CN203960028U - Glass electric furnace - Google Patents

Glass electric furnace Download PDF

Info

Publication number
CN203960028U
CN203960028U CN201420357286.4U CN201420357286U CN203960028U CN 203960028 U CN203960028 U CN 203960028U CN 201420357286 U CN201420357286 U CN 201420357286U CN 203960028 U CN203960028 U CN 203960028U
Authority
CN
China
Prior art keywords
hole
settling pond
electric furnace
melting pool
glass electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420357286.4U
Other languages
Chinese (zh)
Inventor
秦刚
秦小平
姜小元
杨再军
邓木春
李蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN YIMING MICROCRYSTALLINE TECHNOLOGY Co Ltd
Original Assignee
SICHUAN YIMING MICROCRYSTALLINE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN YIMING MICROCRYSTALLINE TECHNOLOGY Co Ltd filed Critical SICHUAN YIMING MICROCRYSTALLINE TECHNOLOGY Co Ltd
Priority to CN201420357286.4U priority Critical patent/CN203960028U/en
Application granted granted Critical
Publication of CN203960028U publication Critical patent/CN203960028U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a kind of glass electric furnace, it comprises charging opening (1), heating unit hole (2), thermocouple hole (3), melting pool (4), settling pond (5), electrode hole (6), dog-hole (7), lower weif orifice (8) and upper drain hole (9), described charging opening (1) is connected with melting pool (4), described melting pool (4) is connected with settling pond (5) by dog-hole (7), described settling pond (5) bottom is connected with lower weif orifice (8), described settling pond (5) middle part of stating is connected with upper drain hole (9), top in described melting pool (4) and settling pond (5) respectively arranges row's heating unit hole (2).A kind of glass electric furnace of the present utility model, can meet the middle trial production of new formula, has reduced pilot scale cost, and the time of simultaneously reloading is fast, and handiness is large, has shortened the pilot scale cycle.

