CN204014760U CN201420496342.2U CN201420496342U CN204014760U CN 204014760 U CN204014760 U CN 204014760U CN 201420496342 U CN201420496342 U CN 201420496342U CN 204014760 U CN204014760 U CN 204014760U
Authority
CN
China
Prior art keywords
float tube
frame member
float
hole
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420496342.2U
Other languages
Chinese (zh)
Inventor
陶启友
胡昱
黄小华
王绍敏
郭根喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China Sea Fisheries Research Institute Chinese Academy Fishery Sciences
Original Assignee
South China Sea Fisheries Research Institute Chinese Academy Fishery Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China Sea Fisheries Research Institute Chinese Academy Fishery Sciences filed Critical South China Sea Fisheries Research Institute Chinese Academy Fishery Sciences
Priority to CN201420496342.2U priority Critical patent/CN204014760U/en
Application granted granted Critical
Publication of CN204014760U publication Critical patent/CN204014760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Farming Of Fish And Shellfish (AREA)

Abstract

The utility model discloses a kind of workbench controlled for cage culture management, comprise and swim in the main platform body on sea level and the mooring system for locating platform main body, described main platform body is provided with the float tube framework that top is equipped with platform panel, it is characterized in that: described float tube framework comprises multiple frame member and Duo Gen float tube, described frame member is the injection moulding connector being provided with three float tube perforation, three float tube perforation are arranged in parallel, described each float tube is arranged parallel to each other setting at grade, three float tubes perforation of each frame member is set in three adjacent float tubes, every root float tube is set with two or more frame member.The utility model effectively raises the pliability of float tube framework under the prerequisite guaranteeing workbench float tube frame stability, thus make the instant impact ability to bear of workbench be obtained raising, reduce impaired when workbench runs into off-lying sea severe sea condition may.

