CN203905431U - Lifting type tool stacking and loading platform - Google Patents

Lifting type tool stacking and loading platform Download PDF

Info

Publication number
CN203905431U
CN203905431U CN201420331133.2U CN201420331133U CN203905431U CN 203905431 U CN203905431 U CN 203905431U CN 201420331133 U CN201420331133 U CN 201420331133U CN 203905431 U CN203905431 U CN 203905431U
Authority
CN
China
Prior art keywords
floor
platform
welded
carrying platform
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420331133.2U
Other languages
Chinese (zh)
Inventor
张明
李鹏辉
肖相文
李华能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201420331133.2U priority Critical patent/CN203905431U/en
Application granted granted Critical
Publication of CN203905431U publication Critical patent/CN203905431U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a lifting type tool stacking and loading platform. The lifting type tool stacking and loading platform comprises a rectangular platform (7) arranged above a constructing floor (6). The bottom of the rectangular platform (7) is fixedly connected with four equilong stand columns (4) through bolts (8). The four stand columns (4) penetrate through four first preformed holes (6.1) in the constructing floor (6) and then are arranged on four independent stand column bases (2) in a sleeved mode respectively, wherein the four independent stand column bases (2) are arranged on a constructed floor (1). The lifting type tool stacking and loading platform is easy to operate, fast and convenient to construct, safe and reliable in use and capable of avoiding the problem of floor cracking caused by construction in advance before the concrete floor reaches the use strength in the construction process; therefore, there is no need to conduct crack repair on the poured concrete floor in the later period, construction materials are saved, and the construction progress is accelerated.

