CN203924010U - A kind of screw drives buoyancy aid door - Google Patents

A kind of screw drives buoyancy aid door Download PDF

Info

Publication number
CN203924010U
CN203924010U CN201420010070.0U CN201420010070U CN203924010U CN 203924010 U CN203924010 U CN 203924010U CN 201420010070 U CN201420010070 U CN 201420010070U CN 203924010 U CN203924010 U CN 203924010U
Authority
CN
China
Prior art keywords
screw
door
buoyancy aid
post
cabin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420010070.0U
Other languages
Chinese (zh)
Inventor
黄国富
周伟新
吴幼华
黄树权
陈京普
杨晋慧
赵璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA SHIP SCIENTIFIC RESEARCH CENTER SHANGHAI BRANCH
Original Assignee
CHINA SHIP SCIENTIFIC RESEARCH CENTER SHANGHAI BRANCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA SHIP SCIENTIFIC RESEARCH CENTER SHANGHAI BRANCH filed Critical CHINA SHIP SCIENTIFIC RESEARCH CENTER SHANGHAI BRANCH
Priority to CN201420010070.0U priority Critical patent/CN203924010U/en
Application granted granted Critical
Publication of CN203924010U publication Critical patent/CN203924010U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of screw and drive buoyancy aid door, comprise ballasting and with the described ballasting cabin body being integrated that joins, two ends at described cabin body are provided with first post and stern post, in the body of described cabin, be provided with fixing water tank, above this fixing water tank, be provided with pump equipment cabin, two ends in this pump equipment cabin are symmetrically arranged with deck layer, between first post and deck layer, be provided with hydraulic power unit, hinged-support for joining with gate pier door pillar is wherein installed on the vertical plane of first post, also comprise at least one screw, offer the vertically through-flow mouth through cabin body in one end of described cabin body, described screw is installed in above-mentioned through-flow mouthful.Compared with the impact that during with traditional rope traction buoyancy aid door actuation test, door pillar is received, for the drinking water operating condition of test screw drive scheme of the present utility model door pillar of design and ball pivot is stressed only has 900KN, be significantly less than the 1500KN of rope traction scheme.