Description

A kind of workbench controlled for cage culture management
Technical field
The utility model relates to a kind of workbench controlled for cage culture management.
Background technology
Along with China's cage culture industry is fast-developing, cage culture offshore is more and more far away, and aquaculture sea area is more and more darker, and net cage total amount has surpassed 1,000,000.Current China establishes multiple cage culture Demonstration Base and industrial zone, net cage offshore coastal, controls workbench, bring a series of cage culture problem of management: as the cleaning etc. of the feedstuff feeding in breeding process, keed owing to lacking aquaculture management.
In current workbench, less main of bearing capacity is formed with timber add-on type foam or waste or used plastics bucket, and the ability of its storm resisting is more weak; Bearing capacity is mainly more greatly steel structural form framework, operating platform serves as float with cylindrical PE bucket filling foamed plastics, the overall buoyancy of platform is ensured by the alignment placement of PE bucket, using " H " shaped steel as platform skeleton, ensure rigid on sea of platform and integrally, but this workbench rigidity is rigid has a surplus, flexible not enough, when running into off-lying sea severe sea condition, moment, excessive impulsive force easily damaged platform skeleton, and steel Corrosion Maintenance cost is larger.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of workbench controlled for cage culture management.
Solve the problems of the technologies described above, the technical scheme that the utility model adopts is as follows:
A kind of workbench controlled for cage culture management, comprise and swim in the main platform body on sea level and the mooring system for locating platform main body, described main platform body is provided with the float tube framework that top is equipped with platform panel, it is characterized in that: described float tube framework comprises multiple frame member and Duo Gen float tube, described frame member is the injection moulding connector being provided with three float tube perforation, three float tube perforation are arranged in parallel, described each float tube is arranged parallel to each other setting at grade, three float tubes perforation of each frame member is set in three adjacent float tubes, every root float tube is set with two or more frame member.
As a kind of embodiment of the present utility model, described frame member is also provided with two installing holes, one of them mounting hole site is between middle float tube perforation and left side float tube are bored a hole, another mounting hole site is between middle float tube perforation and right side float tube are bored a hole, the bottom surface of described platform panel is provided with the buttress brace of few one of float tube described in number ratio, buttress brace is seated in the end face of described frame member, each buttress brace is all parallel to described float tube and arranges and on the position of each root buttress brace all between adjacent two float tubes, each frame member is all connected with the buttress brace be located thereon by bolt, wherein, the bolt head of bolt is positioned at installing hole, thread head is connected on buttress brace.
As a kind of embodiment of the present utility model, described platform panel is made up of plank, and described buttress brace is made up of sleeper.
As a kind of embodiment of the present utility model, described frame member is also provided with two anchoring holes, these two anchoring holes lay respectively at below described two installing holes, described mooring system comprises anchor line and anchor, described anchor sinks on sea bed, and the lower end of described anchor line connects anchor, upper end connects above-mentioned anchoring hole.
In order to reduce the active force of current to workbench, improve as one of the present utility model, described frame member is also provided with several through holes, and described through hole is arranged around described installing hole and anchoring hole.
In order to limit bone frame member sliding axially under external force in float tube, improve as one of the present utility model, the outer wall that described float tube is positioned at frame member both sides is welded with a spacing injection moulding block respectively.
In order to improve the safety of workbench, avoiding float tube to break and to sink after water, as a modification of the present invention, in the internal cavities of described each float tube, being filled with foams.
Compared with prior art, the utility model has following beneficial effect:
The utility model frame member be separated connects the float tube framework that many float tubes form workbench, the pliability of float tube framework is effectively raised under the prerequisite guaranteeing workbench float tube frame stability, thus make the instant impact ability to bear of workbench be obtained raising, reduce impaired when workbench runs into off-lying sea severe sea condition may; The float tube frame assembled of workbench is convenient, and size regulates by the length of float tube and radical; And, this float tube framework can easily for cage culture management controllers and equipment provide working space by laying platform panel at top, therefore, workbench of the present utility model can be applicable in cage culture management, from the cluster management requirement that spatially ensure that net cage industrialized aquaculture, its ocean existence operating mode can adapt to 60 meters with neritic zone, resident boats and ships and workman is replaced to implement cultivation, being solve a most important ring in offshore installations aquaculture industry link technology, is the key supporting whole offshore installations cultivation development.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Fig. 1 is the plan structure schematic diagram of workbench of the present utility model;
Fig. 2 is the structural representation of frame member in the utility model;
Fig. 3 is the A-A sectional structure schematic diagram of Fig. 1;
Fig. 4 is the B portion enlarged diagram of Fig. 3.
Embodiment
As shown in Figures 1 to 4, the workbench controlled for cage culture management of the present utility model, comprises and swims in the main platform body on the SL of sea level and the mooring system for locating platform main body, and wherein, main platform body is provided with float tube framework peace deck plate 1.
Float tube framework of the present utility model comprises multiple frame member 3 and Duo Gen float tube 4, the quantity of frame member 3 and float tube 4 adapts to the loading capacity of platform panel 1 area and workbench, frame member 3 is injection moulding connector, this injection moulding connector is provided with three float tube perforation 3a, two installing hole 3b, two anchoring hole 3c and several through holes 3d, three float tube perforation 3a are arranged in parallel, one of them installing hole 3b bores a hole between 3a at middle float tube perforation 3a and left side float tube, another installing hole 3b bores a hole between 3a at middle float tube perforation 3a and right side float tube, two anchoring hole 3c lay respectively at below two installing hole 3b, through hole 3d is arranged around installing hole 3b and anchoring hole 3c.
Foams 5 are filled with in the internal cavities of float tube 4 of the present utility model, each float tube 4 is arranged parallel to each other setting at grade, three float tubes perforation 3a of above-mentioned each frame member 3 are set in three adjacent float tubes 4, further, every root float tube 4 is set with two or more frame member 3.
Platform panel 1 of the present utility model is made up of plank, the bottom surface of platform panel 1 is provided with the few buttress brace be made up of sleeper 2 of number ratio float tube 4, buttress brace 2 is seated in the end face of frame member 3, each buttress brace 2 is all parallel to float tube 4 and arranges and on the position of each root buttress brace 2 all between adjacent two float tubes 4, each frame member 3 is all connected with the buttress brace 2 be located thereon by bolt 6, wherein, the bolt head of bolt 6 is positioned at installing hole 3b, thread head is connected on buttress brace 2, thus makes platform panel 1 be laid on the top of float tube framework.
In addition, in order to limit bone frame member sliding axially under external force in float tube, the outer wall that float tube 4 is positioned at frame member 3 both sides is welded with a spacing injection moulding block 9 respectively, and this spacing injection moulding block 9 can weld after frame member 3 has been located in float tube 4.
Mooring system of the present utility model comprises anchor line 7 and anchor 8, and anchor 8 sinks on sea bed SF, and the lower end of anchor line 7 connects anchor 8, upper end connects above-mentioned anchoring hole 3c.
The utility model does not limit to and above-mentioned embodiment; according to foregoing; according to ordinary technical knowledge and the customary means of this area; do not departing under the utility model above-mentioned basic fundamental thought prerequisite; the utility model can also make the equivalent modifications of other various ways, replacement or change, all drops among protection domain of the present utility model.Such as, above-mentioned anchor line also can make anchor chain into.

