CN203961364U - Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction - Google Patents

Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction Download PDF

Info

Publication number
CN203961364U
CN203961364U CN201420316771.7U CN201420316771U CN203961364U CN 203961364 U CN203961364 U CN 203961364U CN 201420316771 U CN201420316771 U CN 201420316771U CN 203961364 U CN203961364 U CN 203961364U
Authority
CN
China
Prior art keywords
cavern
hole
props
combination
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420316771.7U
Other languages
Chinese (zh)
Inventor
苏利军
刘百兴
刘立新
杨学红
李锋
华夏
朱学贤
韩前龙
潘霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201420316771.7U priority Critical patent/CN203961364U/en
Application granted granted Critical
Publication of CN203961364U publication Critical patent/CN203961364U/en
Priority to JP2017517168A priority patent/JP6280291B2/en
Priority to RU2017100928A priority patent/RU2649193C1/en
Priority to PCT/CN2015/079885 priority patent/WO2015188695A1/en
Priority to US15/376,634 priority patent/US10094217B2/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of underground nuclear power station combination cavity group along the Construction Arrangement of massif depth direction, comprise reactor building cavern, two combination caverns, Liang Ge electrical building cavern, Liang Ge release cavern, the first main access tunnel, the second main access tunnel and the 3rd main access tunnel, the first main access tunnel, the second main access tunnel and the 3rd main access tunnel all communicate with earth's surface, reactor building cavern, combination cavern, electrical building cavern and release cavern form nuclear island factory building cavity group, the crown arch springing of each cavern of nuclear island factory building cavity group or crown headwall prop up hole system by top layer and communicate with earth's surface, at the bottom of the abutment wall wall of each cavern of nuclear island factory building cavity group, by bottom, prop up hole system and the first main access tunnel, the second main access tunnel is connected with the 3rd main access tunnel.The utlity model has that mileage is short, safety good, easy construction, reduced investment, feature that the degree of modularity is high, can be widely used in nuclear power engineering technical field.

