CN204001667U - A kind of novel scaffold Tiebar structure for civil construction project - Google Patents

A kind of novel scaffold Tiebar structure for civil construction project Download PDF

Info

Publication number
CN204001667U
CN204001667U CN201420417347.1U CN201420417347U CN204001667U CN 204001667 U CN204001667 U CN 204001667U CN 201420417347 U CN201420417347 U CN 201420417347U CN 204001667 U CN204001667 U CN 204001667U
Authority
CN
China
Prior art keywords
hookup
hole
group
connecting part
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420417347.1U
Other languages
Chinese (zh)
Inventor
陈志云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lin Huachang
Shenzhen Huapeng Engineering Construction Co ltd
Zhao Jiefeng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420417347.1U priority Critical patent/CN204001667U/en
Application granted granted Critical
Publication of CN204001667U publication Critical patent/CN204001667U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of novel scaffold Tiebar structure for civil construction project, comprise hookup and the rod assembly of being located at hookup one side, hookup one side is provided with a perforation, rod assembly comprises group joint and pull bar, group joint is in order to cylinder lever connecting rod and hookup, group joint comprises head and is convexly set in the group connecting part of head one end, head is connected to hookup inner side, group connecting part passes the perforation of hookup, one end that group connecting part protrudes perforation is also provided with the first through hole, one end of pull bar is socketed on group connecting part outside, pull bar is provided with the second through hole being communicated with the first through hole, coupling assembling connects pull bar and group connecting part through the first through hole and the second through hole in order to group.Pull bar of the present utility model is connected with group joint by coupling assembling, and then is fixed on a side of hookup, and therefore easily assembling, can reduce manufacturing cost, is suitable for large-scale production, and does not affect overall rigidity, reduces energy consumption, has practicality.

Description

A kind of novel scaffold Tiebar structure for civil construction project
Technical field
The utility model relates to civil construction project technical field, refers to especially a kind of novel scaffold Tiebar structure for civil construction project.
Background technology
At present, scaffold is firmly erected to the outside of building, conventionally need to utilize multiple scaffold pull bars to connect scaffold steel pipe on wall.And scaffold pull bar on the market not only manufacturing cost is high, and need to rely on welding to be fixed, cause syndeton to lose efficacy if there is the situations such as rosin joint, there is larger potential safety hazard.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of novel scaffold Tiebar structure for civil construction project, with scaffold pull bar in solution prior art, not only manufacturing cost is high, and need to rely on welding to be fixed, cause syndeton to lose efficacy if there is the situations such as rosin joint, have the problem of larger potential safety hazard.
For solving the problems of the technologies described above, embodiment of the present utility model provides a kind of novel scaffold Tiebar structure for civil construction project, comprise hookup and the rod assembly of being located at hookup one side, described hookup can supply clip scaffold steel pipe, described rod assembly can be for the wall of connecting building thing, described hookup one side is provided with a perforation, described rod assembly comprises group joint and pull bar, described group of joint is in order to cylinder lever connecting rod and hookup, described group of joint comprises head and is convexly set in the group connecting part of head one end, described head is connected to hookup inner side, described group connecting part passes the perforation of hookup, one end that described group connecting part protrudes perforation is also provided with the first through hole, one end of described pull bar is socketed on group connecting part outside, described pull bar is provided with the second through hole being communicated with described the first through hole, coupling assembling connects described pull bar and group connecting part through described the first through hole and the second through hole in order to group.
Wherein, in a tubular form, described the first through hole radially extends and is arranged in group connecting part described group connecting part.
Wherein, described the second through hole radially extends and is arranged in pull bar one end.
Wherein, described coupling assembling comprises bolt and nut, and described bolt is through described the first through hole and the second through hole, and described nut is bolted in bolt end.
The beneficial effect of technique scheme of the present utility model is as follows:
In such scheme, novel scaffold Tiebar structure for civil construction project of the present utility model, its pull bar is connected with group joint by coupling assembling, and then be fixed on a side of hookup, therefore easily assembling, can reduce manufacturing cost, be suitable for large-scale production, and do not affect overall rigidity, reduce energy consumption, there is practicality.
Brief description of the drawings
Fig. 1 is the structural representation of the novel scaffold Tiebar structure for civil construction project of the utility model embodiment.
Fig. 2 is the sectional view of the rod assembly of the utility model embodiment.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearer, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
As depicted in figs. 1 and 2, a kind of novel scaffold Tiebar structure for civil construction project that the utility model embodiment provides, comprise hookup 1 and the rod assembly 2 of being located at hookup 1 one sides, described hookup 1 can supply clip scaffold steel pipe, described rod assembly 2 can be for the wall of connecting building thing, described hookup 1 one sides are provided with a perforation 11, described rod assembly 2 comprises group joint 21 and pull bar 22, described group of joint 21 is in order to cylinder lever connecting rod 22 and hookup 1, described group of joint 21 comprises head 211 and is convexly set in the group connecting part 212 of head 211 one end, described head 211 is connected to hookup 1 inner side, described group connecting part 212 passes the perforation 11 of hookup 1, one end that described group connecting part 212 protrudes perforation 11 is also provided with the first through hole 213, one end of described pull bar 22 is socketed on group connecting part 212 outsides, described pull bar 22 is provided with the second through hole 221 being communicated with described the first through hole 213, coupling assembling 3 connects described pull bar 22 and group connecting part 212 through described the first through hole 213 and the second through hole 221 in order to group.
In a tubular form, described the first through hole 213 radially extends and is arranged in group connecting part described group connecting part 212.
Described the second through hole 221 radially extends and is arranged in pull bar 22 one end.
Described coupling assembling 3 comprises bolt 31 and nut 32, and described bolt 31 is through described the first through hole 213 and the second through hole 221, and described nut 32 is bolted in bolt 31 ends.
In such scheme, novel scaffold Tiebar structure for civil construction project of the present utility model, its pull bar is connected with group joint by coupling assembling, and then be fixed on a side of hookup, therefore easily assembling, can reduce manufacturing cost, be suitable for large-scale production, and do not affect overall rigidity, reduce energy consumption, there is practicality.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; do not departing under the prerequisite of principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (4)