Claims (7)

1. the workbench controlled for cage culture management, comprise and swim in the main platform body on sea level (SL) and the mooring system for locating platform main body, described main platform body is provided with the float tube framework that top is equipped with platform panel (1), it is characterized in that: described float tube framework comprises multiple frame member (3) and many float tubes (4), described frame member (3) is for being provided with the injection moulding connector of three float tubes perforation (3a), three float tubes perforation (3a) are arranged in parallel, described each float tube (4) is arranged parallel to each other setting at grade, three float tubes perforation (3a) of each frame member (3) are set in three adjacent float tubes (4), every root float tube (4) is set with two or more frame member (3).
2. workbench according to claim 1, it is characterized in that: described frame member (3) is also provided with two installing holes (3b), one of them installing hole (3b) is positioned at middle float tube perforation (3a) and left side float tube is bored a hole between (3a), another installing hole (3b) is positioned at middle float tube perforation (3a) and right side float tube is bored a hole between (3a), the bottom surface of described platform panel (1) is provided with the buttress brace (2) of few one of float tube described in number ratio (4), buttress brace (2) is seated in the end face of described frame member (3), each buttress brace (2) is all parallel to described float tube (4) and arranges and each root buttress brace (2) is all positioned on the position between adjacent two float tubes (4), each frame member (3) is all connected with the buttress brace be located thereon (2) by bolt (6), wherein, the bolt head of bolt (6) is positioned at installing hole (3b), thread head is connected on buttress brace (2).
3. workbench according to claim 2, is characterized in that: described platform panel (1) is made up of plank, and described buttress brace (2) is made up of sleeper.
4. workbench according to claim 2, it is characterized in that: described frame member (3) is also provided with two anchorings hole (3c), these two anchorings hole (3c) lay respectively at described two installing holes (3b) below, described mooring system comprises anchor line (7) and anchor (8), described anchor (8) sinks on sea bed (SF), and the lower end of described anchor line (7) connects anchor (8), upper end connects above-mentioned anchoring hole (3c).
5. workbench according to claim 4, it is characterized in that: described frame member (3) is also provided with several through holes (3d), described through hole (3d) is arranged around described installing hole (3b) and anchoring hole (3c).
6. the workbench according to claim 1 to 5 any one, is characterized in that: the outer wall that described float tube (4) is positioned at frame member (3) both sides is welded with a spacing injection moulding block (9) respectively.
7. the workbench according to claim 1 to 5 any one, is characterized in that: be filled with foams (5) in the internal cavities of described each float tube (4).
CN201420496342.2U 2014-08-29 2014-08-29 A kind of workbench controlled for cage culture management Expired - Fee Related CN204014760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420496342.2U CN204014760U (en) 2014-08-29 2014-08-29 A kind of workbench controlled for cage culture management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420496342.2U CN204014760U (en) 2014-08-29 2014-08-29 A kind of workbench controlled for cage culture management

