CN203891422U - Marble pillar installed on floor of underground parking garage of housing district - Google Patents

Marble pillar installed on floor of underground parking garage of housing district Download PDF

Info

Publication number
CN203891422U
CN203891422U CN201420189800.8U CN201420189800U CN203891422U CN 203891422 U CN203891422 U CN 203891422U CN 201420189800 U CN201420189800 U CN 201420189800U CN 203891422 U CN203891422 U CN 203891422U
Authority
CN
China
Prior art keywords
steel
floor
cylindrical tube
pedestal
underground parking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420189800.8U
Other languages
Chinese (zh)
Inventor
林叶
苏加春
吴汉民
刘伟强
谢玉霜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Province Landscape Engineering In Spring Co Ltd
Original Assignee
Fujian Province Landscape Engineering In Spring Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Province Landscape Engineering In Spring Co Ltd filed Critical Fujian Province Landscape Engineering In Spring Co Ltd
Priority to CN201420189800.8U priority Critical patent/CN203891422U/en
Application granted granted Critical
Publication of CN203891422U publication Critical patent/CN203891422U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a marble pillar installed on the floor of an underground parking garbage of a housing district. The marble pillar comprises a substrate, a pre-buried steel plate, a cylindrical steel tube frame, a marble pillar surface precast slab and a waterproof asphalt layer, wherein the substrate is fixed on the upper side of the floor of the underground parking garbage of the housing district, the middle part of the substrate is reserved with a pre-burying hole, the substrate is uniformly provided with a plurality of studs on the lower side of the pre-burying hole, the pre-buried steel plate is placed in the pre-burying hole and fixed to the plurality of studs by welding, the marble pillar surface precast slab is fixed on the cylindrical steel tube frame, and the substrate is covered with the waterproof asphalt layer. Through adding the substrate, pre-burying the steel plate and adding the waterproof asphalt layer, series of difficulties in the installation of a dry-hanging type marble pillar on the floor of the underground parking garbage are effectively solved.