1. the novel scaffold Tiebar structure for civil construction project, comprise hookup and the rod assembly of being located at hookup one side, described hookup can supply clip scaffold steel pipe, described rod assembly can be for the wall of connecting building thing, it is characterized in that, described hookup one side is provided with a perforation, described rod assembly comprises group joint and pull bar, described group of joint is in order to cylinder lever connecting rod and hookup, described group of joint comprises head and is convexly set in the group connecting part of head one end, described head is connected to hookup inner side, described group connecting part passes the perforation of hookup, one end that described group connecting part protrudes perforation is also provided with the first through hole, one end of described pull bar is socketed on group connecting part outside, described pull bar is provided with the second through hole being communicated with described the first through hole, coupling assembling connects described pull bar and group connecting part through described the first through hole and the second through hole in order to group.
2. the novel scaffold Tiebar structure for civil construction project according to claim 1, is characterized in that, in a tubular form, described the first through hole radially extends and is arranged in group connecting part described group connecting part.
3. the novel scaffold Tiebar structure for civil construction project according to claim 1, is characterized in that, described the second through hole radially extends and is arranged in pull bar one end.
4. according to the novel scaffold Tiebar structure for civil construction project described in claim 2 or 3, it is characterized in that, described coupling assembling comprises bolt and nut, and described bolt is through described the first through hole and the second through hole, and described nut is bolted in bolt end.
CN201420417347.1U 2014-07-25 2014-07-25 A kind of novel scaffold Tiebar structure for civil construction project Expired - Fee Related CN204001667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420417347.1U CN204001667U (en) 2014-07-25 2014-07-25 A kind of novel scaffold Tiebar structure for civil construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420417347.1U CN204001667U (en) 2014-07-25 2014-07-25 A kind of novel scaffold Tiebar structure for civil construction project

Publications (1)

Publication Number Publication Date
CN204001667U true CN204001667U (en) 2014-12-10

Family

ID=52041690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420417347.1U Expired - Fee Related CN204001667U (en) 2014-07-25 2014-07-25 A kind of novel scaffold Tiebar structure for civil construction project

Country Status (1)

Country Link
CN (1) CN204001667U (en)

Similar Documents

Publication Publication Date Title
CN204435843U (en) A kind of steel tube scaffold linkage
CN202755656U (en) Split bolt fixing structure for double-layer steel plate shearing wall
CN102817890A (en) Fastener
CN204040453U (en) A kind of novel scaffold Tiebar structure for civil construction project
CN204001667U (en) A kind of novel scaffold Tiebar structure for civil construction project
CN204326677U (en) Novel power transmission power line steel tuble pole
CN204034785U (en) Roll squeezer reductor not damaged detaching structure
CN203961026U (en) The syndeton of a kind of crossbeam and post
CN204027773U (en) Tightness test frock
CN203879107U (en) Fence structure
CN202273964U (en) Pull ring connecting piece
CN203008497U (en) Fence convenient to install
CN206144581U (en) Forestope rings
CN204265232U (en) A kind of I-beam section uses stressed suspension rod
CN204370688U (en) Beam column of steel structure
CN204530672U (en) A kind of pipe of cement skeleton
CN204357353U (en) A kind of reaming bit
CN203547101U (en) Screw bolt tool type overhanging scaffold
CN204152195U (en) A kind of scaffold fastenings
CN203361326U (en) Main body framework for combined house
CN203397844U (en) Bell-type oil tank ground connection structure
CN203821638U (en) Assembly type steel structure wallboard joint
CN202273601U (en) Heat insulation collar
CN205677095U (en) Cross-beam connecting plate and square tube column connecting device
CN202266011U (en) Shear wall support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHAO JIEFENG

Effective date: 20141127

Owner name: LIN HUACHANG

Free format text: FORMER OWNER: CHEN ZHIYUN

Effective date: 20141127

Owner name: SHENZHEN HUAPENG ENGINEERING CONSTRUCTION CO., LTD

Free format text: FORMER OWNER: LIN HUACHANG

Effective date: 20141127

Free format text: FORMER OWNER: ZHAO JIEFENG

Effective date: 20141127

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518017 SHENZHEN, GUANGDONG PROVINCE TO: 518052 SHENZHEN, GUANGDONG PROVINCE

Free format text: CORRECT: ADDRESS; FROM: 315700 NINGBO, ZHEJIANG PROVINCE TO: 518017 SHENZHEN, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141127

Address after: 518052 TCL Science Park, No. 1001, Zhongshan Garden Road, Shenzhen, Guangdong, Nanshan District E1-5A-1

Patentee after: SHENZHEN HUAPENG ENGINEERING CONSTRUCTION Co.,Ltd.

Address before: Futian District Fuqiang Road, Shenzhen city Guangdong province 518017 No. 2215 Beijing court 8 Building 2B

Patentee before: Lin Huachang

Patentee before: Zhao Jiefeng

Effective date of registration: 20141127

Address after: Futian District Fuqiang Road, Shenzhen city Guangdong province 518017 No. 2215 Beijing court 8 Building 2B

Patentee after: Lin Huachang

Patentee after: Zhao Jiefeng

Address before: 315700 Xinfeng City, Ningbo province Dan Xiangshan City Road, No. 205,

Patentee before: Chen Zhiyun

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150725

EXPY Termination of patent right or utility model