Publications (1)

Publication Number Publication Date
CN204014760U true CN204014760U (en) 2014-12-17

Family

ID=52054694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420496342.2U Expired - Fee Related CN204014760U (en) 2014-08-29 2014-08-29 A kind of workbench controlled for cage culture management

Country Status (1)

Country Link
CN (1) CN204014760U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104642225A (en) * 2015-02-02 2015-05-27 中国水产科学研究院南海水产研究所 Main framework for single-pipe round floating type large-scale deep water net cage
CN105010190A (en) * 2015-07-27 2015-11-04 广东联塑科技实业有限公司 Compact-type net cage support
CN105010187A (en) * 2015-07-27 2015-11-04 广东联塑科技实业有限公司 Integrated support for net cage
CN107182877A (en) * 2017-06-06 2017-09-22 中国水产科学研究院南海水产研究所 A kind of Largesize deepwater net cage of use longitudinal framing main truss
CN109156406A (en) * 2018-08-15 2019-01-08 海南联塑科技实业有限公司 A kind of deep water mesh cage anchoring piece
CN109479759A (en) * 2018-10-18 2019-03-19 浙江海洋大学 A kind of raft culture management platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104642225A (en) * 2015-02-02 2015-05-27 中国水产科学研究院南海水产研究所 Main framework for single-pipe round floating type large-scale deep water net cage
CN105010190A (en) * 2015-07-27 2015-11-04 广东联塑科技实业有限公司 Compact-type net cage support
CN105010187A (en) * 2015-07-27 2015-11-04 广东联塑科技实业有限公司 Integrated support for net cage
CN107182877A (en) * 2017-06-06 2017-09-22 中国水产科学研究院南海水产研究所 A kind of Largesize deepwater net cage of use longitudinal framing main truss
CN109156406A (en) * 2018-08-15 2019-01-08 海南联塑科技实业有限公司 A kind of deep water mesh cage anchoring piece
CN109479759A (en) * 2018-10-18 2019-03-19 浙江海洋大学 A kind of raft culture management platform

Similar Documents

Publication Publication Date Title
CN204014760U (en) A kind of workbench controlled for cage culture management
CN203890992U (en) Gear-rack-type lifting system for offshore wind turbine installation
CN204530433U (en) Steel pipe pile foundation combination steel trestle
CN104358233B (en) A kind of floating clipping wall unit and clipping wall group being applicable to marine float
CN107653895B (en) Combined offshore six-buoy buoyancy tank foundation structure and construction method thereof
GB2586893A8 (en) Offshore power distribution method and arrangement
CN104264704A (en) Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN204151746U (en) A kind of floating clipping wall unit and clipping wall group being applicable to marine float
CN101491207B (en) One-piece large raft culturing device
CN104186381A (en) Deepwater net cage with single-point mooring system
KR100745080B1 (en) Lifting management system for the underwater fish farming tools
CN106926989A (en) A kind of combined simple ocean platform and its construction method
CN103993582B (en) A kind of by boat equipment
CN203985563U (en) There is the deep water mesh cage of single-point mooring system
CN203795380U (en) Mooring device
CN104002936B (en) A kind of shoal, strand drilling platform
CN211111302U (en) Ecological floating island spud pile
CN108791738B (en) A kind of Large marine blower entirety floating support mounting method
CN102912811A (en) Multi-base gravity type base structure
CN200987323Y (en) Full automatic fish-farming net cage
CN104488789A (en) Fish raft net cage prepared from steel material
CN211107912U (en) Offshore drilling platform suitable for intertidal zone operation
CN204047609U (en) There is the deep water mesh cage of class triangle float tube framework
CN204456044U (en) Mixing floating offshore booster station structure
CN209159940U (en) A kind of fixed device of surface floating body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20150829