Description

Glass electric furnace
Technical field
The utility model relates to glass manufacture technical field, is specifically related to a kind of glass electric furnace.
Background technology
Glass electric furnace is one of state-of-the-art melting unit of current glass industry, and the furnace type structure of glass electric furnace is simple, and floor space is little, and glass metal is engaged material and covers (cold top), is difficult for causing the volatilization of raw material.Glass electric furnace, in heat-processed, utilizes the character of glass metal conduction, is heat energy by electric energy in glass metal internal conversion, glass metal is engaged material and covers, medium dispersed heat can be reduced to bottom line towards periphery, and the thermosteresis that does not have waste gas to take out of, and thermo-efficiency is 80%~85%.In production process, can not produce waste gas, can not pollute surrounding environment, solve high, the heavy-polluted defect of flame kiln energy consumption.
All-electric melting calendering technology is produced devitrified glass at present, in the research and development of product innovation, need to adopt all-electric melting calendering technology to carry out pilot scale to new formula, and in actual research and development, what adopt is the casting forming that resistance furnace is founded, and does not conform to production technique, can not obtain well useful processing parameter, and the 3t/d glass electric furnace adopting in the past carries out pilot scale, produce continuously, pilot scale high cost, operator are more, refulling cycle is longer, and handiness is poor.
Utility model content
The utility model has overcome the deficiencies in the prior art, and the glass electric furnace that a kind of time of reloading is fast, handiness is good is provided.
Consider the problems referred to above of prior art, according to the disclosed aspect of the utility model, the utility model by the following technical solutions:
A kind of glass electric furnace, it comprises charging opening, heating unit hole, thermocouple hole, melting pool, settling pond, electrode hole, dog-hole, lower weif orifice and upper drain hole, described charging opening is connected with melting pool, described melting pool is connected with settling pond by dog-hole, described settling pond bottom is connected with lower weif orifice, described in be connected with upper drain hole in the middle part of stating settling pond; Top in described melting pool and settling pond respectively arranges one deck heating unit hole, below, heating unit hole in below, heating unit hole and the settling pond of described melting pool arranges respectively thermocouple hole, and the thermocouple hole below of described melting pool respectively arranges two-layer electrode hole with the thermocouple hole below in described settling pond.
In order to realize better the utility model, further technical scheme is:
According to an embodiment of the present utility model, the two-layer electrode hole in described melting pool stretches into the length difference of melting pool.
According to an embodiment of the present utility model, in the two-layer electrode hole in described melting pool 4 every layer.
According to an embodiment of the present utility model, the two-layer electrode hole in described settling pond stretches into the length difference of settling pond.
According to an embodiment of the present utility model, in the two-layer electrode hole in described settling pond 4 every layer.
According to an embodiment of the present utility model, the heating unit hole in described melting pool is 8.
According to an embodiment of the present utility model, the thermocouple hole in described melting pool is 2.
According to an embodiment of the present utility model, the heating unit hole in described settling pond is 8.
According to an embodiment of the present utility model, in described heating unit hole for globars is installed.
The utility model can also be:
According to an embodiment of the present utility model, the body of heater of this glass electric furnace adopts zircon corundum brick.
Compared with prior art, one of the beneficial effects of the utility model are:
A kind of glass electric furnace of the present utility model, can meet the middle trial production of new formula, has reduced pilot scale cost, and the time of simultaneously reloading is fast, and handiness is large, has shortened the pilot scale cycle.
Brief description of the drawings
For clearer explanation present specification embodiment or technical scheme of the prior art, to the accompanying drawing of required use in the description of embodiment or prior art be briefly described below, apparently, the accompanying drawing the following describes is only the reference to some embodiment in present specification, for those skilled in the art, in the situation that not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 shows according to the structural representation of the glass electric furnace of an embodiment of the utility model.
Wherein, the corresponding name of the Reference numeral in accompanying drawing is called:
1-charging opening, 2-heating unit hole, 3-thermocouple hole, 4-melting pool, 5-settling pond, 6-electrode hole, 7-dog-hole, weif orifice under 8-, the upper drain hole of 9-.
Embodiment
Below in conjunction with embodiment, the utility model is described in further detail, but embodiment of the present utility model is not limited to this.
Fig. 1 shows according to the structural representation of the glass electric furnace of an embodiment of the utility model.A kind of glass electric furnace as shown in Figure 1, it comprises charging opening 1, heating unit hole 2, thermocouple hole 3, melting pool 4, settling pond 5, electrode hole 6, dog-hole 7, lower weif orifice 8 and upper drain hole 9, described charging opening 1 is connected with melting pool 4, described melting pool 4 is connected with settling pond 5 by dog-hole 7, described settling pond 5 bottoms are connected with lower weif orifice 8, described in state settling pond 5 middle parts and be connected with upper drain hole 9; Top in described melting pool 4 and settling pond 5 respectively arranges one deck heating unit hole 2,2 belows, heating unit hole in 2 belows, heating unit hole and the settling pond 5 of described melting pool 4 arrange respectively thermocouple hole 3, and thermocouple hole 3 belows in thermocouple hole 3 belows and the described settling pond 5 of described melting pool 4 respectively arrange two-layer electrode hole 6.
Heating unit hole 2 in described melting pool 4 can be 8, and thermocouple hole 3 can be 2.
Heating unit hole 2 in described settling pond 5 can be 8, and thermocouple hole 3 can be 2.
The body of heater of glass electric furnace can adopt zircon corundum brick, the interior preferred installation globars in heating unit hole 2.Molybdenum electrode also can be installed in melting pool 4 and settling pond 5, and molybdenum electrode can be divided into two-layer up and down, and 4 every layer, level is inserted, and its effect is mainly used in fusing and clarification.Globars can be installed on Chi Ding, and globars is mainly used heating-up furnace and boosting.Molten pool 4 upper front end are charging opening 1, and drain hole and the former of settling pond 5 front end settings join.Two-layer electrode hole 6 in described melting pool 4 stretches into the length difference of melting pool 4, wherein in the two-layer electrode hole 6 in melting pool 4 every layer can be 4.Two-layer electrode hole 6 in described settling pond 5 stretches into the length difference of settling pond 5, wherein in the two-layer electrode hole 6 in settling pond 5 every layer also can be 4.By the difference of built-in length, the length that is greater than lower floor or lower floor as the length on upper strata is greater than upper strata, is conducive to the work of balanced each liquid level.
The problem of mentioning for background technology, adopts the structure of above embodiment, the small-size glass electric smelter of design 150kg/d interval type discharging, can not only meet the middle trial production of new formula, also reduce pilot scale cost, the time of simultaneously reloading is fast, handiness is large, has shortened the pilot scale cycle.
The glass electric furnace of above embodiment can be well and calendaring molding equipment join, can discharging every day once, go out glass metal 150kg at every turn, produce wide 400mm, the about 14000mm of microcrystal glass plate of thick 10mm, more when the side of reloading, the time of reloading is short, has shortened the pilot scale cycle.The processing parameter that pilot scale obtains also can be used for large-scale production, has brought into play well pilot scale effect.This pilot scale line is batch production simultaneously, compared with the pilot scale line of existing 3t/d, greatly reduce pilot scale cost, operator are reduced, and floor space is only 1/5 of existing production line, build and build discarded zircon corundum brick and the molybdenum electrode of material employing production line, saved device fabrication expense and land resources.
In this specification sheets, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is and the difference of other embodiment, identical similar part cross-references between each embodiment.
" embodiment ", " another embodiment ", " embodiment " that spoken of in this manual, etc., refer to specific features, structure or the feature described in conjunction with this embodiment and be included at least one embodiment that the application's generality describes.In specification sheets, multiple local appearance statement of the same race is not necessarily to refer to same embodiment.Furthermore, while describing a specific features, structure or feature in conjunction with arbitrary embodiment, what advocate is to realize this feature, structure or feature in conjunction with other embodiment also to drop in scope of the present utility model.
Although the utility model is described with reference to multiple explanatory embodiment of the present utility model here, but, should be appreciated that, those skilled in the art can design a lot of other amendment and embodiments, within these amendments and embodiment will drop on the disclosed principle scope and spirit of the application.More particularly, in the scope of and claim open in the application, can carry out multiple modification and improvement to the building block of subject combination layout and/or layout.Except modification that building block and/or layout are carried out with improving, to those skilled in the art, other purposes will be also obvious.