Description

A kind of screw drives buoyancy aid door
Technical field
A kind of buoyancy aid door that the utility model relates to, relates in particular to a kind of screw and drives buoyancy aid door.
Background technology
Suzhou River is Huangpu River tributary, is the tidal river of a moderate strength, is often subject to typhoon.Suzhou River river mouth is affected by Huangpu River and Suzhou River bimodal current, streamflow regime complexity.2005, in Suzhou River river mouth, outer white transfer bridge downstream built up can " two-way water blocking; open and close flexibly " new sluice (be lower horizontal steel lock), substitute Wusong switch bridge defence Suzhou River area and suffer the function of off-lying sea morning and evening tides invasion and attack, and be that the water environment of improving this area has played key effect.But, because newly-built Suzhou River river mouth sluice is positioned at Suzhou River and enters the river mouth of Huangpu River, this place is sitting at Huangpu River bend, shipping is busy, and the operation condition of adding Suzhou River river mouth sluice is special, and underway ship be can't see gate sometimes, block ship's rigging and warning mark although be provided with before lock, but once ship's navigation is out of control or navigation in mishandling, still likely bump against newly-built Suzhou River river mouth sluice, so that badly influence safe, moistureproof, water supply and the navigation etc. of this area.
Consider importance and the particularity of engineering, the armamentarium of Suzhou River river mouth lock is arranged in the water surface or below ground (3.5m is following), and original view, style and features are not had a negative impact.River mouth lock span is large, close to river mouth, underwater portion, by maintenance-free design in 30 years, is not established access door, therefore once accident, not only maintenance difficulty is large and maintenance lasts long (3 months at least, 1 year semi-load at most).Consider that sluice is positioned at the bustling location in Shanghai, gate when maintenance river can not stop, stop navigation, and can not build cutout cofferdam, meets with wind, sudden and violent, tide three is met and discussed if happen astronomical spring tide, Suzhou River has just lost important defensive barrier, is badly in need of building the transition of emergency power tide-block sluice.Gear Chaoan in order to ensure Shanghai Central Urban Area, Suzhou River two sides is complete, prevents the adverse consequences that accident causes and reduces people's life and property loss.
The main task of Suzhou River river mouth emergency power tide-block sluice engineering is emergent gear tide,, in the time suffering off-lying sea storm tide invasion and attack, once there is accident or fault and can not normally bring into play its defensive barrier effect in newly-built Suzhou River river mouth sluice, can enable Suzhou River river mouth emergency power tide-block sluice, promptly forms second defence line, resist and within 200 years one, meet high water mark, play the effect of the damp mitigation of gear, ensure the safety of this area, but do not bear water resource scheduler task.
In addition, because engineering is located in the Main Scenic Spots, source, outbeach being formed by mansion, Shanghai, park, outbeach, Wai Bai transfer bridge UNICOM, the park, source, outbeach being connected with source, outbeach public green space will be formed along riverfront, Suzhou light greenly, therefore Suzhou River river mouth emergency power tide-block sluice engineering need with near scenic spot harmony, incorporation engineering carries out supporting landscape design.
Utility model content
The purpose of this utility model is to solve the problems of the prior art, provides a kind of screw to drive buoyancy aid door.
The technical solution of the utility model is: a kind of screw drives buoyancy aid door, comprise ballasting and with the described ballasting cabin body being integrated that joins, two ends at described cabin body are provided with first post and stern post, in the body of described cabin, be provided with fixing water tank, above this fixing water tank, be provided with pump equipment cabin, two ends in this pump equipment cabin are symmetrically arranged with deck layer, between first post and deck layer, be provided with hydraulic power unit, hinged-support for joining with gate pier door pillar is wherein installed on the vertical plane of first post, also comprise at least one screw, offer the vertically through-flow mouth through cabin body in one end of described cabin body, described screw is installed in above-mentioned through-flow mouthful.
Described through-flow mouthful two, between the two every setting, in above-mentioned through-flow mouthful, screw is all installed.
Described screw is groove-type screw.
The axle center distance of described screw is greater than the diameter of twice screw; The slurry axle center of described screw to the distance of ballasting soffit is greater than one times of airscrew diameter.
The two-port of described through-flow mouthful is provided with trashrack.
Described trashrack is outside equipped with flap valve.
Described deck layer is symmetricly set in the body of cabin with the vertical center line of cabin body, and this deck layer comprises the upper deck, middle deck and the lower decks that set gradually from top to bottom.
Also comprise an overhead door, described overhead door is installed along cabin body length direction, is provided with pull bar in the inner side of overhead door.