Description

Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction
Technical field
The utility model relates to nuclear power engineering technical field, particularly relates to a kind of underground nuclear power station combination cavity group along the Construction Arrangement of massif depth direction.
Background technology
China proposes will accelerate to advance Construction of Nuclear Electricity in " 12 " ENERGY PLANNING.Yet under the impact of Fukushima, Japan nuclear accident, the global nuclear industry of just walking out from the shade of Chernobyl has been absorbed in again low ebb.In view of this, country is more strict and prudent to examining of nuclear power projects, and the safety requirements of nuclear power plant has also been mentioned to higher status.For this situation, ground nuclear power station is all or part of is placed in underground nucleus power station arrangement provides new thinking for nuclear power developing.
With regard to underground hole group, Underground Hydro-electric Power Station group is more common, and the project scale of the project scale of underground nuclear power station cavity group and water power underground power house cavity group is also substantially suitable.But with the comparison of Underground Hydro-electric Power Station faciation, the permanent passage that can provide utilization is few, and it is high that massif part hollows out rate, and nuclear power engineering is high to modular requirement degree, therefore the layout in a construction hole is subject to more restriction.
If the layout of construction drift of underground nuclear power station cavity group is improper, easily affect main cavern stability and safety, cause construction inconvenience simultaneously, cause construction delay and increase of investment.
Utility model content
The purpose of this utility model is in order to overcome the deficiency of above-mentioned background technology, and the Construction Arrangement of a kind of underground nuclear power station combination cavity group along massif depth direction is provided, and has that mileage is short, safety good, easy construction, reduced investment, a feature that the degree of modularity is high.
A kind of underground nuclear power station combination cavity group that the utility model provides is along the Construction Arrangement of massif depth direction, comprise the reactor building cavern that two axis lines are vertical with massif depth direction, each reactor building cavern one side is provided with the combination cavern arranging along massif depth direction, each reactor building cavern is respectively equipped with electrical building cavern and release cavern perpendicular to the both sides of massif depth direction, each electrical building cavern arranges perpendicular to massif depth direction, the outside of two combination caverns is respectively equipped with the first main access tunnel and the 3rd main access tunnel of arranging along massif depth direction, between two combination caverns, be provided with the second main access tunnel of arranging along massif depth direction, described the first main access tunnel, the second main access tunnel and the 3rd Jun Yu earth's surface, main access tunnel one end communicate, described reactor building cavern, combination cavern, electrical building cavern and release cavern form nuclear island factory building cavity group, the crown arch springing of each cavern of described nuclear island factory building cavity group or crown headwall prop up hole system by the top layer for constructing and communicate with earth's surface, at the bottom of the abutment wall of each cavern of described nuclear island factory building cavity group or headwall wall, by the bottom as slag releasing channel, prop up hole system and the first main access tunnel, the second main access tunnel is connected with the 3rd main access tunnel.
In technique scheme, described top layer props up hole system and comprises first main hole, the first reactor building cavern top layer props up hole, the second reactor building cavern top layer props up hole, second main hole, the 3rd main hole, the first combination end, cavern top layer props up hole, electrical building top layer props up hole, combination stage casing, cavern top layer props up hole, the first release hole top layer props up hole and the second release hole top layer props up hole, described first main hole, second main hole and the 3rd main hole are all arranged along massif depth direction, and all communicate with earth's surface, the elevation in described first main hole is higher than the elevation in second main hole and the 3rd main hole, described first main hole propped up hole by the first reactor building cavern top layer and is connected with the crown arch springing that the second reactor building cavern top layer props up difference Yu Liangge reactor building cavern, hole, the one end in described second main hole and the 3rd main hole is connected with the crown headwall of corresponding one end, combination cavern respectively, described second main stage casing, hole propped up hole by one first combination end, cavern top layer and is connected with the crown headwall of one of them combination cavern other end, the described the 3rd main stage casing, hole propped up hole by another the first combination end, cavern top layer and is connected with the crown headwall of another combination cavern other end, the stage casing that each first combination end, cavern top layer props up hole is connected by the crown headwall of one end, an electrical building top layer Zhi Dongyu electrical building cavern, the stage casing in described second main hole is propped up hole by combination stage casing, a cavern top layer and is connected with the crown arch springing in one of them combination stage casing, cavern, the stage casing in the described the 3rd main hole is propped up hole by another combination stage casing, cavern top layer and is connected with the crown arch springing in another combination stage casing, cavern, the stage casing in described the 3rd main hole and end are respectively equipped with the first release hole top layer and prop up hole and prop up hole with the second release hole top layer and be connected with corresponding release cavern crown arch springing.