Claims (10)

1. a glass electric furnace, it is characterized in that it comprises charging opening (1), heating unit hole (2), thermocouple hole (3), melting pool (4), settling pond (5), electrode hole (6), dog-hole (7), lower weif orifice (8) and upper drain hole (9), described charging opening (1) is connected with melting pool (4), described melting pool (4) is connected with settling pond (5) by dog-hole (7), described settling pond (5) bottom is connected with lower weif orifice (8), described settling pond (5) middle part of stating is connected with upper drain hole (9), top in described melting pool (4) and settling pond (5) respectively arranges one deck heating unit hole (2), below, heating unit hole (2) in below, heating unit hole (2) and the settling pond (5) of described melting pool (4) arranges respectively thermocouple hole (3), and thermocouple hole (3) below of described melting pool (4) respectively arranges two-layer electrode hole (6) with thermocouple hole (3) below in described settling pond (5).
2. glass electric furnace according to claim 1, is characterized in that the two-layer electrode hole (6) in described melting pool (4) stretches into the length difference of melting pool (4).
3. glass electric furnace according to claim 1 and 2, is characterized in that in the two-layer electrode hole (6) in described melting pool (4) 4 every layer.
4. glass electric furnace according to claim 1, is characterized in that the two-layer electrode hole (6) in described settling pond (5) stretches into the length difference of settling pond (5).
5. according to the glass electric furnace described in claim 1 or 4, it is characterized in that in the two-layer electrode hole (6) in described settling pond (5) 4 every layer.
6. glass electric furnace according to claim 1, is characterized in that the heating unit hole (2) in described melting pool (4) is 8.
7. glass electric furnace according to claim 1, is characterized in that the thermocouple hole (3) in described melting pool (4) is 2.
8. glass electric furnace according to claim 1, is characterized in that the heating unit hole (2) in described settling pond (5) is 8.
9. glass electric furnace according to claim 1, is characterized in that in described heating unit hole (2) for globars is installed.
10. glass electric furnace according to claim 1, is characterized in that the body of heater of this glass electric furnace adopts zircon corundum brick.
CN201420357286.4U 2014-06-30 2014-06-30 Glass electric furnace Expired - Lifetime CN203960028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420357286.4U CN203960028U (en) 2014-06-30 2014-06-30 Glass electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420357286.4U CN203960028U (en) 2014-06-30 2014-06-30 Glass electric furnace