The height of described cabin body is less than or equal to the height of first post and stern post.
The utlity model has following beneficial effect:
(1) compared with the impact that during with traditional rope traction buoyancy aid door actuation test, door pillar is received, for the drinking water operating condition of test screw drive scheme of the present utility model door pillar of design and ball pivot is stressed only has 900KN, be significantly less than the 1500KN of rope traction scheme;
(2) this buoyancy aid door armamentarium is arranged in the water surface or below ground (3.5 meters following), and original view and style and features are not had a negative impact;
(3) drive buoyancy aid door only to open and close and need to change turning to and rotating speed of screw, therefore operation sequence is simplified greatly
(4) keying of buoyancy aid door only needs 15 minutes running time, has met the particular/special requirement that emergent gear is damp.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is the utility model upward view figure;
Fig. 3 is analysing and observe of Fig. 1;
Fig. 4 is concrete enforcement figure of the present utility model.
Detailed description of the invention
For technological means, technical characterictic, utility model object and technique effect that the utility model is realized are easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Shown in figure 1: a kind of screw drives buoyancy aid door 100, comprise ballasting 101 and with the described ballasting 101 cabin body 102 being integrated that joins, be provided with first post 1021 and stern post 1022 at the two ends of described cabin body 102, in described cabin body 102, be provided with fixing water tank 103.Above this fixing water tank 103, be provided with pump equipment cabin 104, at the symmetrically arranged deck layer 105 in the two ends in this pump equipment cabin 104, be provided with hydraulic power unit 107 at the deck layer 105 on first post 1021 and the left side.The height of cabin body 102 is less than or equal to the height of first post 1021 and stern post 1022.
The utility model middle deck layer 105 is symmetricly set in cabin body 102 with the vertical center line of cabin body 102, and this deck layer 105 comprises the upper deck 1051, middle deck 1052 and the lower decks 1053 that set gradually from top to bottom.
Hinged-support for joining with gate pier door pillar is installed on the vertical plane of first post 1021 in the utility model.The utility model comprises two screws, and the screw using in the utility model is groove-type screw, comprises that 202, one, the first screw 201 and the second screw use another as for subsequent use.A screw in use also can be installed separately.
Offer two is vertically arranged in through-flow mouthful 300 through through-flow mouth 300, the first screws 201 and second screw 202 of cabin body 102 in one end of cabin body 102.Two-port at through-flow mouthful 300 is provided with trashrack 302, and in anti-sealing, foreign material damage screw, normally use and affect it.At cabin body 102 through-flow mouthful of 300 places of a side near a river, be provided with flap valve (not shown), be used for preventing the trend leakage after buoyancy aid door is closed.
In the utility model, the axle center distance of the first screw 201 and the second screw 202 is greater than the diameter of twice screw; The slurry axle center of the first screw 201 and the second screw 202 to the distance of ballasting soffit is greater than one times of airscrew diameter.
With reference to figure 2,3, also comprise an overhead door 400, this overhead door 400 is installed along the length direction of cabin body 102, be provided with pull bar 401 in the inner side of overhead door 400, if the insufficient height of cabin body 102 in use, can boost overhead door by pull bar, to increase the height of whole cabin body 102.
Be the schematic diagram of the utility model in concrete use procedure with reference to figure 4:
(1) the groove-type screw that the utility model uses is positive and negative transition.In the time that buoyancy aid Men Gangcong warehouse compartment starts, screw is just transferring thrust makes buoyancy aid door shift out warehouse compartment, produce the impact to gate pier 500 along with the effect buoyancy aid door of current closes to close automatically, now screw starts reversion and sends pulling force, finally with the less impact buoyancy aid door 100 that closes.
(2) two screw equipment of the utility model buoyancy aid door assembling, the using and the reserved; The axle center distance of two screws is not less than twice airscrew diameter, to reduce by two interference between screw; The depth of immersion (oar axle center is to water surface distance) of screw is not less than one times of airscrew diameter and prevents the screw air-breathing negative consequence of bringing of when work;
(3) buoyancy aid door rotation angle degree.Rotate to 0 °~10 ° positions at buoyancy aid door, screw low speed forward, while rotating to 10 ° of left and right, screw quits work, during to 20 °, screw reversion slows down closing velocity, continuation with the anglec of rotation increases, and screw pulling force also constantly increases, and reaches maximum value at buoyancy aid door turn-off transient pulling force.
Be only the utility model preferred embodiment in sum, be not used for limiting practical range of the present utility model.Be that all equivalences of doing according to the content of the utility model claim change and modify, all should belong to technology category of the present utility model.

