind of ore grinding fast-assembling harbour, comprise two pier bodies that cross section is stepped and be arranged symmetrically with mutually, water channel is located between two pier bodies, described pier body is divided into tops bar and gets out of a predicament or an embarrassing situation, described in get out of a predicament or an embarrassing situation and height be installed above lower than the steel framework body of topping bar; Hopper is fixed in steel framework body, and its below discharging opening is communicated with Material disintegrator, and conveying slideway is arranged on Material disintegrator below and extends to water channel center position.Compared with prior art, the utlity model has the simple in structure and fast advantage of speed of loading, there are wide market outlook.

Description

A kind of ore grinding fast-assembling harbour
Technical field
The utility model belongs to building harbour technical field, is specifically related to a kind of ore grinding fast-assembling harbour.
Background technology
Harbour claims again ferry, is one and from bank, is stretched the causeway in water, may be also a row by the stair that stretch on the bank in water, its majority is artificial civil engineering structure, may be also natural formation.
Harbour can be divided into by purposes:
(1) passenger wharf: be mainly to allow fall on passenger ship, small-sized passenger wharf may be only for street cross, the small boat such as speedboat anchors alongside the shore, and large-scale passenger wharf, for example: cruise terminal, can anchor alongside the shore for large-scale cruise.Passenger wharf can divide makes public's harbour, ferry terminal and cruise terminal.The opening of public's harbour is used (need depend on the depth of water, absorb water the ship darker than the water level of terminal enclosure Layer Near The Sea Surface and can not enter harbour) to all ships; Ferry terminal is conventionally special-purpose by the course line of fixing, and many course lines also can share same ferry terminal.Some connects the ferry terminal in country variant or area, can set up entry and exit facility, for example: Hong Kong-Macau Ferry Terminal.Cruise terminal is typically used as cruise and anchors alongside the shore, most can be with perfect auxiliary facility, customs for example, entry and exit Gui Weiji health quarantine office, luggage treatment region, ticketing service place, Ji Shang drop-off region, touristy coach berthing space etc.Due to cruise volume and displacement large, cruise terminal need to be built wealthy place, depth of water port in.Most of cruise terminals do not specify You He company to use.
(2) goods station: be mainly as handling goods, with purposes and right to use classification, can divide and make public's goods station, terminal, oil product harbour, mineral products harbour, river trade terminal and common goods station etc.
(3) automobile berth:: be for some special vessel banks (mostly being large-scale special boats and ships), to allow automobile by land go on board, the use that automobile is aboard ship gone ashore.
(4) container wharf:: the harbour of specializing in container handling.It generally will have special handling, transportation device, have the broad stockyard of transporting something containerized, storage container, has the container freight station for freight classification and dismounting freight container.Because freight container can form normalized entity various numerous and diverse part goods and packing groceries, therefore can adopt large-scale Special Equipment to load and unload, transport, guarantee cargo handing, shipping mass, improve stevedoring efficiency.
(5) oil jetty: the professional harbour of handling crude oil and finished oil.It will have certain fire safety distance apart from general cargo (visitor) harbour and other fixed buildings, referring to " oil port ".The general characteristic of this class harbour is that cargo load is little, and handling equipment are fairly simple, and when oil carrier is little (as inland river system), the harbour of general light pattern all can adapt to.Due to marine hugeization of oil tanker in modern age, according to oil tanker, resist large, the deep drawing feature of stormy waves ability, harbour is moored to steady conditional request not high.The deep water wharf (or facility) that has at present four kinds of handling crude oil, that is: single point mooring (SPM), spread mooring, detached wharf and jetty pier.First three is planted does not generally have wind wave prevention building, and last a kind of stormy waves building of whether setting up defences, be depending on arrangement form and local condition.
Mostly existing goods station is to adopt transmission conveyor line to be directly sent to above freighter for the loading of ore and coal, and ore materials is very large to the site requirements of harbour like this, and the efficiency of simultaneously loading is also very slow.In addition, after ore is come in digging, its particle size differs, and need to be broken into the large small particle diameter needing and carry out aspect following process.
Summary of the invention