Description

A kind of FRP Columns being installed on the floor of underground parking, community
Technical field
The utility model relates to the view FRP Columns in residential quarter, specifically refers to a kind of FRP Columns being installed on the floor of underground parking, community.
Background technology
Along with the raising of people's living standard, they material and aesthetic on had higher asking most, for the finishing at home, fashion is their eternal target.At present, FRP Columns is used in view finishing, particularly in the view in urban cells, enjoys high praise.But, due to the problem of the weight of FRP Columns own, be provided with in the community of underground parking and generally cannot install FRP Columns, make community view come less to there is together fine view.In order to alleviate the weight of FRP Columns itself; can be used by the floor of underground parking; people adopt cladding way to carry out FRP Columns making; because the thickness of the floor with underground parking is limited; there is this series of difficult problem for installation, support and the location of dry-hang FRP Columns, and often there will be the situation that causes floor appearance infiltration due to the installation of FRP Columns.
Utility model content
The utility model is to provide a kind of FRP Columns being installed on the floor of underground parking, community, by setting up pedestal, pre-embedded steel slab and setting up the ways such as water proofing asphalt layer, a series of difficult problems that dry-hang FRP Columns installs on the floor of underground parking are effectively solved.
The technical solution of the utility model is:
A kind of FRP Columns being installed on the floor of underground parking, community, comprise pedestal, pre-embedded steel slab, steel cylindrical tube skeleton, Rome cylinder precast plate and water proofing asphalt layer, described pedestal is fixed on floor top, community parking field, described pedestal is to be formed by concreting, the high 25-30cm of pedestal, described pedestal mid portion is reserved with the pre-buried cave that 8-12cm is dark, described pedestal is evenly equipped with many pegs below pre-buried cave, and described pre-embedded steel slab is placed in pre-buried cave and with described many pegs and is welded and fixed; The pipe thickness of described steel cylindrical tube skeleton is 3-5mm, and described steel cylindrical tube skeleton is fixedly welded in the centre position of described pre-embedded steel slab, and the outer wall of described steel cylindrical tube skeleton is welded with accordingly and admittedly first connects angle steel by equal angles; Described Rome cylinder precast plate internal preset has corresponding the second affixed angle steel, and one end of described the second affixed angle steel is embedded in FRP Columns face precast plate inside in advance, and the other end stretches out Rome cylinder precast plate inner wall outside; Being fixed welding by described the second angle steel and the first angle steel is fixed on Rome cylinder precast plate on described steel cylindrical tube skeleton; The top of described pedestal is coated with one deck water proofing asphalt layer.
Between described steel cylindrical tube skeleton and described pre-embedded steel slab, be uniformly distributed and be welded with 3-5 reinforcement steel plate by equal angles.
Advantage of the present utility model:
The utility model is set up pedestal on floor, has effectively prevented that the installation of FRP Columns from damaging floor; By pre-embedded steel slab, between steel cylindrical tube skeleton and pre-embedded steel slab, add strong steel plate, effectively ensure the installation stability of this FRP Columns; Finally also on pedestal, cover one deck water proofing asphalt layer and stop to occur the situation of floor infiltration, make this FRP Columns can be without on the floor that is installed in underground parking of future trouble; That the utility model also has advantages of is simple in structure, be easy to make, cost of production is low.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Now embodiment is described in further detail structure of the present utility model by reference to the accompanying drawings for the ease of it will be appreciated by those skilled in the art that:
With reference to figure 1, a kind of FRP Columns being installed on the floor of underground parking, community, comprise pedestal 1, pre-embedded steel slab 2, steel cylindrical tube skeleton 3, Rome cylinder precast plate 4 and water proofing asphalt layer 5, described pedestal 1 is fixed on floor 6 tops, community parking field, described pedestal 1 is to be formed by concreting, the high 28cm of pedestal 1, described pedestal 1 mid portion is reserved with the pre-buried cave that 10cm is dark, described pedestal 1 is evenly equipped with many pegs 7 below pre-buried cave, and described pre-embedded steel slab 2 is placed in pre-buried cave and with described many pegs 7 and is welded and fixed; The pipe thickness of described steel cylindrical tube skeleton 3 is 4mm, and described steel cylindrical tube skeleton 3 is fixedly welded in the centre position of described pre-embedded steel slab 2, and the outer wall of described steel cylindrical tube skeleton 3 is welded with accordingly and admittedly first connects angle steel 8 by equal angles; Described Rome cylinder precast plate 4 internal preset have corresponding the second affixed angle steel 9, and one end of described the second affixed angle steel 9 is embedded in FRP Columns face precast plate 4 inside in advance, and the other end stretches out Rome cylinder precast plate 4 inner wall outside; Being fixed welding by described the second angle steel 9 and the first angle steel 8 is fixed on Rome cylinder precast plate 4 on described steel cylindrical tube skeleton 3; The top of described pedestal 1 is coated with one deck water proofing asphalt layer 5.
Between described steel cylindrical tube skeleton 3 and described pre-embedded steel slab 2, be uniformly distributed and be welded with 4 reinforcement steel plates 10 by equal angles.
The utility model is set up pedestal 1 on floor 6, has effectively prevented that the installation of FRP Columns from damaging floor 6; By pre-embedded steel slab 2, between steel cylindrical tube skeleton 3 and pre-embedded steel slab 2, add strong steel plate 10, effectively ensure the installation stability of this FRP Columns; Finally also on pedestal 1, cover one deck water proofing asphalt layer 5 and stop to occur the situation of floor infiltration, this FRP Columns can be installed on the floor of underground parking smoothly.
The foregoing is only preferred embodiment of the present utility model, all equalizations of doing according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.

Claims (2)