Description

A kind of instrument heap carrying platform promoting
Technical field
The utility model relates to a kind of instrument promoting heap carrying platform for construction formwork construction, belongs to building operations auxiliary equipment technical field.
Background technology
Reinforced concrete floor later inevitably can produce micro-cracks building, and micro-cracks is very little to structure, waterproof, appearance effects, in work progress, is mainly the crack that control width is greater than 0.3mm.In building trade, there is strict requirement in Construction unit to the duration, construction party is in order to speed up the work, after reaching 1.2MPa, the concrete floor intensity of just having built just starts the construction of next process, therefore, construction party can be in advance by reinforcing bar, the large placing of material of steel pipe isodensity is on the floor of just building soon, prepare the construction for last layer floor, but by reinforcing bar, the large placing of material of steel pipe isodensity is on floor time, the pressure that floor is produced just probably surpasses 1.2MPa, will make the overload of floor pressurized, produce crack, add at tower crane handling reinforcing bar, the impact force in steel pipe process, floor being produced, and then cause crack further to expand.Yet the later stage not only wastes time and energy to the repairing of cracks on floor slab, waste construction material, and also the floor appearance effect after repairing is also relative poor with service life.
Utility model content
The purpose of this utility model is: a kind of simple to operate, quick construction is provided, can constantly promotes with story height, and the instrument the promoting heap carrying platform of the floor that can effectively prevent from constructing in advance on concrete floor and cause cracking, to overcome the deficiencies in the prior art.
A kind of instrument heap carrying platform promoting of the present utility model, comprise the rectangular platform being arranged on Hot work in progress floor, in rectangular platform bottom, adopt bolt to be fixedly connected with four isometric columns, four root posts are through after four the first preformed holes of Hot work in progress floor, and four root posts are enclosed within respectively and are arranged on construct on floor four independently on upright post base.
Described upright post base consists of on square floor the first square steel pipe welded, and the area of square floor is greater than the area of the first preformed hole.
Described column adopts the second large square steel pipe manufacturing of relative aperture the first rectangular steel tube, is welded with screw on column, and described screw welding is in the centre bore of backing plate, and cross bar and brace are fixedly connected on four root post surroundings by screw.
Described cross bar and brace adopt angle steel to make, and cross bar is provided with brace two ends the waist type screw hole being connected with screw.
Described rectangular platform comprises steel structure frame, at least 2 above third party's steel pipe peace platform cover plates, and third party's steel pipe is equidistantly welded on steel structure frame, and platform cover plate is laid on third party's steel pipe.
Described steel structure frame is to adopt work shaped steel to be welded, and at work shaped steel two ends, is welded with suspension ring.
Described platform cover plate comprises the removable cover and the securing cover plate that is welded on platform both sides of the one group of symmetry that is arranged in platform central authorities, and described removable cover adopts gemel connection on securing cover plate.
The utility model has the advantage of: compare with traditional preloading mode, the utility model is not when the concrete floor bearing strength of just having built reaches instructions for use, can in advance the weight stack such as reinforcing bar, steel pipe be placed on heap carrying platform, be convenient to the construction of last layer floor, and the strong point of heap carrying platform arranges on the floor of construction that bearing strength reached instructions for use, thereby avoid the weights such as reinforcing bar, steel pipe to be directly deposited on the concrete floor of just having built, make the concrete floor of just having built because pressure-bearing overloads, cause the problem of floor cracking.The utility model is not only simple to operate, quick construction, safe and reliable, can avoid constructing in advance when concrete floor does not reach working strength in work progress and cause the problem of floor cracking, therefore, the concrete floor later stage after building does not need to carry out crack repairing, save construction material, accelerating construction progress.In addition, the heap carrying platform in the utility model can constantly upwards promote along with the height of floor, and can reuse, and efficiency of construction improves greatly.
Accompanying drawing explanation
Structural representation when Fig. 1 is the utility model enforcement;
Fig. 2 piles carrying platform front view in the utility model;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is steel structure frame structural representation in the utility model;
Fig. 5 is the utility model central post base stereogram;
Fig. 6 is the A-A sectional view of Fig. 1.