In technique scheme, described top layer props up in the system of hole each top layer and props up hole longitudinal gradient and be all less than 12%.
In technique scheme, described bottom props up hole system and comprises that reactor building cavern bottom props up hole, the first combination end, cavern bottom props up hole, electrical building bottom props up hole, the second combination end, cavern bottom props up hole and release hole bottom props up hole, described the second main access tunnel props up hole by Yi Ge reactor building cavern bottom and is connected with the bottom that a release hole bottom props up the He Yige release cavern, abutment wall bottom of difference Yu Yige reactor building cavern, hole, described the 3rd main access tunnel props up hole and another release hole bottom by another reactor building cavern bottom and props up hole and be connected with the bottom of another release cavern with the abutment wall bottom of another reactor building cavern respectively, described the first main access tunnel props up hole by one first combination end, cavern bottom and is connected with at the bottom of combination one end, cavern headwall wall, described the second main access tunnel props up hole by another the first combination end, cavern bottom and is connected with at the bottom of another combination one end, cavern headwall wall, each first combination end, cavern bottom props up hole and by connected electrical building bottom, props up hole and be connected with at the bottom of corresponding electrical building cavern headwall wall, the other end of described the second main access tunnel props up hole by one second combination end, cavern bottom and is connected with at the bottom of a combination cavern other end abutment wall wall, the other end of described the 3rd main access tunnel props up hole by another the second combination end, cavern bottom and is connected with at the bottom of another combination cavern other end abutment wall wall.
In technique scheme, described bottom props up in the system of hole each bottom and props up hole longitudinal gradient and be all less than 12%.
In technique scheme, described each combination cavern comprises the first safe factory building cavern, nuclear fuel factory building cavern, the second safe factory building cavern and the nuclear auxiliary building cavern longitudinally connecting successively, described the first combination end, cavern bottom props up hole and is connected with at the bottom of the first safe factory building cavern headwall wall, at the bottom of the second combination bottom Zhi Dongyu nuclear auxiliary building cavern, end, cavern abutment wall wall, is connected; The one end in described second main hole and the 3rd main hole is connected with the crown arch springing of corresponding outer face, nuclear auxiliary building cavern respectively, described the first combination end, cavern top layer props up hole and is connected with the crown arch springing of the first outer face, safe factory building cavern, and described combination cavern stage casing top layer props up hole and is connected with the crown arch springing of the second safe factory building cavern.
In technique scheme, between the electrical building cavern corresponding with it, each reactor building cavern, by the main steam passage being connected with earth's surface, be connected, Liang Ge reactor building cavern is equipped with corresponding device channels and communicates with earth's surface.
The utility model underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction, there is following beneficial effect: the bottom that the main access tunnel of make full use of ± 0m of the utility model elevation arranges each factory building cavern props up hole as slag releasing channel, and from mountain, separately establish towards the top layer of each factory building cavern and prop up hole as construction passage, each factory building cavern can be minimum construction passage by drop shaft method organizing construction (so-called drop shaft method be on excavation area between lower channel vertical setting slip slag well, passage is as construction passage above, the dregs that produce in construction enter passage below and transport construction site by slipping slag well).So each factory building cavern all only establishes top layer and bottom two-layer hole altogether.Described top layer props up hole system and passes to each factory building crown.Described bottom props up at the bottom of hole system passes to each factory building wall.Because differing, the end elevation of release cavern and main access tunnel elevation reach 20m, be difficult to arrange that the bottom of suitable longitudinal gradient props up hole, therefore prop up the first level in hole with release hole bottom, pass to axis place, release cavern, then by establishing to slip bottom slag vertical shaft and release cavern, be connected in work progress.