Claims (9)

1. a screw drives buoyancy aid door, comprise ballasting and with the described ballasting cabin body being integrated that joins, two ends at described cabin body are provided with first post and stern post, it is characterized in that: in the body of described cabin, be provided with fixing water tank, above this fixing water tank, be provided with pump equipment cabin, two ends in this pump equipment cabin are symmetrically arranged with deck layer, between first post and deck layer, be provided with hydraulic power unit, hinged-support for joining with gate pier door pillar is wherein installed on the vertical plane of first post, also comprise at least one screw, offer the vertically through-flow mouth through cabin body in one end of described cabin body, described screw is installed in above-mentioned through-flow mouthful.
2. screw according to claim 1 drives buoyancy aid door, it is characterized in that: described through-flow mouthful two, between the two every setting, in above-mentioned through-flow mouthful, screw is all installed.
3. screw according to claim 1 and 2 drives buoyancy aid door, it is characterized in that: described screw is groove-type screw.
4. screw according to claim 2 drives buoyancy aid door, it is characterized in that: the axle center distance of described screw is greater than the diameter of twice screw; The slurry axle center of described screw to the distance of ballasting soffit is greater than one times of airscrew diameter.
5. screw according to claim 1 and 2 drives buoyancy aid door, it is characterized in that: the two-port of described through-flow mouthful is provided with trashrack.
6. screw according to claim 5 drives buoyancy aid door, it is characterized in that: described trashrack is outside equipped with flap valve.
7. screw according to claim 1 drives buoyancy aid door, it is characterized in that: described deck layer is symmetricly set in the body of cabin with the vertical center line of cabin body, and this deck layer comprises the upper deck, middle deck and the lower decks that set gradually from top to bottom.
8. screw according to claim 1 drives buoyancy aid door, it is characterized in that: also comprise an overhead door, described overhead door is installed along cabin body length direction, is provided with pull bar in the inner side of overhead door.
9. screw according to claim 1 drives buoyancy aid door, it is characterized in that: the height of described cabin body is less than or equal to the height of first post and stern post.
CN201420010070.0U 2014-01-08 2014-01-08 A kind of screw drives buoyancy aid door Expired - Fee Related CN203924010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420010070.0U CN203924010U (en) 2014-01-08 2014-01-08 A kind of screw drives buoyancy aid door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420010070.0U CN203924010U (en) 2014-01-08 2014-01-08 A kind of screw drives buoyancy aid door

Publications (1)

Publication Number Publication Date
CN203924010U true CN203924010U (en) 2014-11-05

Family

ID=51819864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420010070.0U Expired - Fee Related CN203924010U (en) 2014-01-08 2014-01-08 A kind of screw drives buoyancy aid door

Country Status (1)

Country Link
CN (1) CN203924010U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953012A (en) * 2014-01-08 2014-07-30 中国船舶科学研究中心上海分部 Propeller driven floating gate
CN104532795A (en) * 2014-12-29 2015-04-22 中国电建集团贵阳勘测设计研究院有限公司 Unpowered trash blocking method and device for hydropower station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953012A (en) * 2014-01-08 2014-07-30 中国船舶科学研究中心上海分部 Propeller driven floating gate
CN104532795A (en) * 2014-12-29 2015-04-22 中国电建集团贵阳勘测设计研究院有限公司 Unpowered trash blocking method and device for hydropower station

Similar Documents

Publication Publication Date Title
CN104769275A (en) Bottomless cup type water power conversion device using flowing water energy
CN203021962U (en) Floating dock
CN203684174U (en) Lower opening type tumble gate
CN106049351B (en) Vertical breakwater with saturating stream berthing function
CN109421898A (en) A kind of wave energy and solar energy composite are powered navigation mark
CN104264637B (en) Clino-axis type hydraulic self-control gate
CN106284271A (en) A kind of energy-saving wheel disc type ship lock
CN203924010U (en) A kind of screw drives buoyancy aid door
CN204530611U (en) For the adjustable buoyancy tank mole of the wave that disappears under relative long wave condition
CN204385699U (en) The hollow flap gate of waterpower self-control
CN201162208Y (en) Floater horizontal opening door
CN203684176U (en) Horizontal type flood gate
CN103953012A (en) Propeller driven floating gate
JP5988319B2 (en) Land
CN201459687U (en) Water lock of underwater falling gate
CN204626351U (en) Transverse axis waterpower self-control rotary gate
CN217781935U (en) Floating box type vertical hinged door tidal gate
CN205822127U (en) There is the vertical breakwater of stream alongside function
JP2015510064A (en) P-type rectangular system (PSS)
CN206052843U (en) A kind of water taking device by buoyant raft
CN210737457U (en) Retaining dam for hydraulic engineering
CN204112290U (en) Clino-axis type hydraulic self-control gate
CN204750506U (en) Marine showy interim pier of formula design
CN207553067U (en) A kind of floatable port security door
CN211368626U (en) Vertical butterfly-shaped steel gate of solar drive

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20170108

CF01 Termination of patent right due to non-payment of annual fee