Description of reference numerals: the 1-floor of having constructed, 1.1-the second preformed hole, 2-upright post base, 2.1-square floor, 2.2-the first rectangular steel tube, 3-cross bar, 4-column, 5-screw, 6-Hot work in progress floor, 6.1-the first preformed hole, 7-piles carrying platform, 7.1-steel structure frame, 7.2-third party's steel pipe, 7.3-platform cover plate, 7.31-removable cover, 7.32-securing cover plate, 7.4-suspension ring, 7.5-hinge, 8-bolt, 9-brace, 10-backing plate.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment of the present utility model: referring to Fig. 1, a kind of instrument heap carrying platform promoting of the present utility model, comprise the rectangular platform 7 being arranged on Hot work in progress floor 6, in rectangular platform 7 bottoms, adopt bolt 8 to be fixedly connected with four isometric columns 4, described column 4 adopts the square steel pipe manufacturing of 100 * 100 * 6mm second, four root posts 4 are through after four 200 * 200mm, first preformed hole 6.1 of Hot work in progress floor 6, and four root posts 4 are enclosed within respectively and are arranged on construct on floor 1 four independently on upright post base 2.Referring to Fig. 5, described upright post base 2 is welded on by the first rectangular steel tube 2.2 of 80 * 80 * 6mm on the square floor 2.1 of 400 * 400 * 20mm and forms, therefore, square floor 2.1 can be by the complete capping of the second preformed hole 1.1 of constructing on floor 1, after the second preformed hole 1.1 heap carrying platforms herein promote, stay, can the later stage carry out again shutoff.Referring to Fig. 6, on described column 4, be welded with screw 5, described screw 5 is welded in the centre bore of backing plate 10, increases the contact area of screw 5 roots, makes the cross bar 3 being fixed in four root post 4 surroundings be connected more firm with brace.Described cross bar 3 and brace 9 adopt the angle steel of 40 * 40 * 4mm to make, and cross bar 3 is provided with brace 9 two ends the waist type screw hole being connected with screw 5, the pitch-row error while making in order to eliminate; Referring to Fig. 2~4, described rectangular platform 7 comprises steel structure frame 7.1, and adopts 9 50 * 50 * 4mm third party steel pipes 7.2 to be equidistantly welded on steel structure frame 7.1, on platform cover plate 7.3 welding third party steel pipes 7.2; Described steel structure frame 7.1 is to adopt No. 16 work shaped steel to be welded, and at work shaped steel two ends, is welded with suspension ring 7.4, is convenient to tower crane and catches on suspension ring 7.4 by the lifting of heap carrying platform; Described platform cover plate 7.3 comprises the removable cover 7.31 of the one group of symmetry that is arranged in platform central authorities and is welded on the securing cover plate 7.32 of platform both sides, described removable cover 7.31 adopts hinge 7.5 to be connected on securing cover plate 7.32, therefore, when Hot work in progress floor 6 carries out reinforced-bar binding, in order not affect the binding of the reinforcing bar of heap below carrying platform, removable cover 7.31 can be opened.
When the utility model is specifically implemented, can adopt following steps to implement:
Step 1, before building the concrete of Hot work in progress floor 6, determine heap carrying platform placement location, then according to heap the residing position of carrying platform in the template of Hot work in progress floor 6, make four the first preformed holes 6.1;
On step 2, the floor of construction 1 under four the first preformed holes 6.1, place accordingly four independently upright post bases 2, then adopt tower crane vertically to sling heap carrying platform, after four the first preformed holes 6.1 that again four root posts 4 on heap carrying platform passed in Hot work in progress floor 6 templates, be enclosed within respectively and be arranged on construct on floor 1 four independently on upright post base 2, make to pile carrying platform bottom surface higher than the surperficial 50cm of Hot work in progress floor 6;
Step 3, in the surrounding of four root posts 4, adopt cross bar 3 and brace 9 to fix, complete the installation of the heap carrying platform of Hot work in progress floor 6, now can adopt this heap carrying platform to stack the materials such as reinforcing bar;
Step 3, after the reinforced-bar binding of Hot work in progress floor 6, while building the concrete of Hot work in progress floor 6, at the column 4 of heap carrying platform formwork around, prevent that concrete from solidifying column 4 in advance;
After the concrete of step 4, the Hot work in progress floor 6 of building reaches bearing strength and requires, now, by the cross bar 3 on heap carrying platform and brace 9 dismountings, adopt tower crane will pile carrying platform and promote straight up last layer floor, then according to method described in step 1~tri-, re-assembly heap carrying platform, therefore, heap carrying platform can be continued on for to the stacking of the materials such as reinforcing bar of last layer floor.
The utility model is not when the concrete floor bearing strength of just having built reaches instructions for use, can in advance the weight stack such as reinforcing bar, steel pipe be placed on heap carrying platform, be convenient to the construction of last layer floor, and the strong point of heap carrying platform arranges on the floor of construction that bearing strength reached instructions for use, thereby avoid the weights such as reinforcing bar, steel pipe to be directly deposited on the concrete floor of just having built, make the concrete floor of just having built because pressure-bearing overloads, cause the problem of floor cracking.The utility model is not only simple to operate, quick construction, safe and reliable, can avoid constructing in advance when concrete floor does not reach working strength in work progress and cause the problem of floor cracking, therefore, the concrete floor later stage after building does not need to carry out crack repairing, save construction material, accelerating construction progress.In addition, the heap carrying platform in the utility model can constantly upwards promote along with the height of floor, and can reuse, and efficiency of construction improves greatly.