The combination cavern, reactor building cavern, electrical building cavern and the release cavern that by nuclear auxiliary building cavern, the second safe factory building cavern, nuclear fuel factory building cavern and the first safe factory building cavern, are linked to be, the bottom of its bottom setting props up hole and draws by main access tunnel.The combination cavern, electrical building cavern and the release cavern that by nuclear auxiliary building cavern, the second safe factory building cavern, nuclear fuel factory building cavern and the first safe factory building cavern, are linked to be, the top layer of its top layer setting props up hole and draws by second main hole, the 3rd main hole and the 4th main hole.
The crown of described reactor building cavern is the highest, on facade and in plane, all cannot share construction passage with other caverns, therefore establish separately first main hole, then fork is drawn Liang Tiao reactor building cavern top layer and is propped up the arch springing elevation place that hole passes to respectively Liang Ge reactor building cavern.
It is minimum that the utility model is pressed the construction passage that drop shaft method construction arranges, and has advantages of that mileage is short, safety good, easy construction, reduced investment, the degree of modularity be high, met the general requirement of construction.
Accompanying drawing explanation
Fig. 1 is that the utility model underground nuclear power station combination cavity group is along propping up to bottom the structural representation that hole system is relevant in the Construction Arrangement of massif depth direction;
Fig. 2 is that the utility model underground nuclear power station combination cavity group props up the structural representation of hole system along combining cavern, electrical building cavern and release cavern and relevant top layer thereof in the Construction Arrangement of massif depth direction;
Fig. 3 is that the utility model underground nuclear power station combination cavity group props up the structural representation of hole system along reactor building cavern in the Construction Arrangement of massif depth direction and relevant top layer thereof.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail, but this embodiment should not be construed as restriction of the present utility model.
Referring to Fig. 1 to Fig. 3, the utility model underground nuclear power station combination cavity group, along the Construction Arrangement of massif depth direction, comprises that reactor building cavern 1, combination cavern, electrical building cavern 2, main access tunnel the 9, the 3rd main access tunnel 10 of the main access tunnel 8, second in release cavern 7, first, top layer prop up hole system, bottom props up hole system, main steam passage 11, device channels 12, access tunnel 13 and side access tunnel 14.
Described reactor building cavern 1 is two, and the axis line of Liang Ge reactor building cavern 1 is vertical with massif depth direction.Each reactor building cavern 1 one side is provided with the combination cavern arranging along massif depth direction, each reactor building cavern 1 is respectively equipped with electrical building cavern 2 and release cavern 7 perpendicular to the both sides of massif depth direction, each electrical building cavern 2 arranges perpendicular to massif depth direction, the outside of two combination caverns is respectively equipped with the first main access tunnel 8 and the 3rd main access tunnel 10 of arranging along massif depth direction, between two combination caverns, be provided with the second main access tunnel 9 of arranging along massif depth direction, described the first main access tunnel 8, the second main access tunnel 9 and the 3rd main access tunnel 10 Jun Yu earth's surfaces, one end communicate, described reactor building cavern 1, combination cavern, electrical building cavern 2 and release cavern 7 form nuclear island factory building cavity group, the crown arch springing of each cavern of described nuclear island factory building cavity group or headwall prop up hole system by the top layer for constructing and communicate with earth's surface, at the bottom of the abutment wall of each cavern of described nuclear island factory building cavity group or headwall wall, by the bottom as slag releasing channel, prop up hole system and the first main access tunnel 8, the second main access tunnel 9 is connected with the 3rd main access tunnel 10.
Described each combination cavern comprises the first safe factory building cavern 3, the 4, second safe factory building cavern 5 and the nuclear auxiliary building cavern 6, nuclear fuel factory building cavern longitudinally connecting successively.
Described top layer props up hole system and comprises first main hole 41, the first reactor building cavern top layer props up hole 42, the second reactor building cavern top layer props up hole 43, second main hole 31, the 3rd main hole 32, the first combination end, cavern top layer props up hole 33, electrical building top layer props up hole 34, combination stage casing, cavern top layer props up hole 35, the first release hole top layer props up hole 36 and the second release hole top layer props up hole 37, described first main hole 41, second main hole 31 and the 3rd main hole 32 are all arranged along massif depth direction, and all communicate with earth's surface, the elevation in described first main hole 41 is higher than the elevation in second main hole 31 and the 3rd main hole 32, described first main hole 41 propped up hole 42 by the first reactor building cavern top layer and is connected with the crown arch springing that the second