1. the FRP Columns being installed on the floor of underground parking, community, comprise pedestal, pre-embedded steel slab, steel cylindrical tube skeleton, Rome cylinder precast plate and water proofing asphalt layer, it is characterized in that: described pedestal is fixed on floor top, community parking field, described pedestal is to be formed by concreting, the high 25-30cm of pedestal, described pedestal mid portion is reserved with the pre-buried cave that 8-12cm is dark, described pedestal is evenly equipped with many pegs below pre-buried cave, and described pre-embedded steel slab is placed in pre-buried cave and with described many pegs and is welded and fixed; The pipe thickness of described steel cylindrical tube skeleton is 3-5mm, and described steel cylindrical tube skeleton is fixedly welded in the centre position of described pre-embedded steel slab, and the outer wall of described steel cylindrical tube skeleton is welded with corresponding the first affixed angle steel by equal angles; Described Rome cylinder precast plate internal preset has corresponding the second affixed angle steel, and one end of described the second affixed angle steel is embedded in FRP Columns face precast plate inside in advance, and the other end stretches out Rome cylinder precast plate inner wall outside; Being fixed welding by described the second angle steel and the first angle steel is fixed on Rome cylinder precast plate on described steel cylindrical tube skeleton; The top of described pedestal is coated with one deck water proofing asphalt layer.
2. a kind of FRP Columns being installed on the floor of underground parking, community according to claim 1, is characterized in that: between described steel cylindrical tube skeleton and described pre-embedded steel slab, be uniformly distributed and be welded with 3-5 reinforcement steel plate by equal angles.
CN201420189800.8U 2014-04-18 2014-04-18 Marble pillar installed on floor of underground parking garage of housing district Expired - Fee Related CN203891422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420189800.8U CN203891422U (en) 2014-04-18 2014-04-18 Marble pillar installed on floor of underground parking garage of housing district

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420189800.8U CN203891422U (en) 2014-04-18 2014-04-18 Marble pillar installed on floor of underground parking garage of housing district

Publications (1)

Publication Number Publication Date
CN203891422U true CN203891422U (en) 2014-10-22

Family

ID=51717838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420189800.8U Expired - Fee Related CN203891422U (en) 2014-04-18 2014-04-18 Marble pillar installed on floor of underground parking garage of housing district

Country Status (1)

Country Link
CN (1) CN203891422U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631898A (en) * 2015-01-20 2015-05-20 成都格瑞思文化传播有限公司 Dry-hang type marble pillar convenient to build
CN107313553A (en) * 2017-07-25 2017-11-03 高志斌 A kind of dry-hang FRP Columns based on fiber colored stone concrete slab
CN109944389A (en) * 2019-03-26 2019-06-28 中国建筑第八工程局有限公司 It is installed on the edge list and its construction method of structure floor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631898A (en) * 2015-01-20 2015-05-20 成都格瑞思文化传播有限公司 Dry-hang type marble pillar convenient to build
CN107313553A (en) * 2017-07-25 2017-11-03 高志斌 A kind of dry-hang FRP Columns based on fiber colored stone concrete slab
CN109944389A (en) * 2019-03-26 2019-06-28 中国建筑第八工程局有限公司 It is installed on the edge list and its construction method of structure floor

Similar Documents

Publication Publication Date Title
CN104947788B (en) A kind of modular assembly formula building systems and its method of construction
CN204662499U (en) Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN203891422U (en) Marble pillar installed on floor of underground parking garage of housing district
CN102587416A (en) Basement attached lane structure and construction method thereof
CN203213591U (en) Beam-free turbinate column cap structure template system
CN204401650U (en) Square longitudinally connection prestressed assembly formula underground pipe gallery
CN106088260A (en) A kind of Homofloor drainage system of novel building toilet
CN202466623U (en) Basement attached lane structure
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN203238621U (en) Grouting pile provided with double layers of tensile bars
CN204780999U (en) Stealthy inspection shaft structure
CN103790181A (en) Daylight illumination device pier base and manufacturing method thereof
CN203878718U (en) Joint structure of cover plate of trench and pipe trench
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN204609425U (en) A kind of dry-hang FRP Columns being easy to build
JP5302441B2 (en) Construction method of concrete container house
CN205382727U (en) Lightweight steel construction house
CN202000463U (en) Prefabricated reinforced concrete drainage inspection well
CN203247747U (en) Ridge waterproof and heat-insulation structure
CN206189916U (en) Bathroom room
CN205062849U (en) Can plant green plant's cable well cover plate structure
CN206035047U (en) Prefabricated assembled underground granary of plastic cover
CN203049604U (en) Granite pond
CN206189914U (en) Bathroom room
CN104531508B (en) A kind of anaerobic digestor and assembling method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20160418

CF01 Termination of patent right due to non-payment of annual fee