Claims (7)

1. the instrument that can promote is piled carrying platform, comprise the rectangular platform (7) being arranged on Hot work in progress floor (6), it is characterized in that: in rectangular platform (7) bottom, adopt bolt (8) to be fixedly connected with four isometric columns (4), four root posts (4) are through after four first preformed holes (6.1) of Hot work in progress floor (6), and four root posts (4) are enclosed within respectively to be arranged on the floor of constructing (1) four independently on upright post base (2).
2. the instrument promoting according to claim 1 is piled carrying platform, it is characterized in that: described upright post base (2) is welded on the upper formation of square floor (2.1) by the first rectangular steel tube (2.2), and the area of square floor (2.1) is greater than the area of the first preformed hole (6.1).
3. the instrument promoting according to claim 1 is piled carrying platform, it is characterized in that: described column (4) adopts the second large square steel pipe manufacturing of relative aperture the first rectangular steel tube (2.2), on column (4), be welded with screw (5), described screw (5) is welded in the centre bore of backing plate (10), and cross bar (3) and brace (9) are fixedly connected on four root posts (4) surrounding by screw (5).
4. the instrument heap carrying platform promoting according to claim 3, is characterized in that: described cross bar (3) and brace (9) adopt angle steel to make, and cross bar (3) is provided with brace (9) two ends the waist type screw hole being connected with screw (5).
5. the instrument promoting according to claim 1 is piled carrying platform, it is characterized in that: described rectangular platform (7) comprises steel structure frame (7.1), at least 2 above third party's steel pipe (7.2) and platform cover plates (7.3), it is upper that third party's steel pipe (7.2) is equidistantly welded on steel structure frame (7.1), and platform cover plate (7.3) is laid on third party's steel pipe (7.2).
6. the instrument heap carrying platform promoting according to claim 5, is characterized in that: described steel structure frame (7.1) is to adopt work shaped steel to be welded, and at work shaped steel two ends, is welded with suspension ring (7.4).
7. the instrument promoting according to claim 5 is piled carrying platform, it is characterized in that: described platform cover plate (7.3) comprises the removable cover (7.31) of the one group of symmetry that is arranged in platform central authorities and be welded on the securing cover plate (7.32) of platform both sides, described removable cover (7.31) adopts hinge (7.5) to be connected on securing cover plate (7.32).
CN201420331133.2U 2014-06-20 2014-06-20 Lifting type tool stacking and loading platform Withdrawn - After Issue CN203905431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420331133.2U CN203905431U (en) 2014-06-20 2014-06-20 Lifting type tool stacking and loading platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420331133.2U CN203905431U (en) 2014-06-20 2014-06-20 Lifting type tool stacking and loading platform

Publications (1)

Publication Number Publication Date
CN203905431U true CN203905431U (en) 2014-10-29

Family

ID=51779719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420331133.2U Withdrawn - After Issue CN203905431U (en) 2014-06-20 2014-06-20 Lifting type tool stacking and loading platform

Country Status (1)

Country Link
CN (1) CN203905431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131689A (en) * 2014-06-20 2014-11-05 中国建筑第四工程局有限公司 Tool stacking platform capable of being lifted and lifting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131689A (en) * 2014-06-20 2014-11-05 中国建筑第四工程局有限公司 Tool stacking platform capable of being lifted and lifting method

Similar Documents

Publication Publication Date Title
CN104631706B (en) One kind exempts from form removal concrete column and its construction method
CN110259184A (en) Column construction method is pulled out based on Removing Columns combined support jack-up system
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
JP2023546279A (en) Lifting device for bridge water surface pile tie beam and its construction method
CN203905431U (en) Lifting type tool stacking and loading platform
CN113833263A (en) Integral lantern type support circulating hoisting construction method for frame column
CN102465605A (en) Method for building bottom plate steel bar support
CN210315253U (en) Novel aquatic tie beam bracket device
CN205369286U (en) Prefabricated isolated footing mould
CN204510215U (en) For the steel platform of foundation pit construction
CN104499706A (en) Elevator well template platform and construction method thereof
CN209179242U (en) Rammed earth wall structure and formwork thereof
CN104131689A (en) Tool stacking platform capable of being lifted and lifting method
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN106592436A (en) Manufacturing method of tool mold plate for city bridges
CN202220439U (en) Combined steel template of integral stair plate
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN201826539U (en) Reusable support frame for steel bar construction
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN102561383B (en) Tower crane base mounting method
CN204662486U (en) Can for the mutual foundation of size tower crane conversion
CN209397926U (en) A kind of elevator fence operation platform structure
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN204238534U (en) A kind of concrete floor is piled in advance and is unloaded carrying platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141029

Effective date of abandoning: 20160608

C25 Abandonment of patent right or utility model to avoid double patenting