reactor building cavern top layer props up 43 difference Yu Liangge reactor building caverns 1, hole, the one end in described second main hole 31 and the 3rd main hole 32 is connected with the crown headwall of corresponding 6 outer faces, nuclear auxiliary building cavern respectively, described second main 31 stage casing, hole propped up hole 33 by one first combination end, cavern top layer and is connected with the crown headwall of 3 outer faces, a first safe factory building cavern, the described the 3rd main 32 stage casings, hole are propped up hole 33 by another the first combination end, cavern top layer and are connected with the crown headwall of another 3 outer faces, the first safe factory building cavern, the stage casing that each first combination end, cavern top layer props up hole 33 is connected by the crown headwall of 2 one end, an electrical building top layer Zhi Dong34Yu electrical building cavern, the stage casing in described second main hole 31 is propped up hole 35 by combination stage casing, a cavern top layer and is connected with the crown arch springing of a second safe factory building cavern 5, the stage casing in the described the 3rd main hole 32 is propped up hole 35 by another combination stage casing, cavern top layer and is connected with the crown arch springing of another the second safe factory building cavern 5, the stage casing in described the 3rd main hole 32 and end are respectively equipped with the first release hole top layer and prop up hole 36 and prop up hole 37 with the second release hole top layer and be connected with corresponding release cavern 7 crown arch springings.Described top layer props up in the system of hole each top layer and props up hole longitudinal gradient and be all less than 12%, to meet trackless movement requirement.
Described bottom props up hole system and comprises that reactor building cavern bottom props up hole 21, the first combination end, cavern bottom props up hole 22, electrical building bottom props up hole 23, the second combination end, cavern bottom props up hole 24 and release hole bottom props up hole 25, described the second main access tunnel 9 props up hole 21 by Yi Ge reactor building cavern bottom and is connected with the bottom that a release hole bottom props up the He Yige release cavern 7, abutment wall bottom of 25 difference Yu Yige reactor building caverns 1, hole, described the 3rd main access tunnel 10 props up hole 21 and another release hole bottom by another reactor building cavern bottom and props up hole 25 and be connected with the bottom of another release cavern 7 with the abutment wall bottom of another reactor building cavern 1 respectively, described the first main access tunnel 8 props up hole 22 by one first combination end, cavern bottom and is connected with at the bottom of first safe factory building cavern 3 headwall walls, described the second main access tunnel 9 props up hole 22 by another the first combination end, cavern bottom and is connected with at the bottom of another the first safe factory building cavern 3 headwall walls, each first combination end, cavern bottom props up hole 22 and by connected electrical building bottom, props up hole 23 and be connected with at the bottom of corresponding electrical building cavern 2 headwall walls, the other end of described the second main access tunnel 9 is connected at the bottom of propping up 24Yu Yige nuclear auxiliary building cavern, hole 6 abutment wall walls by one second combination end, cavern bottom, the other end of described the 3rd main access tunnel 10 props up hole 24 by another the second combination end, cavern bottom and is connected with at the bottom of another nuclear auxiliary building cavern 6 abutment wall walls.Described bottom props up in the system of hole each bottom and props up hole longitudinal gradient and be all less than 12%, to meet trackless movement requirement.
Between the electrical building cavern 2 corresponding with it, each reactor building cavern 1, by the main steam passage 11 being connected with earth's surface, be connected, Liang Ge reactor building cavern 1 is equipped with corresponding device channels 12 and communicates with earth's surface.Described main steam passage 11 and device channels 12 all can be used as construction passage.
The underground nuclear power station of the present embodiment adopts two heap CUP600 to arrange, adopts drop shaft method to organize underground power house cavern excavation, from top work plane tissue, excavates, and slips slag slag tap from bottom work plane tissue by the well of slagging tap.Construction passage that can be minimum by drop shaft method organizing construction meets construction requirement, therefore each factory building cavern of the utility model only need arrange two-layer hole system of top layer and bottom: bottom props up hole can make full use of the existing permanent passage first main access tunnel 9 of main access tunnel 8, second and the 3rd main access tunnel 10 fork layouts; Top layer props up hole and can arrange by first main hole 41, second main hole 31 and the 3rd main hole 32 forks, and this is conducive to reduce the construction works amount in a hole.Bottom props up hole system and top layer and props up hole system and all keep suitable spacing with cavern around, to guarantee cavity group stability and safety.The hole of excavation is few, mileage is short, and investment just economizes, and props up that hole is few, mileage is short, spacing is suitable simultaneously, and the safety of whole engineering also can be better; Because two heap CUP600 underground nuclear power stations layout nuclear island factory building cavity groups have been accomplished modularized design, therefore the design and construction of the utility model structure can be accomplished modularization.Specifically be implemented as follows:
Due to the first main access tunnel 8 as permanent passage, the second main access tunnel 9 and the 3rd main access tunnel 10 and can be as be arranged in ± 0m of main steam passage 11 elevation of passage, at the bottom of Er Ge factory building cavern, elevation all has the larger discrepancy in elevation therewith: such as 1 end of reactor building cavern elevation is-9.0m, at the bottom of combination cavern, elevation is-12.5m, 2 end of electrical building cavern elevation is-12.5m, at the bottom of release cavern, elevation is+20.0m, so all can not directly utilize the first main access tunnel 8 as permanent passage on plane and facade, the second main access tunnel 9 and the 3rd main access tunnel 10 and can be as the main steam passage 11 of passage.For meeting the requirement of slagging tap of the excavation of bottom, each cavern, need to arrange bottom, bottom Zhi Dongzhige cavern; Simultaneously, for reducing massif, hollow out rate, reduce to affect the stable unfavorable factor in each cavern, and reduce bottom and prop up hole engineering cost, do not establish separately bottom master and prop up hole, but make full use of permanent passage, by the first main access tunnel 9 of main access tunnel 8, second and the 3rd main access tunnel 10 forks, draw and arrange that each bottom props up hole 21,22,23,24 and 25 and passes to elevation place at the bottom of each cavern.Wherein, because differing, the end elevation of release cavern 7 and main access tunnel elevation reach 20m, be difficult to arrange that the bottom of suitable longitudinal gradient props up hole, therefore prop up the first level in hole 25 with release hole bottom, pass to 7 axis places, release cavern, then by establishing, slip slag vertical shaft and be connected with 7 bottoms, release cavern in work progress.Each bottom props up hole longitudinal gradient and is all less than 12% above, meets trackless movement requirement.
Because each factory building cavern crest level is higher and height differs: such as reactor building cavern 1 crest level is+78.0m, combination cavern crest level is+57.85m, electrical building cavern 2 crest levels are+46.8m, release cavern crest level is+62.0m, so all can not utilize the permanent passage first main access tunnel 9 of main access tunnel 8, second and the 3rd main access tunnel 10 on plane and facade, the elevation of device channels 12 is+20.0m in addition, the discrepancy in elevation of Yu Ge cavern is excessive, therefore need to separately establish top layer, props up hole to each factory building crown arch springing or crown headwall.Because reactor building cavern 1 crown is the highest, on facade and in plane, all cannot share construction passage with other caverns, therefore establish separately first main hole 41, then fork is drawn the first reactor building cavern top layer and is propped up hole 42 and the second reactor building cavern top layer and prop up hole 43 and pass to respectively the crown arch springing place that corresponding reactor building cavern 1 elevation is+65.0m.Though combination cavern, electrical building cavern 2, release cavern 7 crest levels differences, but the discrepancy in elevation on facade is less, Ci San class cavern shares second main hole 31, the 3rd main hole 32, by two masters, prop up hole fork and establish the first combination cavern end top layer and prop up hole 33, electrical building top layer and prop up that hole 35 is propped up in hole 34, combination stage casing, cavern top layer, the first release hole top layer props up hole 36 and the second release hole top layer props up hole 37, above these top layers prop up hole and all pass to each arch springing elevation place, cavern.Wherein, from second main hole 31 and the 3rd main hole 32, pass to the combination cavern crown headwall that elevation is+48.0m; From the first combination cavern end top layer, propping up hole 33 fork establishes electrical building top layer and props up hole 34 and pass to respectively the crown headwall that electrical building cavern 2 elevations are+37.0m; From the 3rd main hole 32 forks, establishing respectively the first release hole top layer props up hole 36 and the second release hole top layer and props up hole 37 and pass to the crown arch springing that Liang Ge release cavern 7 elevations are+52.0m.Due to combination, cavern comprises four factory buildings, axis is longer, therefore arranged that especially second main hole 31, the 3rd main hole 32, the first combination end, cavern top layer prop up hole 33, combination stage casing, cavern top layer and prop up hole 35 and the first combination end, cavern bottom and prop up hole 22, second and combine end, cavern bottom and prop up hole 24, to increase work plane, the balance duration, and be beneficial to crown quick supporting to guarantee crown construction period stability and safety.Wherein each top layer props up hole longitudinal gradient and is all less than 12%, meets trackless movement requirement.
Obviously, those skilled in the art can carry out various changes and modification and not depart from spirit and scope of the present utility model the utility model.Like this, if within of the present utility model these are revised and modification belongs to the scope of the utility model claim and equivalent technologies thereof, the utility model is also intended to comprise these changes and modification interior.
The content not being described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.