Publications (1)

Publication Number Publication Date
CN203960028U true CN203960028U (en) 2014-11-26

Family

ID=51920637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420357286.4U Expired - Lifetime CN203960028U (en) 2014-06-30 2014-06-30 Glass electric furnace

Country Status (1)

Country Link
CN (1) CN203960028U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109721222A (en) * 2019-02-19 2019-05-07 东旭科技集团有限公司 The control method of glass furnace and glass furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109721222A (en) * 2019-02-19 2019-05-07 东旭科技集团有限公司 The control method of glass furnace and glass furnace
CN109721222B (en) * 2019-02-19 2022-03-04 东旭光电科技股份有限公司 Glass kiln and control method thereof

Similar Documents

Publication Publication Date Title
CN201250173Y (en) Stepped refiner bottom structure of large-scale float glass melting furnace
CN203956048U (en) The preparation facilities of a kind of light-alloy or light metal semi solid slurry
CN203960028U (en) Glass electric furnace
CN203960029U (en) Constant temperature basalt continuous fiber electric smelter
CN108706856A (en) A kind of lateral flame furnace production system and production method of glassware
CN204097327U (en) Basalt continuous fiber wire drawing electric smelter
CN206335766U (en) A kind of plastic cement die casting
CN204097308U (en) A kind of kiln pond producing basalt continuous fiber
CN201873604U (en) All-electric melting furnace for producing basalt fibers
CN205575911U (en) Glass fiber raw materials melting electric stove
CN203033872U (en) Continuous melting furnace capable of continuously producing quartz glass plates
CN201530774U (en) Vertical glass electric melting furnace
CN204162588U (en) At the bottom of a kind of Flat Glass Furnace cooling end spoon shape pond
CN208279508U (en) A kind of glass fibre platinum alloy crucibles
CN204661545U (en) A kind of basalt continuous fiber wire-drawing frame
CN205237063U (en) Double fluid founding system
CN201825839U (en) High borosilicate glass melt stirring rod
CN203922970U (en) Heavy wall production of quartz tubes continuous induction melting furnace
CN203116532U (en) Modularized resistance wire type heater
CN202964860U (en) Mould for manufacturing quartz crucibles
CN203461947U (en) Optimized throat of unit furnace
CN203613249U (en) Simple waste tin slag smelting device
CN204063926U (en) A kind of multizone heating intellectual monitoring electric smelter
CN205177505U (en) Automatic cladding device of wire and cable insulating layer
CN216273719U (en) All-electric melting device for producing optical glass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Glass electric furnace

Effective date of registration: 20161220

Granted publication date: 20141126

Pledgee: Shanxi international China World Trade Center Co.,Ltd.

Pledgor: SICHUAN YIMING MICROCRYSTALLINE TECHNOLOGY Co.,Ltd.

Registration number: 2016990001138

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PP01 Preservation of patent right

Effective date of registration: 20200810

Granted publication date: 20141126

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20230810

Granted publication date: 20141126

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20230810

Granted publication date: 20141126

PP01 Preservation of patent right