The utility model, for above shortcoming, is based on solving existing goods station loading ore place and takies greatly, the problem that speed of loading is slow.Designed a kind of ore grinding fast-assembling harbour.This harbour is directly placed on material among huge hopper container, material is taken up an area little, in superfast loading, material can also be carried out to fragmentation, without follow-up reprocessing, saves cost.
For realizing the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of ore grinding fast-assembling harbour, comprise two pier bodies that cross section is stepped and be arranged symmetrically with mutually, water channel is located between two pier bodies, and described pier body is divided into tops bar and get out of a predicament or an embarrassing situation, described in get out of a predicament or an embarrassing situation and height be installed above lower than the steel framework body of topping bar; Hopper is fixed in steel framework body, and its below discharging opening is communicated with Material disintegrator, and conveying slideway is arranged on Material disintegrator below and extends to water channel center position.
Preferentially, for the ease of material, directly fall in hopper, in top bar edge and hopper, be connected with sliding plate.
Preferentially, in order to prevent that freighter from destroying the scratch of harbour, is also provided with rubber fender above the pier body of water channel both sides.
Preferentially, above steel framework body, be also provided with the cat ladder of being convenient to arrive each platform, be convenient to like this all parts to overhaul.
Preferentially, hopper is inverted trapezoidal structure, and its discharging opening is communicated with Material disintegrator inlet point, plays like this automatic blanking, and the appearance loading capability of material is also very large simultaneously.
The utility model has the advantages that: the truck by material by delivery is poured directly in high-capacity hopper, more directly by after ore materials fragmentation, directly load by crusher, speed is fast, and efficiency is high.Compared with prior art, the utlity model has the simple in structure and fast advantage of speed of loading, there are wide market outlook.
Accompanying drawing explanation
Next by means of the accompanying drawing of embodiment, the utility model is carried out to brief description now.In accompanying drawing:
Fig. 1 shows the structural representation of the utility model ore grinding fast-assembling harbour;
Fig. 2 shows extremely inner each parts of the utility model steel framework body and forms schematic diagram.
In figure: 1, pier body, 2, hopper, 3, Material disintegrator, 4, conveying slideway, 5, rubber fender, 6, water channel, 7, steel framework body, 8, sliding plate, 9, get out of a predicament or an embarrassing situation, 10, top bar, 11, cat ladder.
The specific embodiment
Below in conjunction with specific embodiment, the utility model is elaborated.Following examples will contribute to those skilled in the art further to understand the utility model, but not limit in any form the utility model.It should be pointed out that to those skilled in the art, without departing from the concept of the premise utility, can also make some distortion and improvement.These all belong to protection domain of the present utility model.
As shown in the figure, a kind of ore grinding fast-assembling harbour, comprise two pier bodies 1 that cross section is stepped and be arranged symmetrically with mutually, water channel 6 is located between two pier bodies 1, described pier body 1 is divided into tops bar 10 and get out of a predicament or an embarrassing situation 9, described in get out of a predicament or an embarrassing situation and 9 height be installed lower than topping bar 10 steel framework body 7 above; Hopper 2 is fixed in steel framework body 7, and its below discharging opening is communicated with Material disintegrator 3, and conveying slideway 4 is arranged on Material disintegrator 3 belows and extends to water channel 6 center positions.
For the ease of material, directly fall in hopper 2, in top bar 10 edges and hopper 2, be connected with sliding plate 8.
In order to prevent that freighter from destroying the scratch of harbour, the pier body 1 of water channel 6 both sides is also provided with rubber fender 5 above.
Steel framework body 7 is also provided with the cat ladder 11 of being convenient to arrive each platform above, is convenient to like this all parts to overhaul.
Hopper 2 is inverted trapezoidal structure, and its discharging opening is communicated with Material disintegrator 3 inlet points, plays like this automatic blanking, and the appearance loading capability of material is also very large simultaneously.
The disclosed this ore grinding fast-assembling harbour of the utility model, loading principle is such, and the outside highway of haul trucks entering directly arrives and tops bar 10, and it is interior fixing that loading freighter enters two water channels 6 between pier body 1.Haul trucks entering self-unloading is poured ore in hopper 2 automatically, the effect of ore by gravity automatically falls into Material disintegrator 3 inside and carries out particle, after particle completes, by conveying slideway 4, be directly drained into above freighter, by both sides, load simultaneously, freighter is filled fast, meanwhile, material is placed in hopper 2 and can take a large amount of places.