Claims (7)

1. a underground nuclear power station combines cavity group along the Construction Arrangement of massif depth direction, it is characterized in that: comprise the reactor building cavern (1) that two axis lines are vertical with massif depth direction, each reactor building cavern (1) one side is provided with the combination cavern arranging along massif depth direction, each reactor building cavern (1) is respectively equipped with electrical building cavern (2) and release cavern (7) perpendicular to the both sides of massif depth direction, each electrical building cavern (2) arranges perpendicular to massif depth direction, the outside of two combination caverns is respectively equipped with the first main access tunnel (8) and the 3rd main access tunnel (10) of arranging along massif depth direction, between two combination caverns, be provided with the second main access tunnel (9) of arranging along massif depth direction, described the first main access tunnel (8), the second main access tunnel (9) and the 3rd Jun Yu earth's surface, main access tunnel (10) one end communicate, described reactor building cavern (1), combination cavern, electrical building cavern (2) and release cavern (7) form nuclear island factory building cavity group, the crown arch springing of each cavern of described nuclear island factory building cavity group or crown headwall prop up hole system by the top layer for constructing and communicate with earth's surface, at the bottom of the abutment wall of each cavern of described nuclear island factory building cavity group or headwall wall, by the bottom as slag releasing channel, prop up hole system and the first main access tunnel (8), the second main access tunnel (9) is connected with the 3rd main access tunnel (10).
2. underground nuclear power station combination cavity group according to claim 1 is along the Construction Arrangement of massif depth direction, it is characterized in that: described top layer props up hole system and comprises first main hole (41), the first reactor building cavern top layer props up hole (42), the second reactor building cavern top layer props up hole (43), second main hole (31), the 3rd main hole (32), the first combination end, cavern top layer props up hole (33), electrical building top layer props up hole (34), combination stage casing, cavern top layer props up hole (35), the first release hole top layer props up hole (36) and the second release hole top layer props up hole (37), described first main hole (41), second main hole (31) and the 3rd main hole (32) are all arranged along massif depth direction, and all communicate with earth's surface, the elevation in described first main hole (41) is higher than the elevation in second main hole (31) and the 3rd main hole (32), described first main hole (41) propped up hole (42) by the first reactor building cavern top layer and is connected with the crown arch springing that the second reactor building cavern top layer props up difference Yu Liangge reactor building cavern, hole (43) (1), the one end in described second main hole (31) and the 3rd main hole (32) is connected with the crown headwall of corresponding one end, combination cavern respectively, described second main stage casing, hole (31) propped up hole (33) by one first combination end, cavern top layer and is connected with the crown headwall of one of them combination cavern other end, the described the 3rd main stage casing, hole (32) propped up hole (33) by another the first combination end, cavern top layer and is connected with the crown headwall of another combination cavern other end, the stage casing that each first combination end, cavern top layer props up hole (33) is propped up hole (34) by an electrical building top layer and is connected with the crown headwall of one end, electrical building cavern (2), the stage casing in described second main hole (31) is propped up hole (35) by combination stage casing, a cavern top layer and is connected with the crown arch springing in one of them combination stage casing, cavern, the stage casing in the described the 3rd main hole (32) is propped up hole (35) by another combination stage casing, cavern top layer and is connected with the crown arch springing in another combination stage casing, cavern, the stage casing in described the 3rd main hole (32) and end are respectively equipped with the first release hole top layer and prop up hole (36) and prop up hole (37) with the second release hole top layer and be connected with corresponding release cavern (7) crown arch springing.
3. underground nuclear power station according to claim 2 combination cavity group, along the Construction Arrangement of massif depth direction, is characterized in that: described top layer props up in the system of hole each top layer and props up hole longitudinal gradient and be all less than 12%.
4. underground nuclear power station combination cavity group according to claim 2 is along the Construction Arrangement of massif depth direction, it is characterized in that: described bottom props up hole system and comprises that reactor building cavern bottom props up hole (21), the first combination end, cavern bottom props up hole (22), electrical building bottom props up hole (23), the second combination end, cavern bottom props up hole (24) and release hole bottom props up hole (25), described the second main access tunnel (9) props up hole (21) by Yi Ge reactor building cavern bottom and is connected with the bottom that a release hole bottom props up the abutment wall He Yige release cavern, bottom (7) of difference Yu Yige reactor building cavern, hole (25) (1), described the 3rd main access tunnel (10) props up hole (21) and another release hole bottom by another reactor building cavern bottom and props up hole (25) and be connected with the bottom of another release cavern (7) with the abutment wall bottom of another reactor building cavern (1) respectively, described the first main access tunnel (8) props up hole (22) by one first combination end, cavern bottom and is connected with at the bottom of combination one end, cavern headwall wall, described the second main access tunnel (9) props up hole (22) by another the first combination end, cavern bottom and is connected with at the bottom of another combination one end, cavern headwall wall, each first combination end, cavern bottom props up hole (22) and props up hole (23) with connected at the bottom of corresponding electrical building cavern (2) headwall wall by connected electrical building bottom, the other end of described the second main access tunnel (9) props up hole (24) by one second combination end, cavern bottom and is connected with at the bottom of a combination cavern other end abutment wall wall, the other end of described the 3rd main access tunnel (10) props up hole (24) by another the second combination end, cavern bottom and is connected with at the bottom of another combination cavern other end abutment wall wall.
5. underground nuclear power station according to claim 4 combination cavity group, along the Construction Arrangement of massif depth direction, is characterized in that: described bottom props up in the system of hole each bottom and props up hole longitudinal gradient and be all less than 12%.
6. underground nuclear power station combination cavity group according to claim 4 is along the Construction Arrangement of massif depth direction, it is characterized in that: described each combination cavern comprises successively the first safe factory building cavern (3) of longitudinally connecting, nuclear fuel factory building cavern (4), the second safe factory building cavern (5) and nuclear auxiliary building cavern (6), described the first combination end, cavern bottom props up hole (22) and is connected with at the bottom of the first safe factory building cavern (3) headwall wall, and the second combination end, cavern bottom props up hole (24) and is connected with at the bottom of nuclear auxiliary building cavern (6) abutment wall wall; The one end in described second main hole (31) and the 3rd main hole (32) is connected with the crown headwall of corresponding outer face, nuclear auxiliary building cavern (6) respectively, described the first combination end, cavern top layer props up hole (33) and is connected with the crown headwall of the first outer face, safe factory building cavern (3), and described combination cavern stage casing top layer props up hole (35) and is connected with the crown arch springing of the second safe factory building cavern (5).
7. according to the underground nuclear power station described in any one in claim 1 to 6, combine cavity group along the Construction Arrangement of massif depth direction, it is characterized in that: between the electrical building cavern (2) corresponding with it, each reactor building cavern (1), by the main steam passage (11) being connected with earth's surface, be connected, Liang Ge reactor building cavern (1) is equipped with corresponding device channels (12) and communicates with earth's surface.
CN201420316771.7U 2014-06-13 2014-06-13 Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction Withdrawn - After Issue CN203961364U (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201420316771.7U CN203961364U (en) 2014-06-13 2014-06-13 Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction
JP2017517168A JP6280291B2 (en) 2014-06-13 2015-05-27 Construction layout of underground nuclear power plant coupling cavity group in vertical direction of mountain
RU2017100928A RU2649193C1 (en) 2014-06-13 2015-05-27 Construction diagram of united group of underground nuclear power plant productions in direction of mountains depth
PCT/CN2015/079885 WO2015188695A1 (en) 2014-06-13 2015-05-27 Construction layout of combined cavern group of underground nuclear power plant in depth direction of mountain
US15/376,634 US10094217B2 (en) 2014-06-13 2016-12-12 Construction layout for caverns of underground nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420316771.7U CN203961364U (en) 2014-06-13 2014-06-13 Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction

Publications (1)

Publication Number Publication Date
CN203961364U true CN203961364U (en) 2014-11-26

Family

ID=51921965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420316771.7U Withdrawn - After Issue CN203961364U (en) 2014-06-13 2014-06-13 Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction

Country Status (1)

Country Link
CN (1) CN203961364U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060858A (en) * 2014-06-13 2014-09-24 长江勘测规划设计研究有限责任公司 Construction layout of underground nuclear power station combination grotto group along depth direction of mountain body
WO2015188695A1 (en) * 2014-06-13 2015-12-17 长江勘测规划设计研究有限责任公司 Construction layout of combined cavern group of underground nuclear power plant in depth direction of mountain

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060858A (en) * 2014-06-13 2014-09-24 长江勘测规划设计研究有限责任公司 Construction layout of underground nuclear power station combination grotto group along depth direction of mountain body
WO2015188695A1 (en) * 2014-06-13 2015-12-17 长江勘测规划设计研究有限责任公司 Construction layout of combined cavern group of underground nuclear power plant in depth direction of mountain

Similar Documents

Publication Publication Date Title
CN203961365U (en) Underground nuclear power station nuclear island factory building underground hole group is perpendicular to the Construction Arrangement of massif depth direction
CN104047448B (en) Annular-structure construction layout for underground nuclear power station nuclear island cavern group
CN104060859B (en) Construction layout of underground nuclear power station nuclear island workshop underground grotto group vertical to depth direction of mountain body
CN102322071A (en) Universal base structure of main transformer of 220kV substation
WO2015188696A1 (en) Circular construction layout of underground nuclear power station nuclear island cavern group
CN203961364U (en) Underground nuclear power station combination cavity group is along the Construction Arrangement of massif depth direction
CN103147461B (en) A kind of pipe gallery and control centre's connecting joint structure
WO2015188693A1 (en) Construction layout of underground nuclear power station nuclear island plant underground cavern group being perpendicular to mountain depth direction
CN203961366U (en) The underground nuclear power station nuclear island cavity group Construction Arrangement of structure ringwise
CN103573011A (en) Device and method for constructing assembled crossing frame
CN104060858B (en) Construction layout of underground nuclear power station combination grotto group along depth direction of mountain body
CN102913249A (en) Inclined shaft transverse-through positive hole single horn lifting construction method
CN104051037A (en) Terrace embedded type underground nuclear power station
CN203296026U (en) Air exhausting device for locked and plugged diversion tunnel
CN104064235A (en) Slope type horizontally-buried underground nuclear power station
CN203966581U (en) The flat type underground nuclear power station that buries of slope formula
CN103362290B (en) Shaft with combined arrangement of underground powerhouse cable line outgoing system and air exhausting system
WO2015188695A1 (en) Construction layout of combined cavern group of underground nuclear power plant in depth direction of mountain
CN205066768U (en) Artifical observation pier who surveys deformation of water and electricity building surface
CN204608810U (en) For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering
CN203270529U (en) Adit blocking structure for pressure tunnel construction
CN205742264U (en) A kind of subway gateway goes out ground surface platform ruggedized construction
CN202164623U (en) Universal foundation structure of 220 kV transformer substation main transformer
CN103397649A (en) Double-wall steel cofferdam construction multifunctional platform and construction method thereof
CN203393982U (en) Vertical shaft adopting underground powerhouse cable outlet and air exhausting system which are arranged combinedly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141126

Effective date of abandoning: 20150506

RGAV Abandon patent right to avoid regrant