CN204001477U - A kind of sets of brackets on top of the columns shape drainage plant - Google Patents

A kind of sets of brackets on top of the columns shape drainage plant Download PDF

Info

Publication number
CN204001477U
CN204001477U CN201420468523.4U CN201420468523U CN204001477U CN 204001477 U CN204001477 U CN 204001477U CN 201420468523 U CN201420468523 U CN 201420468523U CN 204001477 U CN204001477 U CN 204001477U
Authority
CN
China
Prior art keywords
gutter
elbow
bucket
drain
drain bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420468523.4U
Other languages
Chinese (zh)
Inventor
宿明彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI JINQIAN METAL CONSTRUCTION Co Ltd
Original Assignee
JIANGXI JINQIAN METAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI JINQIAN METAL CONSTRUCTION Co Ltd filed Critical JIANGXI JINQIAN METAL CONSTRUCTION Co Ltd
Priority to CN201420468523.4U priority Critical patent/CN204001477U/en
Application granted granted Critical
Publication of CN204001477U publication Critical patent/CN204001477U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a kind of sets of brackets on top of the columns shape drainage plant, comprise gutter, drain bucket, elbow, gutter and exhaust bucket, wherein drain bucket is divided into drain bucket one and drain bucket two, and two ends, gutter left and right are respectively provided with a cavity, and elbow is divided into elbow one, elbow two and elbow three; Drain bucket one is wherein connected with two cavitys of gutter respectively one end with drain bucket two, forms drain hole one and drain hole two; Drain bucket one is connected with gutter ventilation with elbow two by elbow one with drain bucket two other ends; Exhaust bucket is arranged at outside gutter, and one end, forms exhaust opening upward, and the other end is connected with gutter ventilation by elbow three.Adopt bucket domes, and be provided with exhaust opening, gutter air stream of jacking upwards when draining downwards, drainage efficiency is high.Total is used zinc-plated color steel to be pressed into rectangle, high-strength light, stressed safety, and zinc-plated color steel can be resisted multiple harsh weather, long service life.