Claims (5)

1. an ore grinding fast-assembling harbour, comprise two pier bodies (1) that cross section is stepped and be arranged symmetrically with mutually, water channel (6) is located between two pier bodies (1), it is characterized in that: described pier body (1) is divided into tops bar (10) and get out of a predicament or an embarrassing situation (9), described in get out of a predicament or an embarrassing situation (9) height is installed lower than the steel framework body (7) of top bar (10) above; Hopper (2) is fixed in steel framework body (7), and its below discharging opening is communicated with Material disintegrator (3), and conveying slideway (4) is arranged on Material disintegrator (3) below and extends to water channel (6) center position.
2. ore grinding fast-assembling harbour according to claim 1, is characterized in that, described in top bar in (10) edge and hopper (2) and be connected with sliding plate (8).
3. ore grinding fast-assembling harbour according to claim 1, is characterized in that, the pier body (1) of described water channel (6) both sides is also provided with rubber fender (5) above.
4. according to the ore grinding fast-assembling harbour described in any one in claim 1-3, it is characterized in that, described steel framework body (7) is also provided with the cat ladder (11) of being convenient to arrive each platform above.
5. according to the ore grinding fast-assembling harbour described in any one in claim 1-3, it is characterized in that, described hopper (2) is inverted trapezoidal structure, and its discharging opening is communicated with Material disintegrator (3) inlet point.
CN201420468242.9U 2014-08-19 2014-08-19 A kind of ore grinding fast-assembling harbour Expired - Fee Related CN204021981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420468242.9U CN204021981U (en) 2014-08-19 2014-08-19 A kind of ore grinding fast-assembling harbour

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420468242.9U CN204021981U (en) 2014-08-19 2014-08-19 A kind of ore grinding fast-assembling harbour

Publications (1)

Publication Number Publication Date
CN204021981U true CN204021981U (en) 2014-12-17

Family

ID=52061875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420468242.9U Expired - Fee Related CN204021981U (en) 2014-08-19 2014-08-19 A kind of ore grinding fast-assembling harbour

Country Status (1)

Country Link
CN (1) CN204021981U (en)

Similar Documents

Publication Publication Date Title
CN101279640B (en) Ship-shore double supporting type cargo handling machine
HK1033750A1 (en) Container transfer terminal system and method
JP2000505166A (en) Modular caisson for use in port construction, expansion and modernization
Mayer Some geographic aspects of technological change in maritime transportation
Blokus-Roszkowska et al. Port critical infrastructure network
Malchow Port feeder barge: advanced waterborne container logistics for ports
CN204021981U (en) A kind of ore grinding fast-assembling harbour
CN204979163U (en) A overhang slope multilane rolls adorns landing stage for inland river
JP2018535894A (en) Ultra shallow draft bulk carrier
CN101428710A (en) Automatized storing, loading and unloading facility for container
CN204057317U (en) One is transferred handling carrying ship
CN204150732U (en) A kind of multifunctional ship integrating shipment, unload a ship, transport
WO2011078420A1 (en) Floating hybrid mobile harbor
Paulauskas et al. Ship safety in open ports
Malchow Port feeder barges as a means to improve intra-port container logistics in multi-terminal ports
Elzinga et al. Movements of moored ships in harbours
CN104590501A (en) Method based on material storing and transporting platform to develop and construct island environment and platform thereof
CN204057318U (en) One is transferred handling carrier
CN204626332U (en) A kind of mobile grain shipment harbour
CN212047809U (en) Large-scale offshore transfer barge with ore storage function
BÂRDAN The role of Giurgiulesti International Free Port in the development of economy of Moldova
Lau et al. Revising Hong Kong’s midstream operation: A discussion on the Port Feeder Barge concept
Oberman Functional Planning of Bulk Material Ports
Ghoos et al. CHAPTER 8 Berth and terminal design in general. Storage facilities and cargo-handling systems
CN204624753U (en) A kind of mobile stone shipment harbour

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20150819

EXPY Termination of patent right or utility model