Description

A kind of sets of brackets on top of the columns shape drainage plant
Technical field
The utility model belongs to building field, is specifically related to a kind of sets of brackets on top of the columns shape drainage plant.
Background technology
It is very general that leader is used in modern building, and very important; The structure of leader is not only related to the rain-water drainage problem of whole building, is also related to and whether can produces the impact of leaking to building.In present building, particularly in domestic building, mostly use the leader of plastic material, this pipe time one for a long time easily cracking produce and leak, and also cumbersome when installing, if install lack of standardizationly, Sometimes When It Rains also easily make house produce the problem of leaking.Outdoor leader is widely used in building construction, is connected to roof drain lower end and is mainly used in roof and rain water on roof and snowmelt to concentrate and cause in the rain pipe that ground and below ground lay.Leader material generally has metal pipe material and plastic pipe.Metal pipe material mainly contains cast iron pipe, color aluminum pipe, copper pipe etc.; Plastic pipe be take pvc pipe as main.Because metal pipe material easily gets rusty, pvc pipe cost is low and easily safeguard, good looking appearance, and what the leader of most was mainly selected is all pvc pipe.The leader of installing traditionally, end opening often can be because artificial damage, less than the replacement that just needs repairing of 1 year lower mouth of a river, and because under leader the mouth of a river conventionally and ground have certain distance, in the winter time, during the accumulated snow partial melting of leader inside, because the thawing accumulated snow of the lower leader sometimes of temperature inside can freeze again, ice in pipe is heavy to be there is leader fracture and damages because bearing to cause leader, need to repair, sometimes even need integral replacing leader, yet changing, leader generally needs work high above the ground, change and waste time and energy frequently, also cause unnecessary waste, increase maintenance cost.Although PVC downspout system is from heavy and light, be widely used, but there is poisonous additive and plasticizing agent in PVC-polyvinyl chloride, may ooze out or vaporize, incinerate PVC rubbish and can produce carcinogenic dioxin contamination atmosphere, and anti-aging and endurance deficiency is also a weakness.As everyone knows, industrial premises drainage system major function is divided into two kinds: outer drainage system and inner water drainage system.Outer drainage system is to utilize roof gutter directly by outdoor standpipe, rainwater to be discharged in outdoor rain waterpipe or surface water channel; Inner water drainage system is to utilize indoor storm sewer that rainwater is discharged in outdoor rain waterpipe.Existing function of drainage system is all achieved, but realize and imperfect, while particularly also having storm-water system impeded drainage or rainfall to surpass the recurrence interval in industrial premises, gutter very easily produces gas with gutter junction and blocks up phenomenon.
Utility model content
A kind of drainage efficiency that the utility model provides for above-mentioned weak point is high, durable in use and outward appearance is beautiful, high-strength light, installation are succinct, the sets of brackets on top of the columns shape drainage plant of environmental protection.
A sets of brackets on top of the columns shape drainage plant, comprises gutter, drain bucket, elbow, gutter and exhaust bucket, and wherein drain bucket is divided into drain bucket one and drain bucket two, and two ends, gutter left and right are respectively provided with a cavity, and elbow is divided into elbow one, elbow two and elbow three; Drain bucket one is wherein connected with two cavitys of gutter respectively one end with drain bucket two, forms drain hole one and drain hole two; Drain bucket one is connected with gutter ventilation with elbow two by elbow one with drain bucket two other ends; Exhaust bucket is arranged at outside gutter, and one end, forms exhaust opening upward, and the other end is connected with gutter ventilation by elbow three.Gutter is collected rain water on roof, then through drain bucket, elbow, gutter, is delivered to outdoor drainage system.
For making the utility model more be suitable for practicality, make further improvements below:
Described drain bucket, gutter and exhaust bucket all adopt zinc-plated color steel to be pressed into rectangle.
Described gutter and exterior wall carry out concealed fastening.
The beneficial effects of the utility model are:
The utility model adopts airflow design, and member is standard component, and simple installation, duration are short.Main member drain bucket, exhaust bucket and gutter all adopt zinc-plated color steel to be pressed into rectangle type, high-strength light, stressed safety, and zinc-plated color steel can be resisted multiple harsh weather, long service life.Wherein adopt bucket domes, be provided with exhaust opening, gutter air stream of jacking upwards when draining downwards, drainage efficiency is high.By roofing connector, can make gutter reliably be connected with roof panel.Zinc-plated color steel color is various, and gutter concealed fastening can be accomplished and build harmony, and atmosphere is attractive in appearance, reaches high efficiency draining and cost more excellent, builds the attractive in appearance and perfect realization of function.
Accompanying drawing explanation
Fig. 1 is the utility model front view.
Fig. 2 is the utility model top view.
Fig. 3 is the utility model A-A sectional view.
Fig. 4 is the utility model left view.
Reference numeral: 1-drain bucket one, 2-gutter, 3-drain bucket two, 4-elbow one, 5-exhaust bucket, 6-elbow two, 7-elbow three, 8-gutter, 9-drain hole one, 10-exhaust opening, 11-drain hole two.
The specific embodiment
A kind of sets of brackets on top of the columns shape drainage plant, comprise gutter 2, drain bucket, elbow, gutter 8 and exhaust bucket 5, wherein drain bucket is divided into drain bucket 1 and drain bucket 23, and gutter 2 two ends, left and right are respectively provided with a cavity, and elbow is divided into elbow 1, elbow 26 and elbow 37; Drain bucket 1 is wherein connected with two cavitys of gutter respectively one end with drain bucket 23, forms drain hole 1 and drain hole 2 11; Drain bucket 1 is connected with gutter 8 ventilations with elbow 26 by elbow 1 with drain bucket 23 other ends; Exhaust bucket 5 is arranged at outside gutter 2, and one end, forms exhaust opening 10 upward, and the other end is connected with gutter 8 ventilations by elbow 37.Gutter 2 is collected rain water on roof, then through drain bucket, elbow, gutter 8, is delivered to outdoor drainage system.Described drain bucket, gutter 8 and exhaust bucket 5 all adopt zinc-plated color steel to be pressed into rectangle.Described gutter 8 carries out concealed fastening with exterior wall.
In use, by roofing connector, gutter is connected on roof panel, gutter is carried out to concealed fastening.Wherein adopt bucket domes, be provided with exhaust opening, gutter air stream of jacking upwards when draining downwards, drainage efficiency is high.Total is used zinc-plated color steel to be pressed into rectangle, high-strength light, stressed safety, and zinc-plated color steel can be resisted multiple harsh weather, long service life.

Claims (3)

1. a sets of brackets on top of the columns shape drainage plant, comprise gutter (2), drain bucket, elbow, gutter (8) and exhaust bucket (5), wherein drain bucket is divided into drain bucket one (1) and drain bucket two (3), gutter (2) two ends, left and right are respectively provided with a cavity, and elbow is divided into elbow one (4), elbow two (6) and elbow three (7); Drain bucket one (1) is wherein connected with two cavitys of gutter respectively one end with drain bucket two (3), forms drain hole one (9) and drain hole two (11); Drain bucket one (1) is connected with gutter (8) ventilation with elbow two (6) by elbow one (4) with drain bucket two (3) other ends; Exhaust bucket (5) is arranged at outside gutter (2), and one end, forms exhaust opening (10) upward, and the other end is connected with gutter (8) ventilation by elbow three (7).
2. a kind of sets of brackets on top of the columns shape drainage plant as claimed in claim 1, is characterized in that: described drain bucket, gutter (8) and exhaust bucket (5) all adopt zinc-plated color steel to be pressed into rectangle.
3. a kind of sets of brackets on top of the columns shape drainage plant as claimed in claim 1, is characterized in that: described gutter (8) carries out concealed fastening with exterior wall.
CN201420468523.4U 2014-08-19 2014-08-19 A kind of sets of brackets on top of the columns shape drainage plant Expired - Fee Related CN204001477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420468523.4U CN204001477U (en) 2014-08-19 2014-08-19 A kind of sets of brackets on top of the columns shape drainage plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420468523.4U CN204001477U (en) 2014-08-19 2014-08-19 A kind of sets of brackets on top of the columns shape drainage plant

Publications (1)

Publication Number Publication Date
CN204001477U true CN204001477U (en) 2014-12-10

Family

ID=52041500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420468523.4U Expired - Fee Related CN204001477U (en) 2014-08-19 2014-08-19 A kind of sets of brackets on top of the columns shape drainage plant

Country Status (1)

Country Link
CN (1) CN204001477U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555436A (en) * 2017-01-13 2017-04-05 河南中和信建筑安装有限公司 Steel sets of brackets on top of the columns and steel archaized building structure
CN109930674A (en) * 2018-12-17 2019-06-25 苏宣维 Multi-functional fast guiding blockage prevention drainage device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555436A (en) * 2017-01-13 2017-04-05 河南中和信建筑安装有限公司 Steel sets of brackets on top of the columns and steel archaized building structure
CN109930674A (en) * 2018-12-17 2019-06-25 苏宣维 Multi-functional fast guiding blockage prevention drainage device

Similar Documents

Publication Publication Date Title
CN106718364B (en) Roof rainwater retention multi-arch structure and green roof intelligent irrigation system and method
CN202170602U (en) Siphoning type roof drainage system
CN204001477U (en) A kind of sets of brackets on top of the columns shape drainage plant
CN205369377U (en) Automatic abandon class, retaining, overflow integration rainwater collection system
CN205134781U (en) Slope escape canal system for roof drainage
CN101349042B (en) Automatic dust collection water storage street
CN202187490U (en) Skylight ventilator
CN205894523U (en) Roof drainage mouth waterproof insulation structure
CN209227739U (en) A kind of ground water permeable device based on sponge urban construction
CN202248587U (en) Cornice draining board
CN202157476U (en) Skylight
CN2823376Y (en) Movable water tank
CN202048633U (en) Protecting cover of air-conditioning outdoor unit
CN205046733U (en) Prevent deposition, prevent electronic daylighting ventilating skylight of formula of snowing
CN206070898U (en) The outer discharge structure of roof boarding
CN211923704U (en) Domatic roof truss structure factory building
CN202039512U (en) Electromagnet snow melt anti-freezing drain gully
CN205531037U (en) Take dismantlement formula to ally oneself with roof boarding of fighting with rainwater
CN209227912U (en) Waterproof overflows formula dormer gutter setting structure
CN215858668U (en) Waterproof mechanism of stainless steel gutter installation usefulness
CN220620763U (en) Novel rainwater riser in curtain wall
CN208473136U (en) A kind of movable plank house having ecological intercepting ditch structure
CN220978604U (en) Novel overflow pipe assembly applied to metal gutter
CN214575190U (en) Parapet isolated antiseep gutter system
CN217268404U (en) Greenhouse gutter drainage device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150819

EXPY Termination of patent right or utility model